EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 12 of 14  ELOG logo
Entry  Fri Mar 10 22:36:55 2023, IP, Runs, , General,  

run control = 53

 

run data = /onlineNEDA_00/xData/hil099/run_0053_10-03-2023_16h18m36s/needleRU_i53_0053_0037.caendat

RU = 7.62 MB/s

LF =   3.87 MB/s

 

plunger:

plunger run = 1196

actual distance =  435.7 um

supposed distance = 435 um

micrometer =   437.0 um

position =  203.0 um

voltage =  1.927 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

    Reply  Fri Mar 10 22:40:00 2023, IP, Other, , General, Ge - the rate is higher Screenshot_2023-03-10_22-37-27.png

the rates of detectors are still a bit higher

Quote:

From 13:00 the rate of the Ge [the chanel 4] is a bit higher (~2.15 kHz). And also the rate of other detectors.

 

 

Entry  Fri Mar 10 23:27:51 2023, IP, Problems, , Software, run 53 - stopped 

the daq crashed at 22:43 -- problem with Local Filter

the run 53 - stopped

Entry  Fri Mar 10 23:29:43 2023, IP, Problem Fixed, , Software, new run 54 

the daq resolved at 23:15

start new run: run 54

Entry  Fri Mar 10 23:35:28 2023, IP, Runs, , General,  

run control = 54

 

run data = run_0054_10-03-2023_23h14m24s/needleRU_i54_0054_0001.caendat

RU = 7.59 MB/s

LF =   3.55 MB/s

 

plunger:

plunger run = 1206

actual distance =  436.1 um

supposed distance = 435 um

micrometer =   437.1 um

position =  203.4 um

voltage =  1.925 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

Entry  Sat Mar 11 00:05:06 2023, IP, Runs, , General, run 54 - stopped 

run 54 - stopped due to change the distance in plunger

  • Run number: 54
  • Start time: Fri Mar 10 23:14:54 2023
  • Stop time: Sat Mar 11 00:02:37 2023
Entry  Sat Mar 11 00:34:51 2023, BS, Runs, , General, Run 55 Started New Distance 500 um 

Run 55 Started New Distance 500 um

Entry  Sat Mar 11 09:29:48 2023, EG, Other, , , current exeriment parameters as requested in the manual for shifters 

41_ge_single_theta 101,117,143 looks ok. No peakdeformation of 511, other gammas FWHM around half of that of511 - ok

ch4 in total rate EAGLE_0 arouns 2.1 kHz - ok

planger tollerace limits (green and blue horizontal markers) set far of the current distance, intantionally?

 

Entry  Sat Mar 11 11:39:55 2023, EG, Problems, , , Buffers clearing 

at 11:34:50 sek on 11 march a spike in counting rate of some Ge detectors is observed. Buffers not cleared properly?


 

Entry  Sat Mar 11 12:42:42 2023, EG, Other, , , Beam intensity reduction 

Again beam intensity gradually increased reaching 2.4 kHz ontotal rate EAGLE_0 ch4.  Beam intensity reduction requested. 1.8 kHz on ch4 after reduction.

Entry  Sat Mar 11 14:15:55 2023, EG, Runs, , , Beam intensity rapid increase  

14:12 beam intensity instability. Rapid increase of beam intensity - twice the previous value. Returned to normal after 4 minutes.

Entry  Sat Mar 11 14:42:28 2023, EG, Runs, , , Beam instabilities 

Large beam intensity instabilities from 14:10 till 14:40.  Beam intensity reduction requested. CH4 on Total rate EAGLE_0 returned to 1.9kHz. Intensity became stable.

 

Entry  Sat Mar 11 15:16:31 2023, EG, Other, , , Beam intensity reduced again 

Again beam intensity to high. Reduced to 2 kHz on ch4 GE

Entry  Sat Mar 11 16:22:06 2023, OST, Runs, , General,  

run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0103.caendat

RU = 8.23 MB/s

LF =   4 MB/s

plunger:

plunger run = 1374

actual distance =  520.8 um

supposed distance = 435 um

micrometer =   578.2 um

position = 288.1 um

voltage =  1.377 V

 

Beam dump: 1 nA 

Colimator :  0.6 nA

Entry  Sat Mar 11 17:58:35 2023, OST, Runs, , Beam,  

beam stopped 17:54.

Entry  Sat Mar 11 18:06:36 2023, OST, Runs, , Beam,  

beam started 18:04.

Entry  Sat Mar 11 18:10:06 2023, OST, Runs, , General,  

run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0114.caendat

RU = 5.72 MB/s

LF =   3.27 MB/s

plunger:

plunger run = 1392

actual distance =  512.2 um

supposed distance = 435 um

micrometer =   578.2 um

position = 279.5 um

voltage =  1.37 V

 

Beam dump: 0.9 nA 

Colimator :  0.5 nA

Entry  Sat Mar 11 19:14:35 2023, BS, Runs, , General, Rates Screenshot_2023-03-11_19-11-45.pngScreenshot_2023-03-11_19-11-24.png

Run files /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0114.caendat

Beam Dump = 0.7 nA

Run number 55

Plunger Distance = 500 um + offset

Plunger run 1402

Voltage 1.369 V

Entry  Sat Mar 11 21:24:04 2023, OST, Runs, , General,  

run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0129.caendat

RU = 6.45 MB/s

LF =   3.46 MB/s

plunger:

plunger run = 1424

actual distance =  515 um

supposed distance = 435 um

micrometer =   578.2 um

position = 282.3 um

voltage =  1.372 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

Entry  Sat Mar 11 22:27:08 2023, BS, Runs, , General, Rates Screenshot_2023-03-11_22-26-22.png

Rates 22:18 367Hz

Rates 22:22 4.78 kHz

And Now see the figure

 

ELOG V3.1.5-fc6679b