| ID |
Date |
Author |
Type |
test |
Category |
Subject |
|
249
|
Sun Mar 12 08:03:08 2023 |
OST | Runs | | General | |
run control = 58
run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat
RU = 7.88 MB/s
LF = 3.70 MB/s
plunger:
plunger run = 1530
actual distance = 262.6 um
micrometer = 266.8 um
position = 29.9 um
voltage = 3.308 V
Beam dump: 1 nA
Colimator : 0.5 nA |
|
252
|
Sun Mar 12 17:03:12 2023 |
OST | Runs | | General | |
run control = 58
run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat
RU = 7.14 MB/s
LF = 3.46 MB/s
plunger:
plunger run = 1620
actual distance = 262.5 um
micrometer = 266.7 um
position = 29.8 um
voltage = 3.31 V
Beam dump: 0.7 nA
Colimator : 0.5 nA |
|
253
|
Sun Mar 12 18:50:37 2023 |
OST | Runs | | General | |
run control = 58
run data =xdaq 471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat
RU = 7.35 MB/s
LF = 3.50 MB/s
plunger:
plunger run = 1638
actual distance = 262.6 um
micrometer = 266.9 um
position = 29.8 um
voltage = 3.308 V
Beam dump: 0.7 nA
Colimator : 0.5 nA |
|
254
|
Sun Mar 12 19:00:59 2023 |
OST | Runs | | General | Run 58 stopped and Run 59 started. |
18:54 Run 58 stopped and 18:55 Run 59 started.
BEAM STOPPED.
END of EXPERIMENT.
Run 59 collects radioactivity.
-rw-rw-r-- 1 xdaq xdaq 295178920 Mar 12 18:59 needleLF_i58_0059_0000.adf
-rw-rw-r-- 1 xdaq xdaq 802293316 Mar 12 18:59 needleRU_i59_0059_0000.caendat |
|
190
|
Thu Mar 9 17:57:41 2023 |
MW | Runs | | General | |
run control = 51
run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0007.caendat
RU = 6.45MB/s
LF = 3.47 MB/s
plunger:
plunger run = 907
actual distance = 532.8 um
supposed distance = 532.7 um
micrometer = 533.0 um
position = 299.0 um
voltage = 1.657 V
Beam dump: 1 nA
Colimator : 0.6 enA |
|
6
|
Mon Feb 27 12:21:29 2023 |
MP, BS | Runs | | General | List of runs |
A list of runs, to be filled during the experiment is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing |
|
40
|
Fri Mar 3 00:09:19 2023 |
MP, AT | Runs | | | run 35 |
Started after beam current was reduced by a factor of 2
plunger run # 116
Earlier: CUP#6 100 enA
Now: CUP#6 50eNA
Beam dump 1.8 enA
Collimator 0.8 enA
The operator is asked to keep the beam dump current not larger than the present value.
Supposed Distance = 10 um
position of the target = 10 um
micrometer = 11.7 um
Voltage = 7.9 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.
Observed that detectors at theta 143 degrees count most. Is this because they see beam dump? |
|
92
|
Mon Mar 6 00:30:32 2023 |
MP, ANJ | Other | | Target | new target mounted |
New target mounted.
106Cd 1 mg/cm2
181Ta 1.2 mg/cm2
Problems in alignment. Offset of 100 um, in spite of the fact that a gap is visible at this distance, and a hair could be moved in between stopper and the target.
Decided to close and pump anyway, after several attempts to improve the alignment.
Stopper same as before, slightly more stretched. |
|
9
|
Wed Mar 1 00:14:28 2023 |
MP | Other | | Beam | beam energy |
Beam energy measured: 148.2 MeV
Mind that this may be an overestimate (by ~1-2 MeV) |
|
10
|
Wed Mar 1 11:52:48 2023 |
MP | Runs | | | first beam |
Operators tune beam on the target, collecting run 0023, trigger gg. |
|
11
|
Wed Mar 1 12:51:33 2023 |
MP | Runs | | Beam | beam on the target |
Beam on the target:
target+stopper+beam dump: 25 enA (1.7 pnA) not stable
5 mm collimator: 0.8 enA
data taking continued with run 0023 |
|
34
|
Thu Mar 2 16:40:45 2023 |
MP | Runs | | General | changing the plunger distance to minimum. |
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32 was started, with no beam. |
|
90
|
Sun Mar 5 16:58:45 2023 |
MP | Problems | | Other | run 37 crashed, run 38 junk |
Run 37 stopped by itslelf at 15:43. This was noticed at about 16:10 by observing that grafana data rates do not change.
Stop at Run COntrol. LF looks disabled.
Attempt to restart normal way --> run 38 --> failed
Attempts to load topology failed.
Cannot any more refresh or load the Run COntrol web page (192.168.0.133:5000)
Grzes is trying to fix the problem remotely, while we are starting changing of the target....
|
|
91
|
Sun Mar 5 22:32:56 2023 |
MP | Other | | | change of the target |
See pictures in the attachment:
1) stopper seen from the back (upstream view)
2) stopper seen from the front (downstream view)
Mind the two small off-center dots. It is clear that the beam hits the edge of the frame. This is possible because the 5 mm collimator has two small dots outside the 5 mm hole (the collimator can be seen in the beam tube).
3) old target, upstream view
4) new target, upstream view, after the stopper drove into it
5) new target, before it was mounted
6) the stopper, after the collision with the target. One of the visible rings is probably due to this collision, other traces probably reflect its complicated history earlier.
|
|
255
|
Sun Mar 12 19:20:37 2023 |
MP | Runs | | General | run 60, radioactivity, |
Run 59 collected data using gg trigger radioactivty
Run 60 trigger changed fropm gg to single g.
Just in the beginning a few minutes gg data could have been collected. |
|
257
|
Sun Mar 12 20:55:08 2023 |
MP | Runs | | | runc62 152 for efficiency calibration |
started
source in the target position, as precisely as possible
|
|
260
|
Mon Mar 13 12:15:35 2023 |
MP | Other | | | measurement of radioactivity along the beam line |
At about 12:00, 13/03/2023 (about 17 hours after the beam was stopped), a measurement of activity of the beam line was performed using FH 40G-L10 meter.
Radioctivity run 65 stopped before the measurement, radioactivity run 66 started after the measurement
Background level 120 ns/h
Target, stopper, the forward half of the target chamber - dismounted.
Approximate distance from the target position (upstream), approximate activity
10 cm 500 ns/h
25 cm 420 ns/h
35 350 ns/h
40 350 ns/h
50 200 ns/h
75 170 ns/h
|
|
261
|
Mon Mar 13 12:16:31 2023 |
MP | Other | | | run 66 |
run 66 started, radiocativity (background)
|
|
262
|
Mon Mar 13 15:16:21 2023 |
MP | Other | | | list of files copied to Bahadir's disks |
Attached are the lists of files copied to the two 4 TB Bahadir's disks.
|
|
263
|
Thu Mar 16 12:13:11 2023 |
MP | Other | | | test of radioactivity |
16/03/2023
Plunger chamber closed, some dummy target and stopper probably inside
run 72 eagle closed
run 73 right half of EAGLE completely opened
Three screenshots are attached:
Run 72 EAGLE closed
1) Three rings. There is significantly more 511 in ring 143 than in 117, 101
2) 5 detectors of ring 143. They all look similar to each other.
Run 73 right half of EAGLE opened
3) 5 detectors of ring 143. The 3 detectors in the opened half hardly see 511 keV, the other 2 do.
Check with Colibri and a gamma scintillator probe ws done: largest activity is visible close to the target chamber, in the region starting at the edge of the chamber, end ending about 6 cm upstream.
About 80 gamma counts/s are seen there. The count rate decreases further upstream.
Background rate: 20 to 30 counts/s, 25 counts/s in Sala Fizykow.
Radioactivity line seen in the spectra, with the same behaviour as 511: 743.5, 936 keV, 1434 keV. These are lines from 52Cr, fed by beta+ decay of 52Mn.
Confirmed by Michain gamma-gamma.
52Mn can be produced in the a2pn channel in the reaction 32S+27Al
|