EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  Coulex experiments  ELOG logo
Message ID: 11     Entry time: Sat Jun 17 07:37:24 2023
Author: KWL, JI 
Type: Runs 
test:  
Category: General 
Subject: run 5 62Ni (220 MeV) on 197Au taarget , 20 enA 

Beam untensity increased compared to the previous run . It is now 20 enA at the entrance to the chamber.

DSSD:

CH0: 9.81 uA

CH2: 5.53 uA

CH3: 4.31 uA

rate: 6.6 MB/s

 

==> DAQ started at : 23-06-17 at 07h-54m-09s
==> Shell name      : ./.user_start.sh
    File name       : run
    Run number      : 5
    User commentary : 62Ni, 197Au, pos 6, E=220 MeV, I~20 enA
    Start time      : 2023-06-17 07:53:17.063760
==> End of ./.user_start.sh

==> DAQ stopped                 at      : 23-06-17 at 09h-48m-33s

==> shell name : ./.user_stop_trunkv3.sh
    User commentary      :
    Start        time    : 2023-06-17 07:54:04.964464
    Stop         time    : 2023-06-17 09:48:36.049842
    Run          duration: 1:54:31.085378
    DATA         saved   :  818736184
    GROUP        saved   :          0 (0,00 %)
    COUNTER      saved   :   17834005 (2,17 %)
    QDC          saved   :  609578871 (74,45 %)
    CRRC4        saved   :          0 (0,00 %)
    TRAPEZ       saved   :  191323308 (23,36 %)
    SAMPLER      saved   :          0 (0,00 %)
    QT2T         saved   :          0 (0,00 %)
    SCALER       saved   :          0 (0,00 %)
    ELECTROMETER saved   :          0 (0,00 %)
    MISSING TAG  saved   :          0 (0,00 %)
    MISSED  TAG  saved   :          0 (0,00 %)
    OTHER        saved   :          0 (0,00 %)
    DATA         lost    :          0 (0,00 %)
==> End of ./.user_stop_trunkv3.sh

Attachment 1: Capture_d’écran_du_2023-06-17_07-36-04.png  66 kB  | Hide | Hide all
Capture_d’écran_du_2023-06-17_07-36-04.png
Attachment 2: Capture_d’écran_du_2023-06-17_07-47-14.png  239 kB  Uploaded Sat Jun 17 08:45:59 2023  | Hide | Hide all
Capture_d’écran_du_2023-06-17_07-47-14.png
ELOG V3.1.5-fc6679b