| ID |
Date |
Author |
Type |
test |
Category |
Subject |
|
185
|
Thu Mar 9 13:22:37 2023 |
OST | Other | | Beam | beam stopped 13:21-13:24 for control |
|
|
184
|
Thu Mar 9 12:06:30 2023 |
OST | Runs | | General | |
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0070.caendat
RU = 6.89 MB/s
LF = 3.42 MB/s
plunger:
plunger run = 847
actual distance = 532.2 um
supposed distance = 532.7 um
micrometer = 533.6 um
position = 299.5 um
voltage = 1.659 V
Beam dump: 1 nA
Colimator : 0.5 enA |
|
183
|
Thu Mar 9 10:05:30 2023 |
OST | Runs | | General | |
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0058.caendat
RU = 7.48 MB/s
LF = 3.69 MB/s
plunger:
plunger run = 827
actual distance = 532.4 um
supposed distance = 532.7 um
micrometer = 533.7 um
position = 300.4 um
voltage = 1.658 V
Beam dump: 1 nA
Colimator : 0.5 enA |
|
182
|
Thu Mar 9 08:54:13 2023 |
OST | Runs | | General | |
run control = 50
run data =/onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0051.caendat
RU = 6.86 MB/s
LF = 3.42 MB/s
plunger:
plunger run = 815
actual distance = 533.6 um
supposed distance = 532.7 um
micrometer = 533.3 um
position = 299.9 um
voltage = 1.658 V
Beam dump: 1 nA
Colimator : 0.5 enA |
|
181
|
Thu Mar 9 07:28:59 2023 |
WP | Runs | | General | General |
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0042.caendat
RU = 7.20 MB/s
LF = 3.54 MB/s
plunger:
plunger run = 801
actual distance = 533.2 um
supposed distance = 532.7 um
micrometer = 533.6 um
position = 300.7 um
voltage = 1.66 V
Beam dump: 1-1.5 enA (oscillating)
Colimator : 0.6 enA
|
|
180
|
Thu Mar 9 06:24:10 2023 |
WP | Runs | | General | General |
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0035.caendat
RU = 7.39 MB/s
LF = 3.60 MB/s
plunger:
plunger run = 790
actual distance = 532.8 um
supposed distance = 532.7 um
micrometer = 533.6 um
position = 300.1 um
voltage = 1.657 V
Beam dump: 1-1.5 enA (oscillating)
Colimator : 0.6 enA
|
|
179
|
Thu Mar 9 05:19:33 2023 |
WP | Runs | | General | General |
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0028.caendat
RU = 7.15 MB/s
LF = 3.68 MB/s
plunger:
plunger run = 779
actual distance = 533.1 um
supposed distance = 532.7 um
micrometer = 533.4 um
position = 299.6 um
voltage = 1.66 V
Beam dump: 1-1.5 enA (oscillating)
Colimator : 0.6 enA
|
|
178
|
Thu Mar 9 04:17:21 2023 |
WP | Runs | | General | General |
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0022.caendat
RU = 7.48 MB/s
LF = 3.59 MB/s
plunger:
plunger run = 769
actual distance = 531.1 um
supposed distance = 532.7 um
micrometer = 533.7 um
position = 300.5 um
voltage = 1.655 V
Beam dump: 1-1.5 enA (oscillating)
Colimator : 0.6 enA
|
|
177
|
Thu Mar 9 03:14:39 2023 |
WP | Runs | | General | General |
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0015.caendat
RU = 6.91 MB/s
LF = 3.48 MB/s
plunger:
plunger run = 758
actual distance = 533.5 um
supposed distance = 532.7 um
micrometer = 533.1 um
position = 300.9 um
voltage = 1.658 V
Beam dump: 1-1.5 enA (oscillating)
Colimator : 0.6 enA
|
|
176
|
Thu Mar 9 02:14:09 2023 |
WP | Runs | | General | General |
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0008.caendat
RU = 7.24 MB/s
LF = 3.64 MB/s
plunger:
plunger run = 748
actual distance = 532.1 um
supposed distance = 532.7 um
micrometer = 532.9 um
position = 299.4 um
voltage = 1.66 V
Beam dump: 1-1.5 enA (oscillating)
Colimator : 0.6 enA
|
|
175
|
Thu Mar 9 01:41:50 2023 |
GJ | Problem Fixed | | Hardware | TS zeroing - cables to S-IN from VME controller - between runs 49 and 50 |
Since we were observing jumps of 16 ns in timings of all channels of whole boards, the assumption was that the
signals from logical FIFO arrive at different times to S-IN inputs to zero the TS counters.
6 originally placed cables of quite the same length were replaced with 6 cables of declared 3-ns length, same
producer, borrowed from NW's equipment. |
|
174
|
Thu Mar 9 01:07:48 2023 |
WP | Runs | | General | New run started 50 (distance change) |
run control = 50
run data = /onlineNEDA_00/xData/hil099/run_0050_09-03-2023_00h50m28s/needleRU_i50_0050_0000.caendat
RU = 7.43MB/s
LF = 3.61 MB/s
plunger:
plunger run = 736
actual distance = 533 um
supposed distance = 532.7 um
micrometer = 533.5 um
position = 300 um
voltage = 1.657 V
Beam dump: 1-1.5 enA (oscillating)
Colimator : 0.6 enA
|
|
173
|
Wed Mar 8 22:36:30 2023 |
OST | Runs | | General | |
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0082.caendat
RU = 6.06 MB/s
LF = 3.44 MB/s
plunger:
plunger run = 709
actual distance = 382.9 um
supposed distance = 382.7 um
micrometer = 384.7 um
position = 150.2 um
voltage = 2.145 V
Beam dump: 1 nA
Colimator : 0.5 nA |
|
172
|
Wed Mar 8 20:46:16 2023 |
OST | Runs | | General | |
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0074.caendat
RU = 6.35 MB/s
LF = 3.47 MB/s
plunger:
plunger run = 693
actual distance = 382.5 um
supposed distance = 382.7 um
micrometer = 384.1 um
position = 149.8 um
voltage = 2.148 V
Beam dump: 1 nA
Colimator : 0.5 nA |
|
171
|
Wed Mar 8 19:01:49 2023 |
OST | Runs | | General | beam current was very low and beam increased after this entry |
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0064.caendat
RU = 5.75 MB/s
LF = 3.50 MB/s
plunger:
plunger run = 676
actual distance = 382.8 um
supposed distance = 382.7 um
micrometer = 384.9 um
position = 150.4 um
voltage = 2.146 V
Beam dump 0.7 |
|
170
|
Wed Mar 8 18:02:43 2023 |
BS | Runs | | General | Rates |
|
|
169
|
Wed Mar 8 17:59:38 2023 |
BS | Runs | | General | General |
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0058.caendat
RU = 9.83 MB/s
LF = 4.87 MB/s
plunger:
plunger run = 665
actual distance = 382.7 um
supposed distance = 382.7 um
micrometer = 384.4 um
position = 150.0 um
voltage = 2.148 V
Beam dump 1,25 ~ 1.5 nA |
|
168
|
Wed Mar 8 16:53:07 2023 |
BS | Runs | | General | Rates |
|
|
167
|
Wed Mar 8 16:51:13 2023 |
BS | Runs | | General | |
run control = 49
run data = /onlineNEDA_00/xData/hil099/run_0049_08-03-2023_09h31m08s/needleRU_i49_0049_0050.caendat
RU = 6.75 MB/s
LF = 3.44 MB/s
plunger:
plunger run = 654
actual distance = 382.7 um
supposed distance = 382.7 um
micrometer = 384.4 um
position = 150.0 um
voltage = 2.147 V
Beam dump 1 nA |
|
166
|
Wed Mar 8 15:57:53 2023 |
IK, AM | Problems | | General | Beam issue |
no beam in 15:52 - 16:21 due to power supply problem |