EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm  ELOG logo
Message ID: 37     Entry time: Thu Mar 2 17:28:21 2023
Author: BS 
Type: Runs 
test:  
Category:  
Subject: Run 33 Started 

Run 33 Started

Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 6.5 um

Voltage = 7.957 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

 

20:50   Observed beam dropped by a factor of 2 (1.5 enA on the beam dump). Asked the operator to improve beam. 

run stop 22:53 acquisition problem

ELOG V3.1.5-fc6679b