| ID |
Date |
Author |
Type |
test |
Category |
Subject |
|
265
|
Tue Jan 23 16:55:21 2024 |
yes | Other | | | 106Cd certificate |
|
| Attachment 1: Slp823030223120.pdf
|
|
|
22
|
Thu Mar 2 09:20:17 2023 |
ost-mgb | Runs | | General | Rates |
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0043.caendat
RU = 6.25 Mb/s
LF = 4.06 Mb/s
09:15 beam stopped. data saved |
|
23
|
Thu Mar 2 09:24:47 2023 |
ost-mgb | Runs | Run 27 stopped | General | |
Run 27 stopped |
|
25
|
Thu Mar 2 10:18:14 2023 |
ost-mgb | Runs | | General | run 29 started |
Run 29 with single gamma trigger
Plunger feedback system is not connected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0002.caendat
RU = 38.5 Mb/s
LF = 12.0 Mb/s
|
|
26
|
Thu Mar 2 11:14:44 2023 |
ost-mgb | Runs | | General | |
un 29 with single gamma trigger
Plunger feedback system is not connected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0021.caendat
RU = 40.1 Mb/s
LF = 12.5 Mb/s |
|
29
|
Thu Mar 2 12:09:44 2023 |
ost-mgb | Runs | | General | |
beam stop, |
|
19
|
Thu Mar 2 05:33:34 2023 |
ost-dod | Runs | | General | |
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0031.caendat
RU = 4.70 Mb/s
LF = 3.20 Mb/s
Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates. |
|
20
|
Thu Mar 2 07:40:55 2023 |
ost-dod | Runs | | General | |
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0038.caendat
RU = 4.48 Mb/s
LF = 4.07 Mb/s
Nothing really to report. The data rates have been fairly constant since around 4 am. Still observing the frequent sharp minima in the data rates. |
|
31
|
Thu Mar 2 14:59:32 2023 |
mgb | Runs | | General | |
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat
RU = 3.53 Mb/s
LF = 2.40 Mb/s |
|
32
|
Thu Mar 2 15:15:40 2023 |
mgb | Runs | | General | beam stopped. eagle is opened and run 30 continues |
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat
RU = 3.53 Mb/s
LF = 2.40 Mb/s
beam off and on and off. eagle is opened and run 30 continues
new cable is stucked
Cable test is going on |
|
41
|
Fri Mar 3 01:15:27 2023 |
mgb | Runs | | General | |
plunger run # 126
Earlier: CUP#6 100 enA
Now: CUP#6 50eNA
Beam dump 2.3 enA
Collimator 1.0 enA
RU : 5.44 MB/s
LF : 8.40 MB/s
Supposed Distance = 10 um
position of the target = 10.9 um
micrometer = 10.3 um
Voltage = 7.896 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |
|
42
|
Fri Mar 3 02:20:46 2023 |
mgb | Runs | | General | |
plunger run # 137
Beam dump 2.5 enA
Collimator 1.0 enA
02:21 /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0010.caendat
RU : 4.70 MB/s
LF : 7.92 MB/s
Supposed Distance = 10 um
position of the target = 10.7 um
micrometer = 9.8 um
Voltage = 7.89 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |
|
44
|
Fri Mar 3 03:19:34 2023 |
mgb | Runs | | General | |
plunger run # 147
Beam dump 2.5 enA
Collimator 0.9 enA
Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0014.caendat
RU : 4.90 MB/s
LF : 8.07 MB/s
Supposed Distance = 10 um
position of the target = 10.5 um
micrometer = 9.2 um
Voltage = 7.93 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |
|
45
|
Fri Mar 3 04:15:32 2023 |
mgb | Runs | | General | |
plunger run # 157
Beam dump 2.5 enA
Collimator 1.0 enA
Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0018.caendat
RU : 4.79 MB/s
LF : 7.69 MB/s
Supposed Distance = 10 um
position of the target = 10.2 um
micrometer = 8.9 um
Voltage = 7.94 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |
|
70
|
Sat Mar 4 15:02:54 2023 |
mgb | Runs | | General | running stable |
RUN CONTROL = 36
Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0122.caendat
RU = 5.99
LF = 3.35
Plunger ;
Planger run = 504
Supposed Dist=10
Micrometer = 11.1
Position = 10.2
Voltage = 8.964
Beam dumb = 1 nA
Collimeter =0.7 nA |
|
71
|
Sat Mar 4 16:06:19 2023 |
mgb | Runs | | General | |
RUN CONTROL = 36
Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0127.caendat
RU = 6.25
LF = 3.39
Plunger ;
Planger run = 515
Supposed Dist=10 um
Actual Distance = 9.7 um
Position = 10.3 um
Voltage = 7.938 V
Beam dumb = 1 nA
Collimeter =0.7 nA |
|
72
|
Sat Mar 4 17:09:13 2023 |
mgb | Runs | | General | |
RUN CONTROL = 36
Run Data = /onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0133.caendat
RU = 6.45 MB/s
LF = 3.45 MB/s
Plunger ;
Planger run = 525
Supposed Dist=10 um
Actual Distance = 9.8 um
micrometer = 11.2 um
Position = 10.1 um
Voltage = 7.943 V
Beam dumb = 1 nA
Collimeter =0.7 nA |
|
73
|
Sat Mar 4 18:02:48 2023 |
mgb | Runs | | General | |
UN CONTROL = 36
Run Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0138.caendat
RU = 6.39 MB/s
LF = 3.42 MB/s
Plunger ;
Planger run = 534
Supposed Dist=10 um
Actual Distance = 9.9 um
micrometer = 11.4 um
Position = 10.3 um
Voltage = 7.933 V
Beam dumb = 1 nA
Collimeter =0.7 nA |
|
89
|
Sun Mar 5 15:07:24 2023 |
mgb | Runs | | General | Beam dump decreased 1.0 nA to 0.75 |
RUN CONTROL = 37
Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0106.caendat
RU = 8.65 MB/s
LF = 4.11 MB/s
Plunger ;
Planger run = 745
Supposed Dist=240 um
Micrometer = 187.5 um
Position = 241.1 um
Actual distance = 240.6 um
Voltage = 2.715 V
Beam dumb = 0.75 nA
Collimeter =0.65 nA
|
|
174
|
Thu Mar 9 01:07:48 2023 |
WP | Runs | | General | New run started 50 (distance change) |
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0000.caendat
RU = 7.43MB/s
LF = 3.61 MB/s
plunger:
plunger run = 736
actual distance = 533 um
supposed distance = 532.7 um
micrometer = 533.5 um
position = 300 um
voltage = 1.657 V
Beam dump: 1-1.5 enA (oscillating)
Colimator : 0.6 enA
|