EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm  ELOG logo
Message ID: 93     Entry time: Mon Mar 6 00:43:27 2023
Author: BS, GJ 
Type: Runs 
test:  
Category: General 
Subject: Run 40 Started 

Before this run TSs were moved on the LF level, so the BU has easier job to do and everything is more stable.

BU gate was changed from 1500 to 500 ns, this stay valid from now on.

 

 

Run 40 Started.

New target

Offset 100 um

RUN CONTROL = 40

Data = /onlineNEDA_00/xData/hil099/run_0040_06-03-2023_00h38m10s/needleRU_i40_0040_0000.caendat

RU = 7.21 MB/s

LF = 3.55 MB/s

Plunger ;

Planger run = 8

0-Point = 232, 7 um

Supposed Distance = 234,7 um

Micrometer = 187.5 um

Position = 241.1 um

Actual Distance = 234,5 um

Voltage =4,106V

Beam dumb =

Collimeter =

Attachment 1: LocalFilter.conf  1 kB  Uploaded Thu Mar 30 19:28:43 2023  | Show | Show all
ELOG V3.1.5-fc6679b