EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 10 of 14  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Type test Category Subject Text Attachments
  159   Wed Mar 8 10:27:26 2023 IK, BSOther GeneralGe spectraCount rates are still a bit high (~2.6kHz
for EAGLE det4). Ge spectra looks fine compared
to earlier ones.
 Screenshot_2023-03-08_10-24-20.png 
  166   Wed Mar 8 15:57:53 2023 IK, AMProblems GeneralBeam issueno beam in 15:52 - 16:21 due to power supply
problem
  
  60   Fri Mar 3 16:47:29 2023 IKRuns GeneralRun 36 startedRun 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.
  
  61   Fri Mar 3 17:52:41 2023 IKProblem Fixed HardwareBeamdump readout issue - solvedCurrent readout issues from beamdump. Beam
stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding
  
  62   Fri Mar 3 19:41:27 2023 IKProblems HardwareBeamdump readout issue Vol.2.Issue described in #61 continues to
persist.

Beam stopped from 19:20 to 19:32,
 333626140_152534624340296_7230383118242592907_n.jpg 
  115   Mon Mar 6 19:08:51 2023 IKRuns General RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0045.caendat

RU = 6.95 MB/s
  
  116   Mon Mar 6 20:29:45 2023 IKRuns General RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0053.caendat

RU = 6.75 MB/s
  
  117   Mon Mar 6 22:30:46 2023 IKRuns General RUN CONTROL = 42

Data =/onlineNEDA_00/xData/hil099/run_0042_06-03-2023_09h54m24s/needleRU_i42_0042_0065.caendat

RU = 6.64 MB/s
  
  157   Wed Mar 8 07:57:05 2023 IKProblems Beambeam unstableThe beam was unstable from 7:55. Stabilized
around 8:03.

Counting rates are higher, EAGLE
 Screenshot_2023-03-08_08-17-41.png 
  158   Wed Mar 8 09:31:43 2023 IKRuns GeneralRun 48 stopped, run 49 startedRun 48 stopped at 9:29 to start a new run.

Run 49 is started okay at 9:31.

 
  
  160   Wed Mar 8 10:31:10 2023 IKRuns GeneralRun 49run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0008.caendat

RU =  10.6 MB/s
  
  161   Wed Mar 8 11:42:14 2023 IKProblems GeneralRun 49Counting rates continued to increase (det4
> 3kHz). Beam current looked fine on the
beam dump, but beam is fluctuating, and can
 Screenshot_2023-03-08_11-38-47.pngScreenshot_2023-03-08_11-38-19.pngScreenshot_2023-03-08_11-37-37.png 
  162   Wed Mar 8 12:11:59 2023 IKProblem Fixed Generalbeam tunedBeam tuning was made, focusing significantly
improved.

 
  
  163   Wed Mar 8 13:02:38 2023 IKRuns GeneralRun 49run control = 49

run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0030.caendat

RU =  7.86 MB/s
  
  164   Wed Mar 8 13:04:05 2023 IKRuns GeneralGe spectraGe spectra after #161 - #162 beam tuning.  Screenshot_2023-03-08_13-03-10.png 
  245   Sun Mar 12 03:05:45 2023 GJ, AFProblems Networkno data flux visible in grafena, LF prints "write: Broken pipe"As in the title, see below.
The data are still being constantly written
on the disks with usual rate (also visible
  
  1   Sun Feb 26 16:50:56 2023 GJOther Generalproposal   HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf 
  2   Sun Feb 26 17:26:45 2023 GJOther GeneralList of participantsTo be filled in, with affiliation and email.

Presumably, for later publication
purposes.
  
  3   Mon Feb 27 02:49:10 2023 GJRuns Generalcalibs - 2x 152Eu - run 0Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
  
  39   Thu Mar 2 23:04:01 2023 GJProblem Fixed HardwareConnection of the plunger cables, grounding, beam read-out for the operatorsNotes of the measurements with different conditions
are attached.
 Slp823030222550.pdf 
ELOG V3.1.5-fc6679b