EAGLE
IRRADIATIONS
EXTERNAL
Analysis
Students Workshop
Shift Plans
GAMMA-ONLY
NEEDLE NEEDI
COULEX
PLUNGER
GENERAL
HIL102-128Cs
HIL087-176Pt
Nd148_2
176Pt
HIL109-172Os
HIL124-128Cs
HIL061
Nd148
HIL106-119Cs
HIL097-118Xe
HIL099-134Sm
April16
xdaq
HIL099-134Sm, Page 1 of 14
New
|
Find
|
Config
|
Logout
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Runs
Problems
Problem Fixed
Other
264 Entries
Goto page 1,
2
,
3
...
12
,
13
,
14
Next
All
ID
Date
Author
Type
test
Category
Subject
Text
217
Fri Mar 10 21:24:29 2023
IP
Runs
Beam
the beam stopped
the beam is stopped at 21:23.
220
Fri Mar 10 21:30:42 2023
IP
Problem Fixed
Beam
the beam is focused
the beam is now good focused
215
Fri Mar 10 21:00:15 2023
IP
Problem Fixed
Beam
the beam comes back
the beam comes back at 20:54
263
Thu Mar 16 12:13:11 2023
MP
Other
test of radioactivity
16/03/2023
Plunger chamber closed, some dummy
target and stopper probably inside
4
Mon Feb 27 12:10:24 2023
BS
Other
Target
target
Support of Target = 1.5 mg/cm2 Ta
Target = 1.0 mg/cm2 Cd-106
Stopper = 10 mg/cm2 Au
211
Fri Mar 10 19:30:48 2023
IP
Runs
Beam
stop beam
the beam was stopped at 19:27
212
Fri Mar 10 19:32:01 2023
IP
Runs
Beam
start beam
the beam start: 19:31
70
Sat Mar 4 15:02:54 2023
mgb
Runs
General
running stable
RUN CONTROL = 36
Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0122.caendat
RU = 5.99
257
Sun Mar 12 20:55:08 2023
MP
Runs
runc62 152 for efficiency calibration
started
source in the target position,
as precisely as possible
256
Sun Mar 12 20:31:45 2023
GJ
Runs
General
run_61 - target and stopper and beam dump dismounted.
target and stopper and beam dump dismounted.
only the constructional elements of the plunger
remained.
246
Sun Mar 12 03:23:05 2023
AF
Runs
General
run_0057
run control = 57
run data =/onlineNEDA_00/xData/hil099/run_0057_12-03-2023_03h10m10s/
RU = 8.1 MB/s
243
Sat Mar 11 23:30:47 2023
AF
Runs
General
run_0056
run control = 56
run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s
RU = 7.3 MB/s
242
Sat Mar 11 22:52:48 2023
BS
Runs
General
run_0055
run control = 55
run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0137.caendat
RU = 4.17 MB/s
127
Tue Mar 7 09:18:01 2023
OST
Problems
Beam
run number 44 crashed and local filter turned red-but data saved
9:08 local filter turned red. Both .caendat
and LF .adf files still incrementing.
Stopped run 44, started run 45, looks OK.
261
Mon Mar 13 12:16:31 2023
MP
Other
run 66
run 66 started, radiocativity (background)
258
Sun Mar 12 21:33:54 2023
GJ
Runs
General
run 63 - 152 Eu during LN2 filling
255
Sun Mar 12 19:20:37 2023
MP
Runs
General
run 60, radioactivity,
Run 59 collected data using gg trigger
radioactivty
Run 60 trigger changed fropm gg
226
Sat Mar 11 00:05:06 2023
IP
Runs
General
run 54 - stopped
run 54 - stopped due to change the distance
in plunger
Run number: 54
Start
223
Fri Mar 10 23:27:51 2023
IP
Problems
Software
run 53 - stopped
the daq crashed at 22:43 -- problem with
Local Filter
the run 53 - stopped
207
Fri Mar 10 16:17:57 2023
IP
Runs
General
run 52 - stopped
run 52 - stopped
Run number: 52
Start
Goto page 1,
2
,
3
...
12
,
13
,
14
Next
All
ELOG V3.1.5-fc6679b