EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 2 of 14  ELOG logo
ID Date Author Type test Category Subjectdown Text Attachments
  196   Fri Mar 10 01:32:20 2023 AMRuns Generalrun 51 stoppedrun 51 stopped


Run number: 51
Start
time: Thu Mar 9 16:25:00 2023
Stop
  
  188   Thu Mar 9 16:25:57 2023 IPRuns Generalrun 50 stoppedrun 50 - stopped


 
Run number:
50
Start time: Thu Mar 9 00:50:57
  
  147   Tue Mar 7 23:39:52 2023 IP, KSRuns Generalrun 46 stoppedRun 46 - stopped


Run number: 46
Start
time: Tue Mar 7 15:09:06 2023
Stop
  
  139   Tue Mar 7 15:12:06 2023 OSTProblems Softwarerun 45 stopped14:30 pm to 15:00 run 45 crashed and stopped   
  128   Tue Mar 7 09:20:53 2023 OSTProblem Fixed Beamrun 45 start-local filter turn greenI started run 45, and local filter turn
green everything is ok.
  
  90   Sun Mar 5 16:58:45 2023 MPProblems Otherrun 37 crashed, run 38 junkRun 37 stopped by itslelf at 15:43. This
was noticed at about 16:10 by observing that
grafana data rates do not change.
  
  59   Fri Mar 3 15:04:33 2023 KWLOther Generalrun 35 stopped Run 35 stopped. An attempt to check if
we can get 5 MeV  higher beam energy.
  
  40   Fri Mar 3 00:09:19 2023 MP, ATRuns  run 35Started after beam current was reduced
by a factor of 2

plunger run # 116
  
  25   Thu Mar 2 10:18:14 2023 ost-mgbRuns Generalrun 29 startedRun 29 with single gamma trigger

Plunger feedback system is not
connected.
  
  24   Thu Mar 2 09:49:13 2023 BSRuns Generalrun 28 startedrun 28 started   
  1   Sun Feb 26 16:50:56 2023 GJOther Generalproposal   HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf 
  218   Fri Mar 10 21:26:55 2023 IPProblems Beamproblem with focus the beamthe beam is not the best focused. The operator
works on this problem.
  
  130   Tue Mar 7 09:41:44 2023 OSTProblems Softwarenumber_Ge_15 dedector not taking dataafter run 45 I reset all spectrums and
number_Ge_15 dedector not
taking data.
  
  245   Sun Mar 12 03:05:45 2023 GJ, AFProblems Networkno data flux visible in grafena, LF prints "write: Broken pipe"As in the title, see below.
The data are still being constantly written
on the disks with usual rate (also visible
  
  92   Mon Mar 6 00:30:32 2023 MP, ANJOther Targetnew target mountedNew target mounted.

106Cd 1 mg/cm2

181Ta  1.2 mg/cm2
  
  224   Fri Mar 10 23:29:43 2023 IPProblem Fixed Softwarenew run 54the daq resolved at 23:15

start new run: run 54
  
  264   Mon Mar 20 04:55:24 2023 MPOther  missing caendat.bz2 on Bahadir's diskThe following  caendat.bz2 files were not
copied to Bahadir's disks 
(because they were not bzipped at the time
  
  260   Mon Mar 13 12:15:35 2023 MPOther  measurement of radioactivity along the beam lineAt about 12:00, 13/03/2023 (about 
17 hours after the beam was stopped), a measurement
of activity of the beam line was performed
  
  214   Fri Mar 10 20:54:20 2023 IPProblems Beamlost the beamthe beam was lost at 20:46. The operator
is working to solve the problem.
  
  262   Mon Mar 13 15:16:21 2023 MPOther  list of files copied to Bahadir's disksAttached are the lists of files copied
to the two 4 TB Bahadir's disks.

 
 disk1.list_of_filesdisk2.list_of_files 
ELOG V3.1.5-fc6679b