Fri Mar 3 02:23:45 2023, GJ, Problems, , Software, builder gate, TS offsets
|
Data from current run - 35, with limited beam current and rates - see a recent post by Güray.
BU level, so what we see in Greware (both online & nearline).
Attached is the fold of Germaniums.
|
Fri Mar 3 02:20:46 2023, mgb, Runs, , General,
|
plunger run # 137
Beam dump 2.5 enA |
Fri Mar 3 01:15:27 2023, mgb, Runs, , General,
|
plunger run # 126
Earlier: CUP#6 100 enA |
Fri Mar 3 00:09:19 2023, MP, AT, Runs, , , run 35
|
Started after beam current was reduced by a factor of 2
plunger run # 116
Earlier: CUP#6 100 enA |
Thu Mar 2 23:04:01 2023, GJ, Problem Fixed, , Hardware, Connection of the plunger cables, grounding, beam read-out for the operators
|
Notes of the measurements with different conditions are attached.
Conclusion:
|
Thu Mar 2 23:01:21 2023, A.T., Runs, , General, Run 34 started
|
Run 34 Started (33 was stopped due to acquisition problems)
Plunger Run : 105
Supposed Distance = 10 um |
Thu Mar 2 17:28:21 2023, BS, Runs, , , Run 33 Started
|
Run 33 Started
Plunger Run : 48
Supposed Distance = 10 um |
Thu Mar 2 17:25:36 2023, BS, Runs, , General, Run 32 Stopped
|
| Run 32 Stopped |
Thu Mar 2 17:23:53 2023, BS, Runs, , General, Plunger Informations
|
Plunger Run : 48
Supposed Distance = 10 um
position of the target = 10 um |
Thu Mar 2 16:40:45 2023, MP, Runs, , General, changing the plunger distance to minimum.
|
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32 was started, with no beam. |
Thu Mar 2 16:06:17 2023, A.T., Runs, , General,
|
Data
Position = 522.6
Supposed = 520 |
Thu Mar 2 15:15:40 2023, mgb, Runs, , General, beam stopped. eagle is opened and run 30 continues
|
Data
Position = 522.6
Supposed = 520 |
Thu Mar 2 14:59:32 2023, mgb, Runs, , General,
|
Data |
Thu Mar 2 13:50:50 2023, BS, Runs, , General, Run 30 Continueed
|
EAGLE is closed now
We gave a break to test the cable connection of target, degrader, beam dump and collimator.
Run 30 continues to collect data, we did not stop it. |
Thu Mar 2 12:09:44 2023, ost-mgb, Runs, , General,
|
| beam stop, |
Thu Mar 2 11:19:06 2023, BS, Runs, , General, Run 30 Starts
|
We hane now g-g trigger started.
Run 30 started |
Thu Mar 2 11:17:54 2023, BS, Runs, , , Run 29 stopped
|
| We will change the trigger and we stopped the run number 29 |
Thu Mar 2 11:14:44 2023, ost-mgb, Runs, , General,
|
un 29 with single gamma trigger
Plunger feedback system is not connected.
Data |
Thu Mar 2 10:18:14 2023, ost-mgb, Runs, , General, run 29 started
|
Run 29 with single gamma trigger
Plunger feedback system is not connected.
Data |
Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started
|
| run 28 started |
|