| <p>==> DAQ started at : 23-06-14 at 05h-39m-53s<br />
==> Shell name : ./.user_start.sh<br />
File name : run<br />
Run number : 62<br />
User commentary :<br />
Start time : 2023-06-14 05:39:24.608419<br />
==> End of ./.user_start.sh</p>
<p>Beam: 115 MeV 24Mg</p>
<p>Target: 24Mg(1.5 mg/cm^2)</p>
<p>Beam current : 15 minutes after the run started operator decided to incease beam intensity; after an hour the current was 2 enA, and in the end of the run it was 7enA</p>
<p>Data flow: started with ~5 Mb/s; after an hour 25 Mb/s</p>
<p> </p>
<p>==> DAQ stopped at : 23-06-14 at 07h-39m-32s <br />
<br />
==> shell name : ./.user_stop_trunkv3.sh <br />
User commentary : <br />
Start time : 2023-06-14 05:39:48.085728<br />
Stop time : 2023-06-14 07:39:34.193301<br />
Run duration: 1:59:46.107573<br />
DATA saved : 6132533586<br />
GROUP saved : 0 (0,00 %)<br />
COUNTER saved : 18692169 (0,30 %)<br />
QDC saved : 4734288023 (77,19 %)<br />
CRRC4 saved : 0 (0,00 %)<br />
TRAPEZ saved : 1361601715 (22,20 %)<br />
SAMPLER saved : 0 (0,00 %)<br />
QT2T saved : 0 (0,00 %)<br />
SCALER saved : 0 (0,00 %)<br />
ELECTROMETER saved : 0 (0,00 %)<br />
MISSING TAG saved : 0 (0,00 %)<br />
MISSED TAG saved : 0 (0,00 %)<br />
OTHER saved : 17951679 (0,29 %)<br />
DATA lost : 0 (0,00 %)<br />
==> End of ./.user_stop_trunkv3.sh</p>
<p>Attached spectrum - scaled run 53 (blue) vs 62 - we have 24Mg beam beam</p> |