EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  Coulex experiments, Page 4 of 5  ELOG logo
Entry  Tue Jun 6 21:58:02 2023, MMM, Runs, , General, background run 
==> DAQ started at : 23-06-06 at 22h-24m-27s
==> Shell name      : ./.user_start.sh
    File name       : background_run
Entry  Fri Jun 16 01:54:10 2023, All, Runs, , General, alpha calibration - the end of the experiment 
==> DAQ started at : 23-06-15 at 15h-37m-57s
==> Shell name      : ./.user_start.sh
    File name       : alpha_15062023
Entry  Thu Jun 8 11:55:51 2023, pjn, Other, , Hardware, Target wheel IMG_0805_(1).jpeg
Targets on the wheel.

#1 hole

#2 empty 
Entry  Sun Jun 11 09:18:55 2023, Kasia, Magda, Piotr, Runs, , General, Spectra run 29 run29R2.pngrun29R2_upto2500.png

 
Entry  Tue Jun 6 09:24:12 2023, pjn, Other, , Hardware, Signals in DSSD scope_0.pngscope_3.png
Sector 0 chn 14 (typical)



Ring chn 14 (typical)
Entry  Mon Jun 5 12:21:55 2023, MMM, Other, , General, Shift plan 
Link to shift plan

https://docs.google.com/spreadsheets/d/1hnYBlyRJW45AZCMfruBYu4Y_9Ar-5hZoipXCNXUVGoc/edit?usp=sharing
Entry  Mon Jun 12 06:23:47 2023, Mihai, Runs, , General, Run54 Capture_d’écran_du_2023-06-12_06-18-45.png
Beam: 115 MeV 24Mg ????

Target: 24Mg(1.5 mg/cm^2)

Beam current: ~7.5 enA on target
Entry  Mon Jun 12 04:03:46 2023, Mihai, Runs, , General, Run53 Capture_d’écran_du_2023-06-12_04-04-33.png
Beam: 115 MeV 24Mg ????

Target: 24Mg(1.5 mg/cm^2)

Beam current: ~7.5 enA on target
Entry  Mon Jun 12 02:04:29 2023, Mihai, Runs, , General, Run52 Capture_d’écran_du_2023-06-12_02-04-15.png
Beam: 115 MeV 24Mg ????

Target: 24Mg(1.5 mg/cm^2)

Beam current: ~7 enA on target
Entry  Thu Jun 8 14:56:00 2023, MMM,MC,SP,PB, Runs, , General, Run 1 Capture_d’écran_du_2023-06-08_14-58-26.pngCapture_d’écran_du_2023-06-08_16-56-31.png
24Mg 1.5mg/cm^2 +110Mg 

beam current at the beginning of the run 1.5 enA

at the end beam current was 400 epA..... or less
Entry  Mon Jun 5 12:19:58 2023, MMM, Other, , General, Proposal Proposal_44Ti_42Ca_IJCLAB_PAC_ALTO.pdf
Setup: [B]NUBALL+PARIS+Warsaw DSSD[/B]
Entry  Tue Jun 6 09:27:54 2023, pjn, Problems, , Hardware, Problematic signals in DSSD scope_4.pngscope_5.pngscope_6.png
Sector 2 chns 9 and 10 (noisy)



Entry  Tue Jun 6 21:24:53 2023, MMM, Runs, , Hardware, Nuball detectors with ugly spectra 
We found 11 Germaniums with ugly spectra, after settings change 6 of them have now good spectra:

R3A6 red

R3A7 blue (now OK)
Entry  Sun Jun 11 19:21:46 2023, Konstantin, Desislava, Other, , General, Intense unshifted peaks 
The most intense stopped gamma peaks are as follows:

__________________________________________________________________________

3201 keV gamma from 41Ca
Entry  Mon Jun 12 09:09:22 2023, Magda, Runs, , General, DSSD voltage setup, from run_55 
From run 55 there is 50 V on rings and 0 V set on sectors.
 
Entry  Mon Jun 5 17:55:08 2023, MMM, GP, PJN, Other, , General, DSSD status  DSSD_picture.pdfIMG-8714.jpgIMG-8715.jpg
Sector1 - all present

Sector2 - all but 0,3,4,7

Ring - all but 4 (connected but no signal), 15
Entry  Mon Jun 12 01:09:50 2023, Mihai, Magda, Runs, , General, DSSD sectors voltage problem IMG-8838.jpg
 
Entry  Sat Jun 10 11:37:02 2023, MMM, Runs, , , DAQ restart  
DAQ restart
 
Entry  Mon Jun 12 16:07:33 2023, All, Runs, , Hardware, Change of the source 
Mon Jun 12  From
14:30 change of the source
Entry  Mon Jun 5 13:31:20 2023, MMM, GP, PJN, Other, , General, Calibration alpha+60Co 
=> DAQ started at : 23-06-05 at 13h-10m-37s                                                                                                                                                                                                                                  
 
==> Shell name      : ./.user_start.sh                   
ELOG V3.1.5-fc6679b