Message ID: 175     Entry time: Thu Mar 9 01:41:50 2023
Author: GJ 
Type: Problem Fixed 
test:  
Category: Hardware 
Subject: TS zeroing - cables to S-IN from VME controller - between runs 49 and 50 
Since we were observing jumps of 16 ns in timings of all channels of whole boards, the assumption was that the 
signals from logical FIFO arrive at different times to S-IN inputs to zero the TS counters.
6 originally placed cables of quite the same length were replaced with 6 cables of declared 3-ns length, same 
producer, borrowed from NW's equipment.