Sun Mar 12 03:05:45 2023, GJ, AF, Problems, , Network, no data flux visible in grafena, LF prints "write: Broken pipe"
|
As in the title, see below.
The data are still being constantly written on the disks with usual rate (also visible on grafena).
Greware is also seeing data.
|
Sun Mar 12 00:09:35 2023, AF, Problem Fixed, , Software, caen_shifted correction in spy & greware
|
neda_psdcaen_positions.txt had weird values for three first detectors, especially neda_02.
It was:
|
Sat Mar 11 23:30:47 2023, AF, Runs, , General, run_0056
|
run control = 56
run data =/onlineNEDA_00/xData/hil099/run_0056_11-03-2023_23h26m10s
RU = 7.3 MB/s |
Sat Mar 11 22:52:48 2023, BS, Runs, , General, run_0055
|
run control = 55
run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0137.caendat
RU = 4.17 MB/s |
Sat Mar 11 22:27:08 2023, BS, Runs, , General, Rates
|
Rates 22:18 367Hz
Rates 22:22 4.78 kHz
And Now
see the figure
|
Sat Mar 11 21:24:04 2023, OST, Runs, , General,
|
run control = 55
run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0129.caendat
RU = 6.45 MB/s |
Sat Mar 11 19:14:35 2023, BS, Runs, , General, Rates 
|
Run files /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0114.caendat
Beam Dump = 0.7 nA
Run number 55 |
Sat Mar 11 18:10:06 2023, OST, Runs, , General,
|
run control = 55
run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0114.caendat
RU = 5.72 MB/s |
Sat Mar 11 18:06:36 2023, OST, Runs, , Beam,
|
| beam started 18:04. |
Sat Mar 11 17:58:35 2023, OST, Runs, , Beam,
|
| beam stopped 17:54. |
Sat Mar 11 16:22:06 2023, OST, Runs, , General,
|
run control = 55
run data = /onlineNEDA_00/xData/hil099/run_0055_11-03-2023_00h33m38s/needleRU_i55_0055_0103.caendat
RU = 8.23 MB/s |
Sat Mar 11 15:16:31 2023, EG, Other, , , Beam intensity reduced again
|
| Again beam intensity to high. Reduced to 2 kHz on ch4 GE |
Sat Mar 11 14:42:28 2023, EG, Runs, , , Beam instabilities
|
Large beam intensity instabilities from 14:10 till 14:40. Beam intensity reduction requested. CH4 on Total rate EAGLE_0 returned to 1.9kHz. Intensity
became stable.
|
Sat Mar 11 14:15:55 2023, EG, Runs, , , Beam intensity rapid increase
|
| 14:12 beam intensity instability. Rapid increase of beam intensity - twice the previous value. Returned to normal after 4 minutes. |
Sat Mar 11 12:42:42 2023, EG, Other, , , Beam intensity reduction
|
| Again beam intensity gradually increased reaching 2.4 kHz ontotal rate EAGLE_0 ch4. Beam intensity reduction requested. 1.8 kHz on ch4 after reduction. |
Sat Mar 11 11:39:55 2023, EG, Problems, , , Buffers clearing
|
at 11:34:50 sek on 11 march a spike in counting rate of some Ge detectors is observed. Buffers not cleared properly?
|
Sat Mar 11 10:46:37 2023, EG, Other, Beam intensity, ,
|
ch4 in total rate EGALE_) reached 2.4 kHz, beam intensity has been reduced to fit the required 2kHz.
|
Sat Mar 11 09:29:48 2023, EG, Other, , , current exeriment parameters as requested in the manual for shifters
|
41_ge_single_theta 101,117,143 looks ok. No peakdeformation of 511, other gammas FWHM around half of that of511 - ok
ch4 in total rate EAGLE_0 arouns 2.1 kHz - ok
planger tollerace limits (green and blue horizontal markers) set far of the current distance, intantionally? |
Sat Mar 11 00:34:51 2023, BS, Runs, , General, Run 55 Started New Distance 500 um
|
| Run 55 Started New Distance 500 um |
Sat Mar 11 00:05:06 2023, IP, Runs, , General, run 54 - stopped
|
run 54 - stopped due to change the distance in plunger
Run number: 54
Start time: Fri Mar 10 23:14:54 2023
Stop time: Sat Mar 11 00:02:37 2023
|
|