EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm  ELOG logo
Message ID: 39     Entry time: Thu Mar 2 23:04:01 2023
Author: GJ 
Type: Problem Fixed 
test:  
Category: Hardware 
Subject: Connection of the plunger cables, grounding, beam read-out for the operators 
Notes of the measurements with different conditions are attached.

Conclusion:
What is read out by the operators on the blue cable should be multiplied by 7 to get a real value in enA.
Attachment 1: Slp823030222550.pdf  214 kB  | Hide | Hide all
Slp823030222550.pdf
ELOG V3.1.5-fc6679b