Entry  Mon Mar 6 16:28:42 2023, Iolanda, pjn, Other, General, PARIS BIAS Voltages Capture_d’écran_du_2023-03-06_16-16-11.pngCapture_d’écran_du_2023-03-06_16-16-55.pngCapture_d’écran_du_2023-03-06_16-16-25.pngCapture_d’écran_du_2023-03-06_16-15-57.pngCapture_d’écran_du_2023-03-06_16-16-39.png
 
Entry  Mon Mar 6 17:00:29 2023, All, , , Calibration with AmBeNi source for PARIS - part 2 Capture_d’écran_du_2023-03-06_17-00-18.png
Start 16:44

Start a second calibration run after changing the voltage offset of the FR1D5 (label 505) PARIS detector from 0.9 to 0.8.

Didn't recover detector FR1D8. Correlation matrix still look bad.
Entry  Mon Mar 6 18:01:02 2023, pjn, Other, Other, Target changer problem IMG_0435.jpeg
Target changet doesn't place taregts in a correct position.

There is no possibility to put a hole in a target position properly.

The chamber has to be oppened to fix it.
Entry  Mon Mar 6 22:10:30 2023, KWL PJN, Other, General, target holder IMG-20230306-WA0000.jpg
Target holder - positions:

1  hole

2  quartz
Entry  Tue Mar 7 01:16:15 2023, Desi, Michalina, , , No target run 
Beam intensity is 0.3 enA

No target on the beam, test run with wheel position 1

Start 00:40
Entry  Tue Mar 7 01:56:12 2023, Desi, Michalina, , , Run_1 
Run_1

Target position 4 - 208Pb 2 mg/cm^2

START: 01:52
Entry  Tue Mar 7 04:48:22 2023, Desi, Michalina, , , Run 2 Capture_d’écran_du_2023-03-07_04-47-27.pngCapture_d’écran_du_2023-03-07_05-00-00.png
We checked if the target is okay before the start of this run.
On the camera it looked attached and not broken.

However we have trouble interpreting the spectra. Seems like the lines in 40Ca are missing
Entry  Tue Mar 7 08:23:17 2023, pjn, Routine, General, run 4 Capture_d’écran_du_2023-03-07_08-26-41.png
start 8:20

beam cuurent: 0.3 enA

data stream 4.4 MB/s
Entry  Tue Mar 7 09:06:31 2023, pjn, Routine, General, run 5 Capture_d’écran_du_2023-03-07_09-07-37.png
start 9:05

Energy too high for the digitisers

Gain changed from 6 to 5 on MDU-16s
Entry  Tue Mar 7 05:59:17 2023, Desi, Michalina, , , Run 3 
Start 06:00

 

 
    Reply  Tue Mar 7 10:19:37 2023, pjn, , , Run 3 
for runs 1-3 energy was to high

corrected in run 4

 
Entry  Tue Mar 7 15:32:02 2023, KWL PJN, Other, General, improving beam intensity and a note on the DSSD spectra run5_sector2.pngrun4_sector2.pngrun3_sector2.png
Over a night 6/7 of March the beam intensity was very low , i.e. ~ 0.3 enA (compared to the 12 enA indicated in the proposal)  and the beam energy
was higher than requested in the proposal.

We have requested for a higher beam intensity. The operators are trying to improve it now.
Entry  Tue Mar 7 19:24:41 2023, Kasia WL, Kasia HK, PJN, , General, run with the empty frame hole2_test_scalers.png
Hakim et al., played with the beam - they put the C cone and tested it - it worked for C but then it didn't work with Ca.

We decided to take the beam. First run is the test with the empty frame to see the background.

Current - 0.35 enA = 0.03 pnA
Entry  Tue Mar 7 20:15:38 2023, pjn, Routine, General, run_6 Capture_d’écran_du_2023-03-07_20-16-26.png
Start 20:13

Stop 21:03

Beam current 0.25enA
Entry  Tue Mar 7 21:05:10 2023, KWL KHK PJN MKOM, Other, General, run 7 - change target to 197Au run7_197Au_pos6.png
we stopped run 6 with 208Pb target and we change target to the 197Au in order to see the target excitation in gamma ray spectrum.

started at 21:10

beam intensity: 0.45 enA
Entry  Tue Mar 7 22:39:36 2023, Kasia WL, Kasia HK, PJN, Other, , comaprison - Au and Pb targets spectrum_Pb.pngspectrum_Au.png
We decided to change the target to 197Au, 2 mg/cm2 (pos 6) in order to check how the gamma spectra look like.

We obtained a very clean gamma spectrum compared to the one collected with Pb target. We concluded that the Pb target is probably contaminated
and it's also probably the effect of the frame size - Au target is mounted on a frame with a bigger hole than Pb, means that we could have seen also
Entry  Tue Mar 7 23:35:38 2023, PJN MKOM, , , run_8 
==> DAQ started at : 23-03-08 at 00h-01m-07s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                               &nbs
Entry  Wed Mar 8 03:30:36 2023, MKOM, , , run_9 
==> DAQ started at : 23-03-08 at 01h-55m-20s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                               &nbs
Entry  Wed Mar 8 05:33:15 2023, MKOM, , , run_10 
==> DAQ started at : 23-03-08 at 04h-08m-42s                                                                                                                                                                     
 
==> Shell name      : ./.user_start.sh                                                                               &nbs
Entry  Wed Mar 8 07:44:09 2023, MKOM, , , run_11 
==> DAQ started at : 23-03-08 at 05h-59m-45s
==> Shell name      : ./.user_start.sh
    File name       : run
Entry  Wed Mar 8 07:45:21 2023, KHK, MKOM, , , run_12 run_12.png
Stopped because Hakim wants to change the source bottle to Ca - ammoniac

 

 