EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 13 of 14  ELOG logo
ID Date Author Type testdown Category Subject Text Attachments
  242   Sat Mar 11 22:52:48 2023 BSRuns Generalrun_0055run control = 55

run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0137.caendat

RU = 4.17 MB/s
  
  243   Sat Mar 11 23:30:47 2023 AFRuns Generalrun_0056run control = 56

run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s

RU = 7.3 MB/s
  
  244   Sun Mar 12 00:09:35 2023 AFProblem Fixed Softwarecaen_shifted correction in spy & grewareneda_psdcaen_positions.txt had weird values
for three first detectors, especially neda_02.
  
  245   Sun Mar 12 03:05:45 2023 GJ, AFProblems Networkno data flux visible in grafena, LF prints "write: Broken pipe"As in the title, see below.
The data are still being constantly written
on the disks with usual rate (also visible
  
  246   Sun Mar 12 03:23:05 2023 AFRuns Generalrun_0057run control = 57

run data =/onlineNEDA_00/xData/hil099/run_0057_12-03-2023_03h10m10s/

RU = 8.1 MB/s
  
  247   Sun Mar 12 04:20:19 2023 OSTRuns GeneralRun 57 stopped, Run 58 started     
  248   Sun Mar 12 07:01:31 2023 OSTRuns General run control = 58

run data =xdaq 2254808224 Mar 12
06:59 needleRU_i58_0058_0017.caendat
  
  249   Sun Mar 12 08:03:08 2023 OSTRuns General run control = 58

run data = xdaq 3303602776 Mar
12 08:01 needleRU_i58_0058_0024.caendat
  
  250   Sun Mar 12 09:15:00 2023 EGOther  Array_monitors mat refresh synchronizationBeam stable, counting rate within limits,
plunger distance within the given tollerance,
gamma spectra ok, everything looks good but....
  
  251   Sun Mar 12 13:20:00 2023 EGProblems  No DataFor a split second a red "NO DATA"
notification appeared in the top right corner
of Counting rates dashboard.
  
  252   Sun Mar 12 17:03:12 2023 OSTRuns General run control = 58

run data =xdaq 1111949504 Mar 12
17:01 needleRU_i58_0058_0083.caendat
  
  253   Sun Mar 12 18:50:37 2023 OSTRuns General run control = 58

run data =xdaq  471656980
Mar 12 18:47 needleRU_i58_0058_0095.caendat
  
  254   Sun Mar 12 19:00:59 2023 OSTRuns GeneralRun 58 stopped and Run 59 started.18:54 Run 58 stopped and 18:55 Run 59 started.

BEAM STOPPED.

END of EXPERIMENT.
  
  255   Sun Mar 12 19:20:37 2023 MPRuns Generalrun 60, radioactivity, Run 59 collected data using gg trigger
radioactivty

Run 60 trigger changed fropm gg
  
  256   Sun Mar 12 20:31:45 2023 GJRuns Generalrun_61 - target and stopper and beam dump dismounted.target and stopper and beam dump dismounted.
only the constructional elements of the plunger
remained. 
  
  257   Sun Mar 12 20:55:08 2023 MPRuns  runc62 152 for efficiency calibrationstarted

source in the target position,
as precisely as possible
  
  258   Sun Mar 12 21:33:54 2023 GJRuns Generalrun 63 - 152 Eu during LN2 filling    
  259   Sun Mar 12 22:52:36 2023 Bahadir SaygiOther GeneralPlunger Run Files Plunger run files for later to calculate
error in the distance
 134Sm_cont.zip134Sm.zip 
  260   Mon Mar 13 12:15:35 2023 MPOther  measurement of radioactivity along the beam lineAt about 12:00, 13/03/2023 (about 
17 hours after the beam was stopped), a measurement
of activity of the beam line was performed
  
  261   Mon Mar 13 12:16:31 2023 MPOther  run 66run 66 started, radiocativity (background)

 
  
ELOG V3.1.5-fc6679b