| ID |
Date |
Author |
Type |
test |
Category |
Subject |
|
248
|
Sun Mar 12 07:01:31 2023 |
OST | Runs | | General | |
run control = 58
run data =xdaq 2254808224 Mar 12 06:59 needleRU_i58_0058_0017.caendat
RU = 8.10 MB/s
LF = 3.79 MB/s
plunger:
plunger run = 1520
actual distance = 262.7 um
micrometer = 266.7 um
position = 30 um
voltage = 3.306 V
Beam dump: 1 nA
Colimator : 0.5 nA |
|
249
|
Sun Mar 12 08:03:08 2023 |
OST | Runs | | General | |
run control = 58
run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat
RU = 7.88 MB/s
LF = 3.70 MB/s
plunger:
plunger run = 1530
actual distance = 262.6 um
micrometer = 266.8 um
position = 29.9 um
voltage = 3.308 V
Beam dump: 1 nA
Colimator : 0.5 nA |
|
252
|
Sun Mar 12 17:03:12 2023 |
OST | Runs | | General | |
run control = 58
run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat
RU = 7.14 MB/s
LF = 3.46 MB/s
plunger:
plunger run = 1620
actual distance = 262.5 um
micrometer = 266.7 um
position = 29.8 um
voltage = 3.31 V
Beam dump: 0.7 nA
Colimator : 0.5 nA |
|
253
|
Sun Mar 12 18:50:37 2023 |
OST | Runs | | General | |
run control = 58
run data =xdaq 471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat
RU = 7.35 MB/s
LF = 3.50 MB/s
plunger:
plunger run = 1638
actual distance = 262.6 um
micrometer = 266.9 um
position = 29.8 um
voltage = 3.308 V
Beam dump: 0.7 nA
Colimator : 0.5 nA |
|
254
|
Sun Mar 12 19:00:59 2023 |
OST | Runs | | General | Run 58 stopped and Run 59 started. |
18:54 Run 58 stopped and 18:55 Run 59 started.
BEAM STOPPED.
END of EXPERIMENT.
Run 59 collects radioactivity.
-rw-rw-r-- 1 xdaq xdaq 295178920 Mar 12 18:59 needleLF_i58_0059_0000.adf
-rw-rw-r-- 1 xdaq xdaq 802293316 Mar 12 18:59 needleRU_i59_0059_0000.caendat |
|
255
|
Sun Mar 12 19:20:37 2023 |
MP | Runs | | General | run 60, radioactivity, |
Run 59 collected data using gg trigger radioactivty
Run 60 trigger changed fropm gg to single g.
Just in the beginning a few minutes gg data could have been collected. |
|
256
|
Sun Mar 12 20:31:45 2023 |
GJ | Runs | | General | run_61 - target and stopper and beam dump dismounted. |
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained.
pure background, g trigger only.
Michal says the"bg" spectrum did not change... |
|
258
|
Sun Mar 12 21:33:54 2023 |
GJ | Runs | | General | run 63 - 152 Eu during LN2 filling |
|
|
259
|
Sun Mar 12 22:52:36 2023 |
Bahadir Saygi | Other | | General | Plunger Run Files |
Plunger run files for later to calculate error in the distance |
| Attachment 1: 134Sm_cont.zip
|
| Attachment 2: 134Sm.zip
|
|
63
|
Fri Mar 3 20:50:31 2023 |
IK, MP, GJ | Other | | Data analysis | Ge spectra |
Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.
Attached Ge spectra before decreasing.
Before decreas beam current was 1.75enA, afterwards 1.1enA. |
| Attachment 1: ge_rings101_117_143_Screenshot_2023-03-03_20-44-07.png
|
|
| Attachment 2: Ge_rates_too_high.png
|
|
|
9
|
Wed Mar 1 00:14:28 2023 |
MP | Other | | Beam | beam energy |
Beam energy measured: 148.2 MeV
Mind that this may be an overestimate (by ~1-2 MeV) |
|
11
|
Wed Mar 1 12:51:33 2023 |
MP | Runs | | Beam | beam on the target |
Beam on the target:
target+stopper+beam dump: 25 enA (1.7 pnA) not stable
5 mm collimator: 0.8 enA
data taking continued with run 0023 |
|
100
|
Mon Mar 6 05:15:43 2023 |
JD, DW | Problems | | Beam | No beam 05:10:00 |
No beam 05:10:00 |
|
101
|
Mon Mar 6 05:16:46 2023 |
JD, DW | Problem Fixed | | Beam | |
Beam back on 05:15 |
|
107
|
Mon Mar 6 09:53:06 2023 |
OST | Problems | | Beam | Beam dump decreased 2.5 nA to 1.5 nA- stopped run 41 |
9:20 to 9:50 am beam current stayed 2.5 nA . After 9:50 am decrease 1.5 nA |
|
113
|
Mon Mar 6 17:19:24 2023 |
OST | Problems | | Beam | beam unstable and a little high |
16:30 beam increased 5 mb/s to 9 mb/s and stayed 1 hour 9 mb/s
17:10 beam fixed. stable |
|
127
|
Tue Mar 7 09:18:01 2023 |
OST | Problems | | Beam | run number 44 crashed and local filter turned red-but data saved |
9:08 local filter turned red. Both .caendat and LF .adf files still incrementing. Stopped run 44, started run 45, looks OK.
|
| Attachment 1: run_control_7mar2023_0910.png
|
|
|
128
|
Tue Mar 7 09:20:53 2023 |
OST | Problem Fixed | | Beam | run 45 start-local filter turn green |
I started run 45, and local filter turn green everything is ok. |
|
144
|
Tue Mar 7 20:42:03 2023 |
IP | Problems | | Beam | beam unstable |
There was a problem with the beam from 20:19 to 20:30.
Now it is fine. |
|
153
|
Wed Mar 8 02:45:53 2023 |
KS, KSz | Other | | Beam | increase in Counting Rates |
Since 2:32 increased counting rate observed:
Sinde 3:45 decrease to 1.5 kHz ch4.
run control = 48
/onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0007.caendat
run data =
RU = 8.69 MB/s
LF = 3.79 MB/s
Eagle Rated ch4: around 2.3 kHz
plunger: (2:48)
plunger run = 514
actual distance = 382.7 um
supposed distance = 382.7 um
micrometer = 383.5 um
position = 149.8 um
voltage = 2.144 V
Beam dump = 1.5 nA
Collimater= 0.5 nA |