EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  Coulex experiments  ELOG logo
Message ID: 99     Entry time: Sun Jun 25 01:33:45 2023
Author: Konstantin, Desislava 
Type: Runs 
test:  
Category: General 
Subject: new run 67 

Beam could not be recouvered at higher than 10 enA;  decreased to 8enA, but stable                                            

==> DAQ started at : 23-06-25 at 01h-55m-42s     
==> Shell name      : ./.user_start.sh           
    File name       : run                        
    Run number      : 67                         
    User commentary :                            
    Start time      : 2023-06-25 01:55:07.614516
==> End of ./.user_start.sh                      
                                                                   

counting rate 5.0 Mb

Compton clean comparison to run 65 in attachements

 

==> DAQ stopped                 at      : 23-06-25 at 04h-02m-20s

==> shell name : ./.user_stop_trunkv3.sh
    User commentary      : low beam intensity about 10-8 enA
    Start        time    : 2023-06-25 01:55:37.775926
    Stop         time    : 2023-06-25 04:02:22.648272
    Run          duration: 2:06:44.872346
    DATA         saved   :  392481735
    GROUP        saved   :          0 (0,00 %)
    COUNTER      saved   :   14811733 (3,77 %)
    QDC          saved   :  233830013 (59,57 %)
    CRRC4        saved   :          0 (0,00 %)
    TRAPEZ       saved   :  143839989 (36,64 %)
    SAMPLER      saved   :          0 (0,00 %)
    QT2T         saved   :          0 (0,00 %)
    SCALER       saved   :          0 (0,00 %)
    ELECTROMETER saved   :          0 (0,00 %)
    MISSING TAG  saved   :          0 (0,00 %)
    MISSED  TAG  saved   :          0 (0,00 %)
    OTHER        saved   :          0 (0,00 %)
    DATA         lost    :          0 (0,00 %)
==> End of ./.user_stop_trunkv3.sh

 

                                                                                                                                                                                   

 

Attachment 1: Capture_d’écran_du_2023-06-25_01-35-06.png  66 kB  | Show | Hide all | Show all
Attachment 2: Capture_d’écran_du_2023-06-25_03-20-15.png  86 kB  Uploaded Sun Jun 25 04:19:02 2023  | Hide | Hide all | Show all
Capture_d’écran_du_2023-06-25_03-20-15.png
ELOG V3.1.5-fc6679b