EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 9 of 15  ELOG logo
ID Date Author Type test Category Subjectdown
  29   Thu Mar 2 12:09:44 2023 ost-mgbRuns General 

beam stop,

  31   Thu Mar 2 14:59:32 2023 mgbRuns General 

 

 

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0030_02-03-2023_11h18m31s/needleRU_i30_0030_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

  33   Thu Mar 2 16:06:17 2023 A.T.Runs General 

Data

Position = 522.6

Supposed = 520

Plunger run = 32

Micrometer = 525.3

Run Data = /onlineNEDA_00/xData/hil099/run_0031_02-03-2023_11h18m31s/needleRU_i30_0031_0011.caendat

 

RU = 3.53 Mb/s

LF = 2.40 Mb/s

cables to colimeter are checked and replaced.

  41   Fri Mar 3 01:15:27 2023 mgbRuns General 

 

plunger run # 126

Earlier:   CUP#6  100 enA

Now: CUP#6   50eNA

Beam dump 2.3 enA

Collimator  1.0 enA

 

RU : 5.44 MB/s

LF : 8.40 MB/s

Supposed Distance = 10 um

position of the target = 10.9 um

micrometer = 10.3 um

Voltage = 7.896 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  42   Fri Mar 3 02:20:46 2023 mgbRuns General 

plunger run # 137

 

Beam dump 2.5 enA

Collimator  1.0 enA

02:21 /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0010.caendat

RU : 4.70 MB/s

LF : 7.92 MB/s

Supposed Distance = 10 um

position of the target = 10.7 um

micrometer = 9.8 um

Voltage = 7.89 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  44   Fri Mar 3 03:19:34 2023 mgbRuns General 

plunger run # 147

 

Beam dump 2.5 enA

Collimator  0.9 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0014.caendat

RU : 4.90 MB/s

LF : 8.07 MB/s

Supposed Distance = 10 um

position of the target = 10.5 um

micrometer = 9.2 um

Voltage = 7.93 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  45   Fri Mar 3 04:15:32 2023 mgbRuns General 

plunger run # 157

 

Beam dump 2.5 enA

Collimator  1.0 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0018.caendat

RU : 4.79 MB/s

LF : 7.69 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.9 um

Voltage = 7.94 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

  46   Fri Mar 3 05:18:35 2023 OSTRuns General 

plunger run # 167

 

Beam dump 2.5 enA

Collimator  1.0 enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0022.caendat

RU : 4.90 MB/s

LF : 8.01 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.941 V

nothing has changed. the situation is stable.

  47   Fri Mar 3 06:24:03 2023 OSTRuns General 

plunger run # 178

Beam dump 2.5 enA

Collimator  0.9 enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0027.caendat

RU : 4.65 MB/s

LF : 7.52 MB/s

Supposed Distance = 10 um

position of the target = 10.1 um

micrometer = 8.7 um

Voltage = 7.97 V

nothing has changed. the situation is stable.

  48   Fri Mar 3 07:32:28 2023 OSTRuns General 

plunger run # 188

Beam dump 2.5 enA

Collimator  0.8 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0030.caendat

RU : 4.15 MB/s

LF : 7.69 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9 um

Voltage = 8.964 V

Readout data decreased 5 mb/s to 4 mb/s during 6:30 to 7:30 am. slowly returning to normal value

 

  49   Fri Mar 3 08:20:13 2023 KWLRuns General 

plunger run # 196

Beam dump 1 enA (given by operators) * 7 (following entry ID#39) = 7 enA

Collimator   0.75  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0033.caendat

RU : 4.10 MB/s

LF : 7.48 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9 um

Voltage = 7.94 V

  50   Fri Mar 3 09:30:15 2023 IP. KWLRuns General 

plunger run # 208

Beam dump 0.75 enA (given by operators) * 7 (following entry ID#39) = 5.25 enA

Collimator   0.75  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0037.caendat

RU : 3.85 MB/s

LF : 7,29 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9.3 um

Voltage = 7.93 V

  53   Fri Mar 3 11:37:25 2023 IPRuns General 

plunger run # 230

Beam dump 1.2  enA (given by operators) * 7 (following entry ID#39) = 8.4 enA

Collimator   0.6  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0047.caendat

RU : 5.88 MB/s

LF : 8.35 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

  55   Fri Mar 3 12:11:24 2023 IPRuns General 

the beam comes back.

  58   Fri Mar 3 14:22:12 2023 IPRuns General 

the beam comes back. The run 35 is still going.

 

plunger run # 257

Beam dump .... enA (given by operators) * 7 (following entry ID#39) = ... enA

Collimator  ....   enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0059.caendat

RU : 6.18 MB/s

LF : 8.44 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

 

  65   Sat Mar 4 08:27:23 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0087.caendat

RU = 4.57

LF = 3.11

Plunger ;

Planger run = 437

Supposed Dist=10

Micrometer = 10.1

Position = 10.4

Voltage = 7.923

Beam dumb = 0.75 nA

Collimeter =0.5 nA

Everythings is looking stable.

  66   Sat Mar 4 09:51:32 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0094.caendat

RU = 6.43

LF = 3.45

Plunger ;

Planger run = 452

Supposed Dist=10

Micrometer = 10.4

Position = 10.4

Voltage = 7.926

Beam dumb = 1 nA

Collimeter =0.5 nA

Everythings is looking stable.

  67   Sat Mar 4 11:06:31 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0100.caendat

RU = 6.03

LF = 3.36

Plunger ;

Planger run = 465

Supposed Dist=10

Micrometer = 10.5

Position = 10.5

Voltage = 7.91

Beam dumb = 0.75 nA

Collimeter =0.6 nA

Everythings is looking stable.

  68   Sat Mar 4 12:34:52 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0107.caendat

RU = 6.17

LF = 3.25

Plunger ;

Planger run = 479

Supposed Dist=10

Micrometer = 10.6

Position = 10.5

Voltage = 7.908

Beam dumb = 0.8 nA

Collimeter =0.7 nA

Everythings continues to stable.

  69   Sat Mar 4 13:43:20 2023 OSTRuns General 

RUN CONTROL = 36

Data =/onlineNEDA_00/xData/hil099/run_0036_03-03-2023_16h47m35s/needleRU_i36_0036_0114.caendat

RU = 7.30

LF = 3.70

Plunger ;

Planger run = 491

Supposed Dist=10

Micrometer = 10.9

Position = 10.4

Voltage = 7.924

Beam dumb = 1 nA

Collimeter =0.7 nA

Everythings continues to stable.

ELOG V3.1.5-fc6679b