EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 1 of 14  ELOG logo
Entry  Tue Jan 23 16:55:21 2024, yes, Other, , , 106Cd certificate Slp823030223120.pdf
 
Entry  Mon Mar 20 04:55:24 2023, MP, Other, , , missing caendat.bz2 on Bahadir's disk 
The following  caendat.bz2 files were not copied to Bahadir's disks 
(because they were not bzipped at the time of the copying):
Entry  Thu Mar 16 12:13:11 2023, MP, Other, , , test of radioactivity rings_16mar2023_0905.pngrings143_16mar2023_0908.pngrings143_16mar2023_0920.png
16/03/2023

Plunger chamber closed, some dummy target and stopper probably inside

run 72    eagle closed
Entry  Mon Mar 13 15:16:21 2023, MP, Other, , , list of files copied to Bahadir's disks disk1.list_of_filesdisk2.list_of_files
Attached are the lists of files copied to the two 4 TB Bahadir's disks.

 

 
Entry  Mon Mar 13 12:16:31 2023, MP, Other, , , run 66 
run 66 started, radiocativity (background)

 
Entry  Mon Mar 13 12:15:35 2023, MP, Other, , , measurement of radioactivity along the beam line 
At about 12:00, 13/03/2023 (about  17 hours after the beam was stopped), a measurement of activity of the beam line was performed using  FH
40G-L10 meter.

Radioctivity run 65 stopped before the measurement, radioactivity run  66 started after the measurement
Entry  Sun Mar 12 22:52:36 2023, Bahadir Saygi, Other, , General, Plunger Run Files  134Sm_cont.zip134Sm.zip
Plunger run files for later to calculate error in the distance
Entry  Sun Mar 12 21:33:54 2023, GJ, Runs, , General, run 63 - 152 Eu during LN2 filling 
 
Entry  Sun Mar 12 20:55:08 2023, MP, Runs, , , runc62 152 for efficiency calibration 
started

source in the target position, as precisely as possible

 
Entry  Sun Mar 12 20:31:45 2023, GJ, Runs, , General, run_61 - target and stopper and beam dump dismounted. 
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained. 
Entry  Sun Mar 12 19:20:37 2023, MP, Runs, , General, run 60, radioactivity,  
Run 59 collected data using gg trigger radioactivty

Run 60 trigger changed fropm gg to single g.

Just in the beginning a few minutes gg data could have been collected.
Entry  Sun Mar 12 19:00:59 2023, OST, Runs, , General, Run 58 stopped and Run 59 started. 
18:54 Run 58 stopped and 18:55 Run 59 started.

BEAM STOPPED.

END of EXPERIMENT.
Entry  Sun Mar 12 18:50:37 2023, OST, Runs, , General,  
run control = 58

run data =xdaq  471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat

RU = 7.35 MB/s
Entry  Sun Mar 12 17:03:12 2023, OST, Runs, , General,  
run control = 58

run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat

RU = 7.14 MB/s
Entry  Sun Mar 12 13:20:00 2023, EG, Problems, , , No Data 
For a split second a red "NO DATA" notification appeared in the top right corner of Counting rates dashboard.

It looks like it did not change anything in data collection.

Entry  Sun Mar 12 09:15:00 2023, EG, Other, , , Array_monitors mat refresh synchronization 
Beam stable, counting rate within limits, plunger distance within the given tollerance, gamma spectra ok, everything looks good but....

(yes there must be some "but"), refreshing of EAGLE_array_monitor.mat and NEDA_array_monitor.mat are out of sync. Mostly pure red colour
is dysplayed. Not very usefull and (I suppose) missleading information.
Entry  Sun Mar 12 08:03:08 2023, OST, Runs, , General,  
run control = 58

run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat

RU = 7.88 MB/s
Entry  Sun Mar 12 07:01:31 2023, OST, Runs, , General,  
run control = 58

run data =xdaq 2254808224 Mar 12 06:59 needleRU_i58_0058_0017.caendat

RU = 8.10 MB/s
Entry  Sun Mar 12 04:20:19 2023, OST, Runs, , General, Run 57 stopped, Run 58 started  
 
Entry  Sun Mar 12 03:23:05 2023, AF, Runs, , General, run_0057 
run control = 57

run data =/onlineNEDA_00/xData/hil099/run_0057_12-03-2023_03h10m10s/

RU = 8.1 MB/s
ELOG V3.1.5-fc6679b