EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 9 of 14  ELOG logo
Entry  Mon Mar 6 06:11:51 2023, JD, DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0031.caendat

RU =    7.58 MB/s

LF =   3.76 MB/s

Plunger ;

Plunger run = 67

Supposed Dist= 242.7 um

Micrometer =   245.4 um

Position =    9.9 um

Actual distance =242.6  um

Voltage =    3.814 V

Beam dumb =  2.5 nA

Collimeter =  1 nA

Entry  Mon Mar 6 05:21:16 2023, JD DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0026.caendat

RU =    8.24 MB/s

LF =   3.96 MB/s

Plunger ;

Plunger run = 58

Supposed Dist= 242.7 um

Micrometer =   245.0um

Position =    9.9 um

Actual distance =242.5  um

Voltage =    3.816V

Beam dumb =  2.5 nA

Collimeter =  1.1 nA

Entry  Mon Mar 6 05:16:46 2023, JD, DW, Problem Fixed, , Beam,  

Beam back on 05:15

Entry  Mon Mar 6 05:15:43 2023, JD, DW, Problems, , Beam, No beam 05:10:00 

No beam 05:10:00

Entry  Mon Mar 6 04:17:48 2023, JD, DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0020.caendat

RU =    7.26 MB/s

LF =   3.72 MB/s

Plunger ;

Plunger run = 47

Supposed Dist= 242.7 um

Micrometer =  244.5 um

Position =   9.6 um

Actual distance =  242.3 um

Voltage =   3.826 V

Beam dumb =  2.5 nA

Collimeter =  0.8 nA

Entry  Mon Mar 6 03:17:48 2023, JD, DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0014.caendat

RU =   6.94 MB/s

LF =  3.62 MB/s

Plunger ;

Planger run = 38

Supposed Dist=  242.7um

Micrometer =  244.2 um

Position =  9.6 um

Actual distance = 242.4 um

Voltage =  3.822 V

Beam dumb =  2.5 nA

Collimeter = 0.85 nA

Entry  Mon Mar 6 02:13:32 2023, JD, DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0007.caendat

RU =  7.55 MB/s

LF = 3.79 MB/s

Plunger ;

Planger run = 27

Supposed Dist= 242.7 um

Micrometer =  243.6 um

Position =  9.6 um

Actual distance = 242.3 um

Voltage =  3.825 V

Beam dumb = 2.5 nA

Collimeter = 0.9 nA

Entry  Mon Mar 6 01:10:59 2023, JD, DW, Runs, , General,  

RUN CONTROL = 41

Data = /onlineNEDA_00/xData/hil099/run_0041_06-03-2023_00h58m13s/needleRU_i41_0041_0000.caendat

RU = 6.23 MB/s

LF = 3.55 MB/s

Plunger ;

Planger run = 16

Supposed Dist= 242.7 um

Micrometer =  242.7um

Position =  9.7 um

Actual distance = 242.4um

Voltage =  3.824V

Beam dumb = 2.75 nA

Collimeter = 0.8 nA

Entry  Mon Mar 6 01:01:26 2023, BS, Runs, , General, Run 41 started 

Run 41 started

Plunger distance 10 um

Entry  Mon Mar 6 01:00:29 2023, BS, Runs, , General, Run 40 stooped 

Run 40 stooped

Entry  Mon Mar 6 00:43:27 2023, BS, GJ, Runs, , General, Run 40 Started LocalFilter.conf

Before this run TSs were moved on the LF level, so the BU has easier job to do and everything is more stable.

BU gate was changed from 1500 to 500 ns, this stay valid from now on.

 

 

Run 40 Started.

New target

Offset 100 um

RUN CONTROL = 40

Data = /onlineNEDA_00/xData/hil099/run_0040_06-03-2023_00h38m10s/needleRU_i40_0040_0000.caendat

RU = 7.21 MB/s

LF = 3.55 MB/s

Plunger ;

Planger run = 8

0-Point = 232, 7 um

Supposed Distance = 234,7 um

Micrometer = 187.5 um

Position = 241.1 um

Actual Distance = 234,5 um

Voltage =4,106V

Beam dumb =

Collimeter =

Entry  Mon Mar 6 00:30:32 2023, MP, ANJ, Other, , Target, new target mounted 

New target mounted.

106Cd 1 mg/cm2

181Ta  1.2 mg/cm2

 

Problems in alignment. Offset of 100 um, in spite of the fact that a gap is visible at this distance, and a hair could be moved in between stopper and the target.
Decided to close and pump anyway, after several attempts to improve the alignment.

Stopper same as before, slightly more stretched.

Entry  Sun Mar 5 22:32:56 2023, MP, Other, , , change of the target 6x

See pictures in the attachment:

1) stopper seen from the back (upstream view)

2) stopper  seen from the front (downstream view)

Mind the two small off-center dots. It is clear that the beam hits the edge of the frame.  This is possible because the 5 mm collimator has two small dots outside the 5 mm hole (the collimator  can be seen in the beam tube).

3) old target, upstream view

4)  new target, upstream view, after the stopper drove into it

5) new target, before it was mounted

6) the stopper, after the collision with the target. One of the visible rings is probably due to this collision, other traces probably reflect its complicated history earlier.

 

 

Entry  Sun Mar 5 16:58:45 2023, MP, Problems, , Other, run 37 crashed, run 38 junk 

Run 37 stopped by itslelf at 15:43. This was noticed at about 16:10 by observing that grafana data rates do not change.

Stop at Run COntrol.  LF looks  disabled.

Attempt to restart normal way --> run 38  --> failed

Attempts to load topology failed.

Cannot any more refresh or load the Run COntrol web page (192.168.0.133:5000)

Grzes is trying to fix the problem remotely, while we are starting changing of the target....

 

 

Entry  Sun Mar 5 15:07:24 2023, mgb, Runs, , General, Beam dump decreased 1.0 nA to 0.75 

RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0106.caendat

RU = 8.65 MB/s

LF = 4.11 MB/s

Plunger ;

Planger run = 745

Supposed Dist=240 um

Micrometer = 187.5 um

Position = 241.1 um

Actual distance = 240.6 um

Voltage = 2.715 V

Beam dumb = 0.75 nA

Collimeter =0.65 nA

 

Entry  Sun Mar 5 13:52:34 2023, OST, Runs, , General,  

RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0097.caendat

RU = 8.17

LF = 4.04

Plunger ;

Planger run = 733

Supposed Dist=240

Micrometer = 187.6

Position = 241.3

Voltage = 2.715

Beam dumb = 1 nA

Collimeter =0.8 nA

Everything is stable

Entry  Sun Mar 5 11:45:36 2023, OST, Runs, , General,  

RUN CONTROL = 37

Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0082.caendat

RU = 8.50

LF = 4.14

Plunger ;

Planger run = 712

Supposed Dist=240

Micrometer = 187.6

Position = 241.3

Voltage = 2.714

Beam dumb = 1 nA

Collimeter =0.8 nA

Everything is stable.

Entry  Sun Mar 5 10:17:03 2023, OST, Runs, , General,  

RUN CONTROL = 37

Data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0072.caendat

RU = 8.01

LF = 4.02

Plunger ;

Planger run = 698

Supposed Dist=240

Micrometer = 186.9

Position = 240.8

Voltage = 2.72

Beam dumb = 1 nA

Collimeter =0.7 nA

Everything is stable.

Entry  Sun Mar 5 08:54:08 2023, OST, Runs, , General,  

RUN CONTROL = 37

Data = /onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0061.caendat

RU = 8.12

LF = 3.94

Plunger ;

Planger run = 683

Supposed Dist=240

Micrometer = 186.4

Position = 239.9

Voltage = 2.724

Beam dumb = 1 nA

Collimeter =2.5 nA

Everything is stable.

Entry  Sun Mar 5 07:12:49 2023, JD DW, Runs, , General,  

RUN CONTROL = 37

run data =/onlineNEDA_00/xData/hil099/run_0037_04-03-2023_22h56m17s/needleRU_i37_0037_0051.caendat

RU =   8.02 MB/s

LF =   3.97 MB/s

Plunger ;

Plunger run = 667

Supposed Dist=   240 um

Actual Distance = 238.8 um

micrometer =  186.0 um

Voltage =   2.723  V

Beam dumb = 1 nA

Collimeter = 0.75 nA

ELOG V3.1.5-fc6679b