EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 5 of 14  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Type test Category Subject Text Attachments
  249   Sun Mar 12 08:03:08 2023 OSTRuns General run control = 58

run data = xdaq 3303602776 Mar
12 08:01 needleRU_i58_0058_0024.caendat
  
  252   Sun Mar 12 17:03:12 2023 OSTRuns General run control = 58

run data =xdaq 1111949504 Mar 12
17:01 needleRU_i58_0058_0083.caendat
  
  253   Sun Mar 12 18:50:37 2023 OSTRuns General run control = 58

run data =xdaq  471656980
Mar 12 18:47 needleRU_i58_0058_0095.caendat
  
  254   Sun Mar 12 19:00:59 2023 OSTRuns GeneralRun 58 stopped and Run 59 started.18:54 Run 58 stopped and 18:55 Run 59 started.

BEAM STOPPED.

END of EXPERIMENT.
  
  190   Thu Mar 9 17:57:41 2023 MWRuns General run control = 51

run data = /onlineNEDA_00/xData/hil099/run_0051_09-03-2023_16h25m16s/needleRU_i51_0051_0007.caendat

RU =  6.45MB/s
  
  6   Mon Feb 27 12:21:29 2023 MP, BSRuns GeneralList of runsA list of runs, to be filled during the experiment
is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing
  
  40   Fri Mar 3 00:09:19 2023 MP, ATRuns  run 35Started after beam current was reduced
by a factor of 2

plunger run # 116
  
  92   Mon Mar 6 00:30:32 2023 MP, ANJOther Targetnew target mountedNew target mounted.

106Cd 1 mg/cm2

181Ta  1.2 mg/cm2
  
  9   Wed Mar 1 00:14:28 2023 MPOther Beambeam energyBeam energy measured:  148.2 MeV
Mind that this may be an overestimate (by
~1-2 MeV)
  
  10   Wed Mar 1 11:52:48 2023 MPRuns  first beamOperators tune beam on the target, collecting
run 0023, trigger gg.
  
  11   Wed Mar 1 12:51:33 2023 MPRuns Beambeam on the targetBeam on the target:

target+stopper+beam dump: 25 enA   (1.7 pnA)
  
  34   Thu Mar 2 16:40:45 2023 MPRuns Generalchanging the plunger distance to minimum.Run 31 was stopped, because plunger distance
is reduced to the mininimal one.
It takes time, in the meantime, after some
  
  90   Sun Mar 5 16:58:45 2023 MPProblems Otherrun 37 crashed, run 38 junkRun 37 stopped by itslelf at 15:43. This
was noticed at about 16:10 by observing that
grafana data rates do not change.
  
  91   Sun Mar 5 22:32:56 2023 MPOther  change of the targetSee pictures in the attachment:

1) stopper seen from the back (upstream
view)
 6x 
  255   Sun Mar 12 19:20:37 2023 MPRuns Generalrun 60, radioactivity, Run 59 collected data using gg trigger
radioactivty

Run 60 trigger changed fropm gg
  
  257   Sun Mar 12 20:55:08 2023 MPRuns  runc62 152 for efficiency calibrationstarted

source in the target position,
as precisely as possible
  
  260   Mon Mar 13 12:15:35 2023 MPOther  measurement of radioactivity along the beam lineAt about 12:00, 13/03/2023 (about 
17 hours after the beam was stopped), a measurement
of activity of the beam line was performed
  
  261   Mon Mar 13 12:16:31 2023 MPOther  run 66run 66 started, radiocativity (background)

 
  
  262   Mon Mar 13 15:16:21 2023 MPOther  list of files copied to Bahadir's disksAttached are the lists of files copied
to the two 4 TB Bahadir's disks.

 
 disk1.list_of_filesdisk2.list_of_files 
  263   Thu Mar 16 12:13:11 2023 MPOther  test of radioactivity16/03/2023

Plunger chamber closed, some dummy
target and stopper probably inside
 rings_16mar2023_0905.pngrings143_16mar2023_0908.pngrings143_16mar2023_0920.png 
ELOG V3.1.5-fc6679b