| ID |
Date |
Author |
Type |
test |
Category |
Subject |
Text |
 |
|
242
|
Sat Mar 11 22:52:48 2023 |
BS | Runs | | General | run_0055 | run control = 55
run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0137.caendat
RU = 4.17 MB/s |
|
|
243
|
Sat Mar 11 23:30:47 2023 |
AF | Runs | | General | run_0056 | run control = 56
run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s
RU = 7.3 MB/s |
|
|
244
|
Sun Mar 12 00:09:35 2023 |
AF | Problem Fixed | | Software | caen_shifted correction in spy & greware | neda_psdcaen_positions.txt had weird values
for three first detectors, especially neda_02.
|
|
|
245
|
Sun Mar 12 03:05:45 2023 |
GJ, AF | Problems | | Network | no data flux visible in grafena, LF prints "write: Broken pipe" | As in the title, see below.
The data are still being constantly written
on the disks with usual rate (also visible |
|
|
246
|
Sun Mar 12 03:23:05 2023 |
AF | Runs | | General | run_0057 | run control = 57
run data =/onlineNEDA_00/xData/hil099/run_0057_12-03-2023_03h10m10s/
RU = 8.1 MB/s |
|
|
247
|
Sun Mar 12 04:20:19 2023 |
OST | Runs | | General | Run 57 stopped, Run 58 started | |
|
|
248
|
Sun Mar 12 07:01:31 2023 |
OST | Runs | | General | | run control = 58
run data =xdaq 2254808224 Mar 12
06:59 needleRU_i58_0058_0017.caendat |
|
|
249
|
Sun Mar 12 08:03:08 2023 |
OST | Runs | | General | | run control = 58
run data = xdaq 3303602776 Mar
12 08:01 needleRU_i58_0058_0024.caendat |
|
|
250
|
Sun Mar 12 09:15:00 2023 |
EG | Other | | | Array_monitors mat refresh synchronization | Beam stable, counting rate within limits,
plunger distance within the given tollerance,
gamma spectra ok, everything looks good but.... |
|
|
251
|
Sun Mar 12 13:20:00 2023 |
EG | Problems | | | No Data | For a split second a red "NO DATA"
notification appeared in the top right corner
of Counting rates dashboard. |
|
|
252
|
Sun Mar 12 17:03:12 2023 |
OST | Runs | | General | | run control = 58
run data =xdaq 1111949504 Mar 12
17:01 needleRU_i58_0058_0083.caendat |
|
|
253
|
Sun Mar 12 18:50:37 2023 |
OST | Runs | | General | | run control = 58
run data =xdaq 471656980
Mar 12 18:47 needleRU_i58_0058_0095.caendat |
|
|
254
|
Sun Mar 12 19:00:59 2023 |
OST | Runs | | General | Run 58 stopped and Run 59 started. | 18:54 Run 58 stopped and 18:55 Run 59 started.
BEAM STOPPED.
END of EXPERIMENT. |
|
|
255
|
Sun Mar 12 19:20:37 2023 |
MP | Runs | | General | run 60, radioactivity, | Run 59 collected data using gg trigger
radioactivty
Run 60 trigger changed fropm gg |
|
|
256
|
Sun Mar 12 20:31:45 2023 |
GJ | Runs | | General | run_61 - target and stopper and beam dump dismounted. | target and stopper and beam dump dismounted.
only the constructional elements of the plunger
remained.
|
|
|
257
|
Sun Mar 12 20:55:08 2023 |
MP | Runs | | | runc62 152 for efficiency calibration | started
source in the target position,
as precisely as possible |
|
|
258
|
Sun Mar 12 21:33:54 2023 |
GJ | Runs | | General | run 63 - 152 Eu during LN2 filling | |
|
|
259
|
Sun Mar 12 22:52:36 2023 |
Bahadir Saygi | Other | | General | Plunger Run Files | Plunger run files for later to calculate
error in the distance |
 |
|
260
|
Mon Mar 13 12:15:35 2023 |
MP | Other | | | measurement of radioactivity along the beam line | At about 12:00, 13/03/2023 (about
17 hours after the beam was stopped), a measurement
of activity of the beam line was performed |
|
|
261
|
Mon Mar 13 12:16:31 2023 |
MP | Other | | | run 66 | run 66 started, radiocativity (background)
|
|