EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 3 of 14  ELOG logo
ID Date Author Type test Categorydown Subject
  35   Thu Mar 2 17:23:53 2023 BSRuns GeneralPlunger Informations

Plunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 6.5 um

Voltage = 7.957 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
 

  36   Thu Mar 2 17:25:36 2023 BSRuns GeneralRun 32 Stopped

Run 32 Stopped

  38   Thu Mar 2 23:01:21 2023 A.T.Runs GeneralRun 34 started

Run 34 Started (33 was stopped due to acquisition problems)

Plunger Run : 105

Supposed Distance = 10 um

position of the target = 10 um

micrometer = 12.7 um

Voltage = 7.9 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

at the first 10 min det # 5 was switched off

Ge det #            1         2        3          4         5        6          7          8          9           10           11          12           13         14         15

old scalers:         5        2.5      8          5         8.5     3          5         1.5        5           8.5          8.5          7.5         2.7        2.7         5      kHz

new (Grzes)        1.7     1         3.2       1.8      3.6     0.9       1.7       0.45    1.7          3.5         3.2          3.1         1.           1.          1.7    kHz

 

beam dump current 3nA

det # 5 scaler  7.7   kHz

stoppped 00:02 because beam current was reduced byu a factor of 2 (see note on the next run)

  41   Fri Mar 3 01:15:27 2023 mgbRuns General 

 

plunger run # 126

Earlier:   CUP#6  100 enA

Now: CUP#6   50eNA

Beam dump 2.3 enA

Collimator  1.0 enA

 

RU : 5.44 MB/s

LF : 8.40 MB/s

Supposed Distance = 10 um

position of the target = 10.9 um

micrometer = 10.3 um

Voltage = 7.896 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  42   Fri Mar 3 02:20:46 2023 mgbRuns General 

plunger run # 137

 

Beam dump 2.5 enA

Collimator  1.0 enA

02:21 /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0010.caendat

RU : 4.70 MB/s

LF : 7.92 MB/s

Supposed Distance = 10 um

position of the target = 10.7 um

micrometer = 9.8 um

Voltage = 7.89 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  44   Fri Mar 3 03:19:34 2023 mgbRuns General 

plunger run # 147

 

Beam dump 2.5 enA

Collimator  0.9 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0014.caendat

RU : 4.90 MB/s

LF : 8.07 MB/s

Supposed Distance = 10 um

position of the target = 10.5 um

micrometer = 9.2 um

Voltage = 7.93 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  45   Fri Mar 3 04:15:32 2023 mgbRuns General 

plunger run # 157

 

Beam dump 2.5 enA

Collimator  1.0 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0018.caendat

RU : 4.79 MB/s

LF : 7.69 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.9 um

Voltage = 7.94 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  46   Fri Mar 3 05:18:35 2023 OSTRuns General 

plunger run # 167

 

Beam dump 2.5 enA

Collimator  1.0 enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0022.caendat

RU : 4.90 MB/s

LF : 8.01 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.941 V

nothing has changed. the situation is stable.

  47   Fri Mar 3 06:24:03 2023 OSTRuns General 

plunger run # 178

Beam dump 2.5 enA

Collimator  0.9 enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0027.caendat

RU : 4.65 MB/s

LF : 7.52 MB/s

Supposed Distance = 10 um

position of the target = 10.1 um

micrometer = 8.7 um

Voltage = 7.97 V

nothing has changed. the situation is stable.

  48   Fri Mar 3 07:32:28 2023 OSTRuns General 

plunger run # 188

Beam dump 2.5 enA

Collimator  0.8 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0030.caendat

RU : 4.15 MB/s

LF : 7.69 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9 um

Voltage = 8.964 V

Readout data decreased 5 mb/s to 4 mb/s during 6:30 to 7:30 am. slowly returning to normal value

 

  49   Fri Mar 3 08:20:13 2023 KWLRuns General 

plunger run # 196

Beam dump 1 enA (given by operators) * 7 (following entry ID#39) = 7 enA

Collimator   0.75  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0033.caendat

RU : 4.10 MB/s

LF : 7.48 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9 um

Voltage = 7.94 V

  50   Fri Mar 3 09:30:15 2023 IP. KWLRuns General 

plunger run # 208

Beam dump 0.75 enA (given by operators) * 7 (following entry ID#39) = 5.25 enA

Collimator   0.75  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0037.caendat

RU : 3.85 MB/s

LF : 7,29 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9.3 um

Voltage = 7.93 V

  51   Fri Mar 3 10:09:20 2023 IP. KWLRuns Generalbeam intensity decreased to 0.3 enA (at beam dump) on our request

// we noticed yesterday that GE at 143 degrees counts more than those placed at 117 and 101. The 511 keV line (+ background) is much more pronounced for Ge at 143 degrees. To investigate this issue we decreased the beam intensity to 0.3 enA ( value given by operators at the beam dump ). 

Conclusion - decrease of the beam intensity does not explain above observations (se attached figs)

 

plunger run # 216

Beam dump 0.3 enA (given by operators) * 7 (following entry ID#39) = 2.1 enA

Collimator     enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0040.caendat

RU : 2.15 MB/s

LF : 5.60 MB/s

Supposed Distance = 10 um

position of the target = 10.6 um

micrometer = 8.8 um

Voltage = 7.8 V

  52   Fri Mar 3 10:21:18 2023 IP. KWLRuns Generalbeam intensity back to 1.25 enA at the beam dump

we increased beam intensity to 1.25 enA (readout at the beam dump)

  53   Fri Mar 3 11:37:25 2023 IPRuns General 

plunger run # 230

Beam dump 1.2  enA (given by operators) * 7 (following entry ID#39) = 8.4 enA

Collimator   0.6  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0047.caendat

RU : 5.88 MB/s

LF : 8.35 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

  54   Fri Mar 3 11:48:29 2023 IPRuns Generalbeam stopped

The beam is gone.

  55   Fri Mar 3 12:11:24 2023 IPRuns General 

the beam comes back.

  57   Fri Mar 3 13:54:41 2023 IP. KWLRuns Generalbeam energy measurement

beam stop due to the beam energy measurement

The beam energy: ~145 MeV

  58   Fri Mar 3 14:22:12 2023 IPRuns General 

the beam comes back. The run 35 is still going.

 

plunger run # 257

Beam dump .... enA (given by operators) * 7 (following entry ID#39) = ... enA

Collimator  ....   enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0059.caendat

RU : 6.18 MB/s

LF : 8.44 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

 

  59   Fri Mar 3 15:04:33 2023 KWLOther Generalrun 35 stopped

Run 35 stopped. An attempt to check if we can get 5 MeV  higher beam energy.

ELOG V3.1.5-fc6679b