EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 8 of 15  ELOG logo
ID Date Author Type test Category Subjectdown Text Attachments
  166   Wed Mar 8 15:57:53 2023 IK, AMProblems GeneralBeam issueno beam in 15:52 - 16:21 due to power supply
problem
  
  231   Sat Mar 11 12:42:42 2023 EGOther  Beam intensity reductionAgain beam intensity gradually increased
reaching 2.4 kHz ontotal rate EAGLE_0 ch4. 
Beam intensity reduction requested. 1.8 kHz
  
  234   Sat Mar 11 15:16:31 2023 EGOther  Beam intensity reduced againAgain beam intensity to high. Reduced to
2 kHz on ch4 GE
  
  232   Sat Mar 11 14:15:55 2023 EGRuns  Beam intensity rapid increase 14:12 beam intensity instability. Rapid
increase of beam intensity - twice the previous
value. Returned to normal after 4 minutes.
  
  Draft   Thu Apr 16 05:09:13 2026 EGRuns  Beam intensity rapid increase  




  
  233   Sat Mar 11 14:42:28 2023 EGRuns  Beam instabilitiesLarge beam intensity instabilities from
14:10 till 14:40.  Beam intensity reduction
requested. CH4 on Total rate EAGLE_0 returned
  
  107   Mon Mar 6 09:53:06 2023 OSTProblems BeamBeam dump decreased 2.5 nA to 1.5 nA- stopped run 419:20 to 9:50 am beam current stayed 2.5
nA . After 9:50 am decrease 1.5 nA
  
  89   Sun Mar 5 15:07:24 2023 mgbRuns GeneralBeam dump decreased 1.0 nA to 0.75RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0106.caendat

RU = 8.65 MB/s
  
  Draft   Wed Apr 8 10:50:22 2026 mgbRuns GeneralBeam dump decreased 1.0 nA to 0.75RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0106.caendat

RU = 8.65 MB/s
  
  250   Sun Mar 12 09:15:00 2023 EGOther  Array_monitors mat refresh synchronizationBeam stable, counting rate within limits,
plunger distance within the given tollerance,
gamma spectra ok, everything looks good but....
  
  56   Fri Mar 3 13:43:56 2023 IP. KWLRuns  511 annihilation and 279 Au lines in Ge ringsThe counting rate in 511 keV line for sum
of the Ge detectors placed at 101, 117 and
143 degrees (with approved ACS). The largest
 ge_rings101_117_143_acceptedACS_gold_line_279keV.pngge_rings101_117_143_acceptedACS.png 
  265   Tue Jan 23 16:55:21 2024 yesOther  106Cd certificate   Slp823030223120.pdf 
  15   Wed Mar 1 20:10:38 2023 BS, DODOther General Run 26 is going on but not much for the
moment in terms of any useful data.

And half of the EAGLE is opened.
  
  16   Wed Mar 1 21:59:45 2023 MB BSOther General Offset of the plunger is 60 um.

new distcal01_vac_after_opening
  
  17   Thu Mar 2 00:30:29 2023 BS, DODRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  18   Thu Mar 2 04:17:40 2023 DODRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  19   Thu Mar 2 05:33:34 2023 ost-dodRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  20   Thu Mar 2 07:40:55 2023 ost-dodRuns General Run 27 with single gamma trigger

Plunger feedback system is not
conected.
  
  23   Thu Mar 2 09:24:47 2023 ost-mgbRunsRun 27 stoppedGeneral Run 27 stopped   
  26   Thu Mar 2 11:14:44 2023 ost-mgbRuns General un 29 with single gamma trigger

Plunger feedback system is not
connected.
  
ELOG V3.1.5-fc6679b