Before this run TSs were moved on the LF level, so the BU has easier job to do and everything is more stable.
BU gate was changed from 1500 to 500 ns, this stay valid from now on.
Run 40 Started.
New target
Offset 100 um
RUN CONTROL = 40
Data = /onlineNEDA_00/xData/hil099/run_0040_06-03-2023_00h38m10s/needleRU_i40_0040_0000.caendat
RU = 7.21 MB/s
LF = 3.55 MB/s
Plunger ;
Planger run = 8
0-Point = 232, 7 um
Supposed Distance = 234,7 um
Micrometer = 187.5 um
Position = 241.1 um
Actual Distance = 234,5 um
Voltage =4,106V
Beam dumb =
Collimeter = |