EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 1 of 14  ELOG logo
ID Date Author Type test Category Subjectdown
  217   Fri Mar 10 21:24:29 2023 IPRuns Beamthe beam stopped

the beam is stopped at 21:23.

  220   Fri Mar 10 21:30:42 2023 IPProblem Fixed Beamthe beam is focused

the beam is now good focused

  215   Fri Mar 10 21:00:15 2023 IPProblem Fixed Beamthe beam comes back

the beam comes back at 20:54

  263   Thu Mar 16 12:13:11 2023 MPOther  test of radioactivity

16/03/2023

Plunger chamber closed, some dummy target and stopper probably inside

run 72    eagle closed

run 73    right half of EAGLE completely opened


Three screenshots are attached:

Run 72  EAGLE closed

1)  Three rings.  There is significantly more 511 in ring 143 than in 117, 101

2) 5 detectors of ring 143. They all look similar to each other.

Run 73  right half of EAGLE opened

3) 5 detectors of ring 143.  The 3 detectors in the opened half hardly see 511 keV, the other 2 do.

 

Check with Colibri and a gamma scintillator probe ws done: largest activity is visible close to the target chamber, in the region starting at the edge of the chamber, end ending about 6 cm upstream.

About 80 gamma counts/s are seen there. The count rate decreases further upstream.

Background rate:  20 to 30 counts/s, 25 counts/s in Sala Fizykow.

Radioactivity line seen in the spectra,  with the same behaviour as 511:   743.5,  936 keV, 1434 keV.  These are lines from 52Cr, fed by beta+ decay of 52Mn.

Confirmed by Michain gamma-gamma.

52Mn can be produced in the a2pn channel in  the reaction 32S+27Al

 

Attachment 1: rings_16mar2023_0905.png
rings_16mar2023_0905.png
Attachment 2: rings143_16mar2023_0908.png
rings143_16mar2023_0908.png
Attachment 3: rings143_16mar2023_0920.png
rings143_16mar2023_0920.png
  4   Mon Feb 27 12:10:24 2023 BSOther Targettarget
Support of Target = 1.5 mg/cm2 Ta
Target            = 1.0 mg/cm2 Cd-106
Stopper           = 10 mg/cm2 Au
Beam Dump         = ~60 mg/cm2 Au
  211   Fri Mar 10 19:30:48 2023 IPRuns Beamstop beam

the beam was stopped at 19:27


 

  212   Fri Mar 10 19:32:01 2023 IPRuns Beamstart beam

the beam start: 19:31

  70   Sat Mar 4 15:02:54 2023 mgbRuns Generalrunning stable

RUN CONTROL = 36

Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0122.caendat

RU = 5.99

LF = 3.35

Plunger ;

Planger run = 504

Supposed Dist=10

Micrometer = 11.1

Position = 10.2

Voltage = 8.964

Beam dumb = 1 nA

Collimeter =0.7 nA

  257   Sun Mar 12 20:55:08 2023 MPRuns  runc62 152 for efficiency calibration

started

source in the target position, as precisely as possible

 

  256   Sun Mar 12 20:31:45 2023 GJRuns Generalrun_61 - target and stopper and beam dump dismounted.
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained. 

pure background, g trigger only.

Michal says the"bg" spectrum did not change...
  246   Sun Mar 12 03:23:05 2023 AFRuns Generalrun_0057

run control = 57

run data =/onlineNEDA_00/xData/hil099/run_0057_12-03-2023_03h10m10s/

RU = 8.1 MB/s

LF =   3.8 MB/s

plunger:

plunger run = 1484

actual distance =  262.7 um

 

micrometer =   266.9 um

position = 30 um

voltage =  3.306 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop:

  243   Sat Mar 11 23:30:47 2023 AFRuns Generalrun_0056

run control = 56

run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s

RU = 7.3 MB/s

LF =   3.5 MB/s

plunger:

plunger run = 1445

actual distance =  262.7 um

 

micrometer =   266.2 um

position = 30 um

voltage =  3.05 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop:

  242   Sat Mar 11 22:52:48 2023 BSRuns Generalrun_0055

run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0137.caendat

RU = 4.17 MB/s

LF =   3.11 MB/s

plunger:

plunger run = 1439

actual distance =  515 um

 

micrometer =   578.2 um

position = 282.3 um

voltage =  1.372 V

 

Beam dump: 0.75 nA 

Colimator :  1.1 enA

 

stop: 11.15 pm -> new plunger distance

 

  127   Tue Mar 7 09:18:01 2023 OSTProblems Beamrun number 44 crashed and local filter turned red-but data saved

9:08 local filter turned red. Both .caendat and   LF .adf files still incrementing. Stopped run 44, started run 45, looks OK.

 

 

Attachment 1: run_control_7mar2023_0910.png
run_control_7mar2023_0910.png
  261   Mon Mar 13 12:16:31 2023 MPOther  run 66

run 66 started, radiocativity (background)

 

  258   Sun Mar 12 21:33:54 2023 GJRuns Generalrun 63 - 152 Eu during LN2 filling
  255   Sun Mar 12 19:20:37 2023 MPRuns Generalrun 60, radioactivity,

Run 59 collected data using gg trigger radioactivty

Run 60 trigger changed fropm gg to single g.

Just in the beginning a few minutes gg data could have been collected.

  226   Sat Mar 11 00:05:06 2023 IPRuns Generalrun 54 - stopped

run 54 - stopped due to change the distance in plunger

  • Run number: 54
  • Start time: Fri Mar 10 23:14:54 2023
  • Stop time: Sat Mar 11 00:02:37 2023
  223   Fri Mar 10 23:27:51 2023 IPProblems Softwarerun 53 - stopped

the daq crashed at 22:43 -- problem with Local Filter

the run 53 - stopped

  207   Fri Mar 10 16:17:57 2023 IPRuns Generalrun 52 - stopped

run 52 - stopped

 

  • Run number: 52
  • Start time: Fri Mar 10 01:19:56 2023
  • Stop time: Fri Mar 10 16:16:25 2023
ELOG V3.1.5-fc6679b