| ID |
Date |
Author |
Type |
test |
Category |
Subject |
Text |
 |
|
249
|
Sun Mar 12 08:03:08 2023 |
OST | Runs | | General | | run control = 58
run data = xdaq 3303602776 Mar
12 08:01 needleRU_i58_0058_0024.caendat |
|
|
252
|
Sun Mar 12 17:03:12 2023 |
OST | Runs | | General | | run control = 58
run data =xdaq 1111949504 Mar 12
17:01 needleRU_i58_0058_0083.caendat |
|
|
253
|
Sun Mar 12 18:50:37 2023 |
OST | Runs | | General | | run control = 58
run data =xdaq 471656980
Mar 12 18:47 needleRU_i58_0058_0095.caendat |
|
|
254
|
Sun Mar 12 19:00:59 2023 |
OST | Runs | | General | Run 58 stopped and Run 59 started. | 18:54 Run 58 stopped and 18:55 Run 59 started.
BEAM STOPPED.
END of EXPERIMENT. |
|
|
190
|
Thu Mar 9 17:57:41 2023 |
MW | Runs | | General | | run control = 51
run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0007.caendat
RU = 6.45MB/s |
|
|
6
|
Mon Feb 27 12:21:29 2023 |
MP, BS | Runs | | General | List of runs | A list of runs, to be filled during the experiment
is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing |
|
|
40
|
Fri Mar 3 00:09:19 2023 |
MP, AT | Runs | | | run 35 | Started after beam current was reduced
by a factor of 2
plunger run # 116 |
|
|
92
|
Mon Mar 6 00:30:32 2023 |
MP, ANJ | Other | | Target | new target mounted | New target mounted.
106Cd 1 mg/cm2
181Ta 1.2 mg/cm2 |
|
|
9
|
Wed Mar 1 00:14:28 2023 |
MP | Other | | Beam | beam energy | Beam energy measured: 148.2 MeV
Mind that this may be an overestimate (by
~1-2 MeV) |
|
|
10
|
Wed Mar 1 11:52:48 2023 |
MP | Runs | | | first beam | Operators tune beam on the target, collecting
run 0023, trigger gg. |
|
|
11
|
Wed Mar 1 12:51:33 2023 |
MP | Runs | | Beam | beam on the target | Beam on the target:
target+stopper+beam dump: 25 enA (1.7 pnA) |
|
|
34
|
Thu Mar 2 16:40:45 2023 |
MP | Runs | | General | changing the plunger distance to minimum. | Run 31 was stopped, because plunger distance
is reduced to the mininimal one.
It takes time, in the meantime, after some |
|
|
90
|
Sun Mar 5 16:58:45 2023 |
MP | Problems | | Other | run 37 crashed, run 38 junk | Run 37 stopped by itslelf at 15:43. This
was noticed at about 16:10 by observing that
grafana data rates do not change. |
|
|
91
|
Sun Mar 5 22:32:56 2023 |
MP | Other | | | change of the target | See pictures in the attachment:
1) stopper seen from the back (upstream
view) |
6x |
|
255
|
Sun Mar 12 19:20:37 2023 |
MP | Runs | | General | run 60, radioactivity, | Run 59 collected data using gg trigger
radioactivty
Run 60 trigger changed fropm gg |
|
|
257
|
Sun Mar 12 20:55:08 2023 |
MP | Runs | | | runc62 152 for efficiency calibration | started
source in the target position,
as precisely as possible |
|
|
260
|
Mon Mar 13 12:15:35 2023 |
MP | Other | | | measurement of radioactivity along the beam line | At about 12:00, 13/03/2023 (about
17 hours after the beam was stopped), a measurement
of activity of the beam line was performed |
|
|
261
|
Mon Mar 13 12:16:31 2023 |
MP | Other | | | run 66 | run 66 started, radiocativity (background)
|
|
|
262
|
Mon Mar 13 15:16:21 2023 |
MP | Other | | | list of files copied to Bahadir's disks | Attached are the lists of files copied
to the two 4 TB Bahadir's disks.
|
 |
|
263
|
Thu Mar 16 12:13:11 2023 |
MP | Other | | | test of radioactivity | 16/03/2023
Plunger chamber closed, some dummy
target and stopper probably inside |
  |