EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  Coulex experiments  ELOG logo
Message ID: 101     Entry time: Sun Jun 25 05:52:44 2023
Author: Konstantin, Desislava 
Type: Runs 
test:  
Category: General 
Subject: new run 69 

Beam current 8enA

Hakim came at 6:20 and by tuning the source brought back 23 enA. - wrong beam 62Ni

at 6:50 Hakim put 60Ni back with 42enA intensity.

Data wriging speed: ~5 MiB/s  - increased to 5.7 - increased to 7.2

ch 0: 11.99 ua

ch 2: 6.585 ua

ch 3: 5.205 ua

 

 

                

                                                  
==> DAQ started at : 23-06-25 at 06h-18m-32s       
==> Shell name      : ./.user_start.sh             
    File name       : run                          
    Run number      : 69                           
    User commentary : beam 8enA                    
    Start time      : 2023-06-25 06:12:42.082460   
==> End of ./.user_start.sh                        
                                                   
                                                   
                                                   

                                                                           
==> DAQ stopped                 at      : 23-06-25 at 08h-17m-46s

==> shell name : ./.user_stop_trunkv3.sh
    User commentary      : beam intensity increased to 42enA
    Start        time    : 2023-06-25 06:18:27.622611
    Stop         time    : 2023-06-25 08:17:48.955611
    Run          duration: 1:59:21.333000
    DATA         saved   :  959181069
    GROUP        saved   :          0 (0,00 %)
    COUNTER      saved   :   13940322 (1,45 %)
    QDC          saved   :  533569379 (55,62 %)
    CRRC4        saved   :          0 (0,00 %)
    TRAPEZ       saved   :  411671368 (42,91 %)
    SAMPLER      saved   :          0 (0,00 %)
    QT2T         saved   :          0 (0,00 %)
    SCALER       saved   :          0 (0,00 %)
    ELECTROMETER saved   :          0 (0,00 %)
    MISSING TAG  saved   :          0 (0,00 %)
    MISSED  TAG  saved   :          0 (0,00 %)
    OTHER        saved   :          0 (0,00 %)
    DATA         lost    :          0 (0,00 %)
==> End of ./.user_stop_trunkv3.sh

 

 

Attachment 1: Capture_d’écran_du_2023-06-25_05-53-59.png  66 kB  | Show | Hide all | Show all
Attachment 2: Capture_d’écran_du_2023-06-25_07-34-01.png  113 kB  Uploaded Sun Jun 25 08:33:20 2023  | Show | Hide all | Show all
Attachment 3: Capture_d’écran_du_2023-06-25_07-33-44.png  321 kB  Uploaded Sun Jun 25 08:33:28 2023  | Hide | Hide all | Show all
Capture_d’écran_du_2023-06-25_07-33-44.png
ELOG V3.1.5-fc6679b