  HIL099-134Sm, Page 3 of 14  ELOG logo
ID Date Author Type test Categorydown Subject Text Attachments
  35   Thu Mar 2 17:23:53 2023 BSRuns GeneralPlunger InformationsPlunger Run : 48

Supposed Distance = 10 um

position of the target = 10 um
  
  36   Thu Mar 2 17:25:36 2023 BSRuns GeneralRun 32 StoppedRun 32 Stopped   
  38   Thu Mar 2 23:01:21 2023 A.T.Runs GeneralRun 34 startedRun 34 Started (33 was stopped due to acquisition
problems)

Plunger Run : 105
  
  41   Fri Mar 3 01:15:27 2023 mgbRuns General  

plunger run # 126

Earlier:   CUP#6 
  
  42   Fri Mar 3 02:20:46 2023 mgbRuns General plunger run # 137

 

Beam dump 2.5 enA
  
  44   Fri Mar 3 03:19:34 2023 mgbRuns General plunger run # 147

 

Beam dump 2.5 enA
  
  45   Fri Mar 3 04:15:32 2023 mgbRuns General plunger run # 157

 

Beam dump 2.5 enA
  
  46   Fri Mar 3 05:18:35 2023 OSTRuns General plunger run # 167

 

Beam dump 2.5 enA
  
  47   Fri Mar 3 06:24:03 2023 OSTRuns General plunger run # 178

Beam dump 2.5 enA

Collimator  0.9 enA
  
  48   Fri Mar 3 07:32:28 2023 OSTRuns General plunger run # 188

Beam dump 2.5 enA

Collimator  0.8 enA
  
  49   Fri Mar 3 08:20:13 2023 KWLRuns General plunger run # 196

Beam dump 1 enA (given by operators)
* 7 (following entry ID#39) = 7 enA
  
  50   Fri Mar 3 09:30:15 2023 IP. KWLRuns General plunger run # 208

Beam dump 0.75 enA (given by operators)
* 7 (following entry ID#39) = 5.25 enA
  
  51   Fri Mar 3 10:09:20 2023 IP. KWLRuns Generalbeam intensity decreased to 0.3 enA (at beam dump) on our request // we noticed yesterday that GE at 143
degrees counts more than those placed at
117 and 101. The 511 keV line (+ background)
 Ge_beamInten_03enA_differentYscale.pngGe_beamInten_03enA_sameYscale.png 
  52   Fri Mar 3 10:21:18 2023 IP. KWLRuns Generalbeam intensity back to 1.25 enA at the beam dumpwe increased beam intensity to 1.25 enA
(readout at the beam dump)
  
  53   Fri Mar 3 11:37:25 2023 IPRuns General plunger run # 230

Beam dump 1.2  enA (given
by operators) * 7 (following entry ID#39)
  
  54   Fri Mar 3 11:48:29 2023 IPRuns Generalbeam stoppedThe beam is gone.   
  55   Fri Mar 3 12:11:24 2023 IPRuns General the beam comes back.   
  57   Fri Mar 3 13:54:41 2023 IP. KWLRuns Generalbeam energy measurementbeam stop due to the beam energy measurement

The beam energy: ~145 MeV
  
  58   Fri Mar 3 14:22:12 2023 IPRuns General the beam comes back. The run 35 is still
going.

 
  
  59   Fri Mar 3 15:04:33 2023 KWLOther Generalrun 35 stopped Run 35 stopped. An attempt to check if
we can get 5 MeV  higher beam energy.
  