Tue Jan 23 16:55:21 2024, yes, Other, , , 106Cd certificate
|
| |
Mon Mar 20 04:55:24 2023, MP, Other, , , missing caendat.bz2 on Bahadir's disk
|
The following caendat.bz2 files were not copied to Bahadir's disks
(because they were not bzipped at the time of the copying):
|
Thu Mar 16 12:13:11 2023, MP, Other, , , test of radioactivity  
|
16/03/2023
Plunger chamber closed, some dummy target and stopper probably inside
run 72 eagle closed |
Mon Mar 13 15:16:21 2023, MP, Other, , , list of files copied to Bahadir's disks 
|
Attached are the lists of files copied to the two 4 TB Bahadir's disks.
|
Mon Mar 13 12:16:31 2023, MP, Other, , , run 66
|
run 66 started, radiocativity (background)
|
Mon Mar 13 12:15:35 2023, MP, Other, , , measurement of radioactivity along the beam line
|
At about 12:00, 13/03/2023 (about 17 hours after the beam was stopped), a measurement of activity of the beam line was performed using FH
40G-L10 meter.
Radioctivity run 65 stopped before the measurement, radioactivity run 66 started after the measurement |
Sun Mar 12 22:52:36 2023, Bahadir Saygi, Other, , General, Plunger Run Files 
|
| Plunger run files for later to calculate error in the distance |
Sun Mar 12 21:33:54 2023, GJ, Runs, , General, run 63 - 152 Eu during LN2 filling
|
| |
Sun Mar 12 20:55:08 2023, MP, Runs, , , runc62 152 for efficiency calibration
|
started
source in the target position, as precisely as possible
|
Sun Mar 12 20:31:45 2023, GJ, Runs, , General, run_61 - target and stopper and beam dump dismounted.
|
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained.
|
Sun Mar 12 19:20:37 2023, MP, Runs, , General, run 60, radioactivity,
|
Run 59 collected data using gg trigger radioactivty
Run 60 trigger changed fropm gg to single g.
Just in the beginning a few minutes gg data could have been collected. |
Sun Mar 12 19:00:59 2023, OST, Runs, , General, Run 58 stopped and Run 59 started.
|
18:54 Run 58 stopped and 18:55 Run 59 started.
BEAM STOPPED.
END of EXPERIMENT. |
Sun Mar 12 18:50:37 2023, OST, Runs, , General,
|
run control = 58
run data =xdaq 471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat
RU = 7.35 MB/s |
Sun Mar 12 17:03:12 2023, OST, Runs, , General,
|
run control = 58
run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat
RU = 7.14 MB/s |
Sun Mar 12 13:20:00 2023, EG, Problems, , , No Data
|
For a split second a red "NO DATA" notification appeared in the top right corner of Counting rates dashboard.
It looks like it did not change anything in data collection.
|
Sun Mar 12 09:15:00 2023, EG, Other, , , Array_monitors mat refresh synchronization
|
Beam stable, counting rate within limits, plunger distance within the given tollerance, gamma spectra ok, everything looks good but....
(yes there must be some "but"), refreshing of EAGLE_array_monitor.mat and NEDA_array_monitor.mat are out of sync. Mostly pure red colour
is dysplayed. Not very usefull and (I suppose) missleading information. |
Sun Mar 12 08:03:08 2023, OST, Runs, , General,
|
run control = 58
run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat
RU = 7.88 MB/s |
Sun Mar 12 07:01:31 2023, OST, Runs, , General,
|
run control = 58
run data =xdaq 2254808224 Mar 12 06:59 needleRU_i58_0058_0017.caendat
RU = 8.10 MB/s |
Sun Mar 12 04:20:19 2023, OST, Runs, , General, Run 57 stopped, Run 58 started
|
| |
Sun Mar 12 03:23:05 2023, AF, Runs, , General, run_0057
|
run control = 57
run data =/onlineNEDA_00/xData/hil099/run_0057_12-03-2023_03h10m10s/
RU = 8.1 MB/s |
|