EAGLE
IRRADIATIONS
EXTERNAL
Analysis
Students Workshop
Shift Plans
GAMMA-ONLY
NEEDLE NEEDI
COULEX
PLUNGER
GENERAL
HIL102-128Cs
HIL087-176Pt
Nd148_2
176Pt
HIL109-172Os
HIL124-128Cs
HIL061
Nd148
HIL106-119Cs
HIL097-118Xe
HIL099-134Sm
April16
xdaq
HIL099-134Sm, Page 2 of 14
New
|
Find
|
Config
|
Logout
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Runs
Problems
Problem Fixed
Other
264 Entries
Goto page
Previous
1
, 2,
3
...
12
,
13
,
14
Next
All
ID
Date
Author
Type
test
Category
Subject
Text
245
Sun Mar 12 03:05:45 2023
GJ, AF
Problems
Network
no data flux visible in grafena, LF prints "write: Broken pipe"
As in the title, see below.
The data are still being constantly written
on the disks with usual rate (also visible
244
Sun Mar 12 00:09:35 2023
AF
Problem Fixed
Software
caen_shifted correction in spy & greware
neda_psdcaen_positions.txt had weird values
for three first detectors, especially neda_02.
243
Sat Mar 11 23:30:47 2023
AF
Runs
General
run_0056
run control = 56
run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s
RU = 7.3 MB/s
242
Sat Mar 11 22:52:48 2023
BS
Runs
General
run_0055
run control = 55
run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0137.caendat
RU = 4.17 MB/s
241
Sat Mar 11 22:27:08 2023
BS
Runs
General
Rates
Rates 22:18
367Hz
Rates
22:22 4.78 kHz
And
240
Sat Mar 11 21:24:04 2023
OST
Runs
General
run control = 55
run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0129.caendat
RU = 6.45 MB/s
239
Sat Mar 11 19:14:35 2023
BS
Runs
General
Rates
Run files /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0114.caendat
Beam Dump = 0.7 nA
Run number 55
238
Sat Mar 11 18:10:06 2023
OST
Runs
General
run control = 55
run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0114.caendat
RU = 5.72 MB/s
237
Sat Mar 11 18:06:36 2023
OST
Runs
Beam
beam started 18:04.
236
Sat Mar 11 17:58:35 2023
OST
Runs
Beam
beam stopped 17:54.
235
Sat Mar 11 16:22:06 2023
OST
Runs
General
run control = 55
run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0103.caendat
RU = 8.23 MB/s
234
Sat Mar 11 15:16:31 2023
EG
Other
Beam intensity reduced again
Again beam intensity to high. Reduced to
2 kHz on ch4 GE
233
Sat Mar 11 14:42:28 2023
EG
Runs
Beam instabilities
Large beam intensity instabilities from
14:10 till 14:40. Beam intensity reduction
requested. CH4 on Total rate EAGLE_0 returned
232
Sat Mar 11 14:15:55 2023
EG
Runs
Beam intensity rapid increase
14:12 beam intensity instability. Rapid
increase of beam intensity - twice the previous
value. Returned to normal after 4 minutes.
231
Sat Mar 11 12:42:42 2023
EG
Other
Beam intensity reduction
Again beam intensity gradually increased
reaching 2.4 kHz ontotal rate EAGLE_0 ch4.
Beam intensity reduction requested. 1.8 kHz
230
Sat Mar 11 11:39:55 2023
EG
Problems
Buffers clearing
at 11:34:50 sek on 11 march a spike in
counting rate of some Ge detectors is observed.
Buffers not cleared properly?
229
Sat Mar 11 10:46:37 2023
EG
Other
Beam intensity
ch4 in total rate EGALE_) reached 2.4 kHz,
beam intensity has been reduced to fit the
required 2kHz.
228
Sat Mar 11 09:29:48 2023
EG
Other
current exeriment parameters as requested in the manual for shifters
41_ge_single_theta 101,117,143 looks ok.
No peakdeformation of 511, other gammas FWHM
around half of that of511 - ok
227
Sat Mar 11 00:34:51 2023
BS
Runs
General
Run 55 Started New Distance 500 um
Run 55 Started New Distance 500 um
226
Sat Mar 11 00:05:06 2023
IP
Runs
General
run 54 - stopped
run 54 - stopped due to change the distance
in plunger
Run number: 54
Start
Goto page
Previous
1
, 2,
3
...
12
,
13
,
14
Next
All
ELOG V3.1.5-fc6679b