run control = 52
run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0045.caendat
RU = 6.18 MB/s
LF = 3.24 MB/s
plunger:
plunger run = 1060
actual distance = 434.6 um
supposed distance = 435.0 um
micrometer = 435.1 um
position = 201.3 um
voltage = 1.934 V
Beam dump: 1 nA
Colimator : 0.5 nA
run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0053.caendat
RU = 5.69 MB/s
LF = 3.22 MB/s
plunger run = 1087
actual distance = 434.2 um
micrometer = 437.2 um
position = 203.5 um
Beam dump: 2.5 nA
run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0064.caendat
RU = 7.06 MB/s
LF = 3.35 MB/s
plunger run = 1105
actual distance = 434.5 um
micrometer = 436.4 um
position = 201.8 um
voltage = 1.931 V
run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0074.caendat
RU = 7.17 MB/s
LF = 3.51 MB/s
plunger run = 1120
actual distance = 434.8 um
micrometer = 436.2 um
position = 202.1 um
voltage = 1.93 V
From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.
run 52 - stopped
run control = 53
run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0000.caendat
RU = 7.12 MB/s
LF = 3.50 MB/s
plunger run = 1134
actual distance = 434.3 um
position = 201.6 um
voltage = 1.932 V
run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0007.caendat
RU = 8.24 MB/s
LF = 4.10 MB/s
plunger run = 1146
actual distance = 434.7 um
micrometer = 436.5 um
position = 202.0 um
run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0014.caendat
RU = 7.41 MB/s
LF = 3.34 MB/s
plunger run = 1157
actual distance = 434.4 um
micrometer = 436.8 um
position = 201.7 um
Beam dump: 1 nA (sometimes increase to 1.5 nA)
the beam was stopped at 19:27
the beam start: 19:31
run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0020.caendat
RU = 6.77 MB/s
LF = 3.64 MB/s
plunger run = 1167
supposed distance = 435 um
position = 201.0 um
the beam was lost at 20:46. The operator is working to solve the problem.
the beam comes back at 20:54
run data =/onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0029.caendat
RU = 7.81 MB/s
LF = 3.94 MB/s
plunger run = 1182
position = 201.9 um
the beam is stopped at 21:23.
the beam is not the best focused. The operator works on this problem.
the beam starts at 21:27.
But the operators are still working on focusing the beam.
the beam is now good focused