Category: General 
Subject:  

AF

UN CONTROL = 36

Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0154.caendat

RU = 5.91 MB/s

LF = 3.43 MB/s

Plunger ;

Planger run = 563

Supposed Dist=10 um

Actual Distance = 9.8 um

micrometer = 11.0 um

Position = 10.1 um

Voltage = 7.947 V

Beam dumb =

Collimeter =

 

Stopped at 10.51 pm

Plan: change the distance between the target and the stopper

Plunger run nr at stop: 582

beam current at stop: 0.9 enA at the beam dump

 