EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 1 of 14  ELOG logo
ID Date Author Type testdown Category Subject Text Attachments
  23   Thu Mar 2 09:24:47 2023 ost-mgbRunsRun 27 stoppedGeneral Run 27 stopped   
  14   Wed Mar 1 19:04:37 2023 BSRunsRunGeneralRun 26 StartedRun 26 Started

 

Beam 9 enA on the collimator
  
  229   Sat Mar 11 10:46:37 2023 EGOtherBeam intensity  ch4 in total rate EGALE_) reached 2.4 kHz,
beam intensity has been reduced to fit the
required 2kHz.
  
  1   Sun Feb 26 16:50:56 2023 GJOther Generalproposal   HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf 
  2   Sun Feb 26 17:26:45 2023 GJOther GeneralList of participantsTo be filled in, with affiliation and email.

Presumably, for later publication
purposes.
  
  3   Mon Feb 27 02:49:10 2023 GJRuns Generalcalibs - 2x 152Eu - run 0Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
  
  4   Mon Feb 27 12:10:24 2023 BSOther TargettargetSupport of Target = 1.5 mg/cm2 Ta
Target            = 1.0 mg/cm2 Cd-106
Stopper           = 10 mg/cm2 Au
  
  5   Mon Feb 27 12:13:03 2023 MBOther  Plunger InformationsOff set of the plunger ~60 um

Distcal file   distcal01_vac

 
  
  6   Mon Feb 27 12:21:29 2023 MP, BSRuns GeneralList of runsA list of runs, to be filled during the experiment
is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
  
  7   Tue Feb 28 23:08:35 2023 BSOther  SHIFT LISThttps://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing

  
  8   Tue Feb 28 23:10:36 2023 BSOther  What we need to include for PlungerPlunger Run :

Micrometer :

Supposed Distance:
  
  9   Wed Mar 1 00:14:28 2023 MPOther Beambeam energyBeam energy measured:  148.2 MeV
Mind that this may be an overestimate (by
~1-2 MeV)
  
  10   Wed Mar 1 11:52:48 2023 MPRuns  first beamOperators tune beam on the target, collecting
run 0023, trigger gg.
  
  11   Wed Mar 1 12:51:33 2023 MPRuns Beambeam on the targetBeam on the target:

target+stopper+beam dump: 25 enA   (1.7 pnA)
  
  12   Wed Mar 1 16:06:50 2023 BSRuns  Run 23 StoppedRun 23 Stopped due to some unexpected spikes
in the

voltage of collimator.
  
  13   Wed Mar 1 16:07:49 2023 BSRuns  Run 24 StartedRun 24 has been started but no beams at
the moment.

EAGLE is opened.
  
  15   Wed Mar 1 20:10:38 2023 BS, DODOther General Run 26 is going on but not much for the
moment in terms of any useful data.

And half of the EAGLE is opened.
  
  16   Wed Mar 1 21:59:45 2023 MB BSOther General Offset of the plunger is 60 um.

new distcal01_vac_after_opening
  
  17   Thu Mar 2 00:30:29 2023 BS, DODRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  18   Thu Mar 2 04:17:40 2023 DODRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
ELOG V3.1.5-fc6679b