EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm  ELOG logo
Message ID: 158     Entry time: Wed Mar 8 09:31:43 2023
Author: IK 
Type: Runs 
test:  
Category: General 
Subject: Run 48 stopped, run 49 started 

Run 48 stopped at 9:29 to start a new run.

Run 49 is started okay at 9:31.

 

run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0041.caendat

RU =  10.1 MB/s

LF =   4.68MB/s

plunger:

plunger run = 582

actual distance =  383.1 um

supposed distance = 382.7 um

micrometer =   385.8 um

position =  150.5 um

voltage =  2.145 V

 

Beam dump 0.7 nA

 

 

 

 

 

 

ELOG V3.1.5-fc6679b