| ID |
Date |
Author |
Type |
test |
Category |
Subject |
|
107
|
Mon Mar 6 09:53:06 2023 |
OST | Problems | | Beam | Beam dump decreased 2.5 nA to 1.5 nA- stopped run 41 |
9:20 to 9:50 am beam current stayed 2.5 nA . After 9:50 am decrease 1.5 nA |
|
89
|
Sun Mar 5 15:07:24 2023 |
mgb | Runs | | General | Beam dump decreased 1.0 nA to 0.75 |
RUN CONTROL = 37
Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0106.caendat
RU = 8.65 MB/s
LF = 4.11 MB/s
Plunger ;
Planger run = 745
Supposed Dist=240 um
Micrometer = 187.5 um
Position = 241.1 um
Actual distance = 240.6 um
Voltage = 2.715 V
Beam dumb = 0.75 nA
Collimeter =0.65 nA
|
|
250
|
Sun Mar 12 09:15:00 2023 |
EG | Other | | | Array_monitors mat refresh synchronization |
Beam stable, counting rate within limits, plunger distance within the given tollerance, gamma spectra ok, everything looks good but....
(yes there must be some "but"), refreshing of EAGLE_array_monitor.mat and NEDA_array_monitor.mat are out of sync. Mostly pure red colour is dysplayed. Not very usefull and (I suppose) missleading information.
|
|
56
|
Fri Mar 3 13:43:56 2023 |
IP. KWL | Runs | | | 511 annihilation and 279 Au lines in Ge rings |
The counting rate in 511 keV line for sum of the Ge detectors placed at 101, 117 and 143 degrees (with approved ACS). The largest intensity is visible for Ge at 143 degrees, lowest for 101 deg.
=============================== RING 101
Integration in spectrum user_ge_ring101_acceptedACS_clone.spc
RESULT : 3895
=============================== RING 117
Integration in spectrum user_ge_ring117_acceptedACS.spc
RESULT : 9392
=============================== RING 143
Integration in spectrum user_ge_ring143_acceptedACS.spc
RESULT : 15767
The Coulex of 197Au (279.5 keV ) line is visible in all rings with a comparable intensity:
=============================== RING 101
Integration in spectrum user_ge_ring101_acceptedACS_clone.spc
RESULT : 12491
=============================== RING 117
Integration in spectrum user_ge_ring117_acceptedACS.spc
RESULT : 11443
===============================RING 143
Integration in spectrum user_ge_ring143_acceptedACS.spc
RESULT : 10460
|
| Attachment 1: ge_rings101_117_143_acceptedACS_gold_line_279keV.png
|
|
| Attachment 2: ge_rings101_117_143_acceptedACS.png
|
|
|
265
|
Tue Jan 23 16:55:21 2024 |
yes | Other | | | 106Cd certificate |
|
| Attachment 1: Slp823030223120.pdf
|
|
|
15
|
Wed Mar 1 20:10:38 2023 |
BS, DOD | Other | | General | |
Run 26 is going on but not much for the moment in terms of any useful data.
And half of the EAGLE is opened.
20:50 EAGLE closed. |
|
16
|
Wed Mar 1 21:59:45 2023 |
MB BS | Other | | General | |
Offset of the plunger is 60 um.
new distcal01_vac_after_opening |
|
17
|
Thu Mar 2 00:30:29 2023 |
BS, DOD | Runs | | General | |
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0011.caendat
RU = 5.58 Mb/s
LF = 3.72 Mb/s |
|
18
|
Thu Mar 2 04:17:40 2023 |
DOD | Runs | | General | |
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0027.caendat
RU = 5.10 Mb/s
LF = 3.75 Mb/s
Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates. |
|
19
|
Thu Mar 2 05:33:34 2023 |
ost-dod | Runs | | General | |
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0031.caendat
RU = 4.70 Mb/s
LF = 3.20 Mb/s
Nothing really to report. The data rates are slowly decreasing from around 3 am. Still observing the frequent sharp minima in the data rates. |
|
20
|
Thu Mar 2 07:40:55 2023 |
ost-dod | Runs | | General | |
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/currentRun/needleRU_i27_0027_0038.caendat
RU = 4.48 Mb/s
LF = 4.07 Mb/s
Nothing really to report. The data rates have been fairly constant since around 4 am. Still observing the frequent sharp minima in the data rates. |
|
23
|
Thu Mar 2 09:24:47 2023 |
ost-mgb | Runs | Run 27 stopped | General | |
Run 27 stopped |
|
26
|
Thu Mar 2 11:14:44 2023 |
ost-mgb | Runs | | General | |
un 29 with single gamma trigger
Plunger feedback system is not connected.
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0029_02-03-2023_10h28m22s/needleRU_i29_0029_0021.caendat
RU = 40.1 Mb/s
LF = 12.5 Mb/s |
|
29
|
Thu Mar 2 12:09:44 2023 |
ost-mgb | Runs | | General | |
beam stop, |
|
31
|
Thu Mar 2 14:59:32 2023 |
mgb | Runs | | General | |
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat
RU = 3.53 Mb/s
LF = 2.40 Mb/s |
|
33
|
Thu Mar 2 16:06:17 2023 |
A.T. | Runs | | General | |
Data
Position = 522.6
Supposed = 520
Plunger run = 32
Micrometer = 525.3
Run Data = /onlineNEDA_00/xData/hil099/run_0031_02-03-2023_11h18m31s/needleRU_i30_0031_0011.caendat
RU = 3.53 Mb/s
LF = 2.40 Mb/s
cables to colimeter are checked and replaced. |
|
41
|
Fri Mar 3 01:15:27 2023 |
mgb | Runs | | General | |
plunger run # 126
Earlier: CUP#6 100 enA
Now: CUP#6 50eNA
Beam dump 2.3 enA
Collimator 1.0 enA
RU : 5.44 MB/s
LF : 8.40 MB/s
Supposed Distance = 10 um
position of the target = 10.9 um
micrometer = 10.3 um
Voltage = 7.896 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |
|
42
|
Fri Mar 3 02:20:46 2023 |
mgb | Runs | | General | |
plunger run # 137
Beam dump 2.5 enA
Collimator 1.0 enA
02:21 /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0010.caendat
RU : 4.70 MB/s
LF : 7.92 MB/s
Supposed Distance = 10 um
position of the target = 10.7 um
micrometer = 9.8 um
Voltage = 7.89 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |
|
44
|
Fri Mar 3 03:19:34 2023 |
mgb | Runs | | General | |
plunger run # 147
Beam dump 2.5 enA
Collimator 0.9 enA
Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0014.caendat
RU : 4.90 MB/s
LF : 8.07 MB/s
Supposed Distance = 10 um
position of the target = 10.5 um
micrometer = 9.2 um
Voltage = 7.93 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |
|
45
|
Fri Mar 3 04:15:32 2023 |
mgb | Runs | | General | |
plunger run # 157
Beam dump 2.5 enA
Collimator 1.0 enA
Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0018.caendat
RU : 4.79 MB/s
LF : 7.69 MB/s
Supposed Distance = 10 um
position of the target = 10.2 um
micrometer = 8.9 um
Voltage = 7.94 V
Plunger off set 60 um
Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um. |