  6   Mon Feb 27 12:21:29 2023 MP, BSRuns GeneralList of runsA list of runs, to be filled during the experiment
is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
  
  14   Wed Mar 1 19:04:37 2023 BSRunsRunGeneralRun 26 StartedRun 26 Started

 

Beam 9 enA on the collimator
  
  15   Wed Mar 1 20:10:38 2023 BS, DODOther General Run 26 is going on but not much for the
moment in terms of any useful data.

And half of the EAGLE is opened.
  
  16   Wed Mar 1 21:59:45 2023 MB BSOther General Offset of the plunger is 60 um.

new distcal01_vac_after_opening
  
  17   Thu Mar 2 00:30:29 2023 BS, DODRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  18   Thu Mar 2 04:17:40 2023 DODRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  19   Thu Mar 2 05:33:34 2023 ost-dodRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  20   Thu Mar 2 07:40:55 2023 ost-dodRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  22   Thu Mar 2 09:20:17 2023 ost-mgbRuns GeneralRatesRun 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  23   Thu Mar 2 09:24:47 2023 ost-mgbRunsRun 27 stoppedGeneral Run 27 stopped   
  24   Thu Mar 2 09:49:13 2023 BSRuns Generalrun 28 startedrun 28 started   
  25   Thu Mar 2 10:18:14 2023 ost-mgbRuns Generalrun 29 startedRun 29 with single gamma trigger

Plunger feedback system is not
connected.
  
  26   Thu Mar 2 11:14:44 2023 ost-mgbRuns General un 29 with single gamma trigger

Plunger feedback system is not
connected.
  
  28   Thu Mar 2 11:19:06 2023 BSRuns GeneralRun 30 StartsWe hane now g-g trigger started.

Run 30 started
  
  29   Thu Mar 2 12:09:44 2023 ost-mgbRuns General beam stop,   
  30   Thu Mar 2 13:50:50 2023 BSRuns GeneralRun 30 ContinueedEAGLE is closed now

We gave a break to test the cable
connection of target, degrader, beam dump
  
  31   Thu Mar 2 14:59:32 2023 mgbRuns General  

 

Data
  
  32   Thu Mar 2 15:15:40 2023 mgbRuns Generalbeam stopped. eagle is opened and run 30 continuesData

Position = 522.6

Supposed = 520
  
  33   Thu Mar 2 16:06:17 2023 A.T.Runs General Data

Position = 522.6

Supposed = 520
  
  34   Thu Mar 2 16:40:45 2023 MPRuns Generalchanging the plunger distance to minimum.Run 31 was stopped, because plunger distance
is reduced to the mininimal one.
It takes time, in the meantime, after some
  