EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 14 of 15  ELOG logo
Entry  Mon Mar 13 15:16:21 2023, MP, Other, , , list of files copied to Bahadir's disks disk1.list_of_filesdisk2.list_of_files
Attached are the lists of files copied to the two 4 TB Bahadir's disks.

 

 
Entry  Thu Mar 16 12:13:11 2023, MP, Other, , , test of radioactivity rings_16mar2023_0905.pngrings143_16mar2023_0908.pngrings143_16mar2023_0920.png
16/03/2023

Plunger chamber closed, some dummy target and stopper probably inside

run 72    eagle closed
Entry  Mon Mar 20 04:55:24 2023, MP, Other, , , missing caendat.bz2 on Bahadir's disk 
The following  caendat.bz2 files were not copied to Bahadir's disks 
(because they were not bzipped at the time of the copying):
Entry  Tue Jan 23 16:55:21 2024, yes, Other, , , 106Cd certificate Slp823030223120.pdf
 
    Reply  Mon Mar 23 03:03:54 2026, IP, Runs, , General, run 54 - stopped 
 




Quote:



run 54 - stopped due to change the distance in plunger
    Reply  Tue Mar 24 09:36:29 2026, mgb, Runs, , General,  
 




Quote:



plunger run # 137
    Reply  Fri Apr 3 20:04:30 2026, IK, Runs, , General, Run 48 stopped, run 49 started 
 




Quote:



Run 48 stopped at 9:29 to start a new run.
Entry  Sat Apr 4 00:16:43 2026, OST, Runs, , General,  
run control = 52

run data = /onlineNEDA_00/xData/hil099/run_0052_10-03-2023_01h19m26s/needleRU_i52_0052_0045.caendat

RU = 6.18 MB/s
Entry  Sat Apr 4 02:37:43 2026, JD, DW, Runs, , General,  
run control = 44

run data =/onlineNEDA_00/xData/hil099/run_0044_07-03-2023_03h15m45s/needleRU_i44_0044_0005.caendat

RU =  6.49 MB/s
    Reply  Tue Apr 7 05:58:24 2026, mgb, Runs, , General,  
 




Quote:



 
    Reply  Tue Apr 7 15:17:01 2026, AM, Runs, , General,  
 




Quote:



run control = 52
Entry  Wed Apr 8 01:31:25 2026, AF, Runs, , General, run_0056 
run control = 56

run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s

RU = 7.3 MB/s
Entry  Wed Apr 8 10:50:22 2026, mgb, Runs, , General, Beam dump decreased 1.0 nA to 0.75 
RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0106.caendat

RU = 8.65 MB/s
Entry  Thu Apr 9 15:07:01 2026, OST, Runs, , Beam,  
beam started 18:04.
Entry  Sat Apr 11 12:37:21 2026, MK, Runs, , General,  
run control = 51

run data =  /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0002.caendat

RU =  6.43MB/s
    Reply  Sun Apr 12 03:42:35 2026, JD, DW, Runs, , General, New run started 43 
 




Quote:



run control = 43
    Reply  Sun Apr 12 15:20:15 2026, OST, Runs, , General,  
 




Quote:



RUN CONTROL = 41
    Reply  Mon Apr 13 10:08:23 2026, OST, Runs, , General,  
 




Quote:



run control = 50
    Reply  Wed Apr 15 13:32:24 2026, JD, DW, Problem Fixed, , Beam,  
 




Quote:



Beam back on 05:15
    Reply  Thu Apr 16 05:09:13 2026, EG, Runs, , , Beam intensity rapid increase  
 




Quote:



14:12 beam intensity instability. Rapid increase of beam intensity - twice the previous value. Returned to normal
ELOG V3.1.5-fc6679b