EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
N-SI-85 exp22.41 N-SI-68 N-SI-69 N-SI-128 N-SI-137
  Coulex experiments, Page 7 of 7  ELOG logo
Entry  Sat Jun 17 16:04:34 2023, All, Runs, , General, run_9 

62Ni beam

ch0: 24.96V 10.47uA

ch2: 25.01V 5.94uA

ch3: 25.00V 4.535uA

 

=> DAQ started at : 23-06-17 at 16h-28m-25s                                                                                                                                                                       
==> Shell name      : ./.user_start.sh                                                                                                                                                                             
    File name       : run                                                                                                                                                                                          
    Run number      : 9
    User commentary : 62Ni on 197Au, intensity being adjusted by Hakim
    Start time      : 2023-06-17 16:25:55.009245
==> End of ./.user_start.sh
 

Entry  Sun Jun 18 15:23:42 2023, All, Runs, , General, run_23 - first 60Ni on 197Au - tuning Capture_d’écran_du_2023-06-18_15-25-21.png

up to run 28 beam intensity of about 4.5 enA

Entry  Sun Jun 18 19:24:19 2023, All, Other, , Other, change the foils every ~2 hours 

PAY attention to the stripper foil.

If the beam intensity drops to 15 enA, check the stripper foil.

It should be ~5 enA after the target (the meter on the counter)

Entry  Sun Jun 18 23:23:31 2023, All, Runs, , General, run 34 Capture_d’écran_du_2023-06-18_23-21-06.pngCapture_d’écran_du_2023-06-18_23-20-53.pngrun34-ch31.pngrun34_polar.png

at 00:40 beam intensity dropped to ~ 9enA . We increased the beam intensity by changing a stripper foil which resulted in 40 enA (~ 250 c in strip 1 counter in DSSD)  (KWL and JSP).

ch0: 24.96V 11.21uA

ch2: 25.01V 6.385uA

ch3: 25.00V 4.77uA

 

 File name       : run
    Run number      : 34
    User commentary : 60Ni on 197Au at 32 enA
    Start time      : 2023-06-18 23:46:00.726237
==> End of ./.user_start.sh

 

==> DAQ stopped                 at      : 23-06-19 at 01h-56m-25s                                                        
                                                                                                                         
==> shell name : ./.user_stop_trunkv3.sh                                                                                 
    User commentary      :                                                                                               
    Start        time    : 2023-06-18 23:46:20.040084                                                                    
    Stop         time    : 2023-06-19 01:56:27.110664                                                                    
    Run          duration: 2:10:07.070580                                                                                
    DATA         saved   : 1720912135                                                                                    
    GROUP        saved   :          0 (0,00 %)
    COUNTER      saved   :   20258819 (1,17 %)
    QDC          saved   : 1272135476 (73,92 %)
    CRRC4        saved   :          0 (0,00 %)
    TRAPEZ       saved   :  428517840 (24,90 %)
    SAMPLER      saved   :          0 (0,00 %)
    QT2T         saved   :          0 (0,00 %)
    SCALER       saved   :          0 (0,00 %)
    ELECTROMETER saved   :          0 (0,00 %)
    MISSING TAG  saved   :          0 (0,00 %)
    MISSED  TAG  saved   :          0 (0,00 %)
    OTHER        saved   :          0 (0,00 %)
    DATA         lost    :          0 (0,00 %)
==> End of ./.user_stop_trunkv3.sh
 

 

Entry  Thu Jun 22 18:22:56 2023, ALL, Runs, , General, run_37 Capture_d’écran_du_2023-06-22_18-19-44.pngCapture_d’écran_du_2023-06-22_18-24-24.png

60Ni

17 enA

charge state 17

target 197Au, pos 2

~5 MiB/s

ch 0 - 10.155

ch 2 - 5.865

ch 3 - 4.495

 

=> DAQ started at : 23-06-22 at 18h-30m-37s                                                                                                                                                                       
==> Shell name      : ./.user_start.sh                                                                                                                                                                             
    File name       : run                                                                                                                                                                                          
    Run number      : 37
    User commentary : restart of the data taking, isotope to be checked
    Start time      : 2023-06-22 18:29:59.374850
==> End of ./.user_start.sh

 

==> Add a commentary in the setup file ?                                        
    data is good, beam current less than 1 pnA
==> /data_nuball2/N-SI-137/run_37.setup has been written                        
                                                                                
==> DAQ stopped                 at      : 23-06-22 at 20h-30m-55s

==> shell name : ./.user_stop_trunkv3.sh
    User commentary      : data is good, beam current less than 1 pnA
    Start        time    : 2023-06-22 18:30:32.304774
    Stop         time    : 2023-06-22 20:30:57.962517
    Run          duration: 2:00:25.657743
    DATA         saved   :  510365595
    GROUP        saved   :          0 (0,00 %)
    COUNTER      saved   :   18712405 (3,66 %)
    QDC          saved   :  255594461 (50,08 %)
    CRRC4        saved   :          0 (0,00 %)
    TRAPEZ       saved   :  236058729 (46,25 %)
    SAMPLER      saved   :          0 (0,00 %)
    QT2T         saved   :          0 (0,00 %)
    SCALER       saved   :          0 (0,00 %)
    ELECTROMETER saved   :          0 (0,00 %)
    MISSING TAG  saved   :          0 (0,00 %)
    MISSED  TAG  saved   :          0 (0,00 %)
    OTHER        saved   :          0 (0,00 %)
    DATA         lost    :          0 (0,00 %)
==> End of ./.user_stop_trunkv3.sh

 

Entry  Sun Jun 25 18:32:55 2023, Waely, Runs, , General, new run 76 Capture_d’écran_du_2023-06-25_18-34-31.png

beam was found and is back....but 60Ni seems to not be there.....more like 58Ni....(red compared to blue)

I have called hakim back...who just left

start at 18:24

DAQ started at : 23-06-25 at 18h-49m-04s        
Shell name      : ./.user_start.sh              
File name       : run                           
Run number      : 76                            
User commentary :                               
Start time      : 2023-06-25 18:48:41.175707    
 

 

Beam current 19 enA

 

 

Data writing speed: ~6.5 MiB/s

ch 0: 12.3 ua

ch 2: 6.9 ua

ch 3: 5.7 ua

 

stop at 18:36

   User commentary      :                              
   Start        time    : 2023-06-25 18:48:59.334435   
   Stop         time    : 2023-06-25 19:02:08.083871   
   Run          duration: 0:13:08.749436               
   DATA         saved   :   91071560                   
   GROUP        saved   :          0 (0,00 %)          
   COUNTER      saved   :    1413118 (1,55 %)          
   QDC          saved   :   51683310 (56,75 %)         
   CRRC4        saved   :          0 (0,00 %)          
   TRAPEZ       saved   :   37975132 (41,69 %)         
   SAMPLER      saved   :          0 (0,00 %)          
   QT2T         saved   :          0 (0,00 %)          
   SCALER       saved   :          0 (0,00 %)          
   ELECTROMETER saved   :          0 (0,00 %)          
   MISSING TAG  saved   :          0 (0,00 %)          
   MISSED  TAG  saved   :          0 (0,00 %)          
   OTHER        saved   :          0 (0,00 %)          
   DATA         lost    :          0 (0,00 %)          
 

 

Entry  Sun Jun 25 18:37:44 2023, Waely, Runs, , General, new run 77 Capture_d’écran_du_2023-06-25_18-41-53.pngCapture_d’écran_du_2023-06-25_18-44-35.pngCapture_d’écran_du_2023-06-25_18-45-43.png

start at 18:36....hoping that it is 60Ni now.....

 

and it is !!!! and there is more of it!

beam intensity: 30 enA

 

rate to disk: 7 Mib/s

 

DAQ started at : 23-06-25 at 19h-02m-49s      
Shell name      : ./.user_start.sh            
File name       : run                         
Run number      : 77                          
User commentary :                             
Start time      : 2023-06-25 19:02:26.740448  

 

stop at .... 20;38
 

==> /data_nuball2/N-SI-137/run_77.setup has been written            
                                                                    
==> DAQ stopped                 at      : 23-06-25 at 21h-05m-07s

==> shell name : ./.user_stop_trunkv3.sh
    User commentary      :
    Start        time    : 2023-06-25 19:02:44.467897
    Stop         time    : 2023-06-25 21:05:09.565848
    Run          duration: 2:02:25.097951
    DATA         saved   : 1185819668
    GROUP        saved   :          0 (0,00 %)
    COUNTER      saved   :   14339364 (1,20 %)
    QDC          saved   :  675058737 (56,92 %)
    CRRC4        saved   :          0 (0,00 %)
    TRAPEZ       saved   :  496421567 (41,86 %)
    SAMPLER      saved   :          0 (0,00 %)
    QT2T         saved   :          0 (0,00 %)
    SCALER       saved   :          0 (0,00 %)
    ELECTROMETER saved   :          0 (0,00 %)
    MISSING TAG  saved   :          0 (0,00 %)
    MISSED  TAG  saved   :          0 (0,00 %)
    OTHER        saved   :          0 (0,00 %)
    DATA         lost    :          0 (0,00 %)
==> End of ./.user_stop_trunkv3.sh

 

 

 

ELOG V3.1.5-fc6679b