EAGLE
IRRADIATIONS
EXTERNAL
Analysis
Students Workshop
Shift Plans
GAMMA-ONLY
NEEDLE NEEDI
COULEX
PLUNGER
GENERAL
HIL102-128Cs
HIL087-176Pt
Nd148_2
176Pt
HIL109-172Os
HIL124-128Cs
HIL061
Nd148
HIL106-119Cs
HIL097-118Xe
HIL099-134Sm
April16
xdaq
HIL099-134Sm, Page 11 of 14
New
|
Find
|
Config
|
Logout
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Runs
Problems
Problem Fixed
Other
264 Entries
Goto page
Previous
1
,
2
,
3
...
10
, 11,
12
,
13
,
14
Next
All
ID
Date
Author
Type
test
Category
Subject
Text
64
Fri Mar 3 23:38:28 2023
SP
Runs
General
How different Ge count
All germanium detecors look reasonable,
as attached.
63
Fri Mar 3 20:50:31 2023
IK, MP, GJ
Other
Data analysis
Ge spectra
Ge rates increasing, similar to what it
was 24h before. Asking to decrease beam intensity
by a factor of 2.
62
Fri Mar 3 19:41:27 2023
IK
Problems
Hardware
Beamdump readout issue Vol.2.
Issue described in #61 continues to
persist.
Beam stopped from 19:20 to 19:32,
61
Fri Mar 3 17:52:41 2023
IK
Problem Fixed
Hardware
Beamdump readout issue - solved
Current readout issues from beamdump. Beam
stopped from 17:46-17:52, run 36 ongoing.
MP & GJ checking the grounding
60
Fri Mar 3 16:47:29 2023
IK
Runs
General
Run 36 started
Run 36 Started
New Beam energy is 150 MeV
The beam dumb currennt is 2.5 enA.
59
Fri Mar 3 15:04:33 2023
KWL
Other
General
run 35 stopped
Run 35 stopped. An attempt to check if
we can get 5 MeV higher beam energy.
58
Fri Mar 3 14:22:12 2023
IP
Runs
General
the beam comes back. The run 35 is still
going.
57
Fri Mar 3 13:54:41 2023
IP. KWL
Runs
General
beam energy measurement
beam stop due to the beam energy measurement
The beam energy: ~145 MeV
56
Fri Mar 3 13:43:56 2023
IP. KWL
Runs
511 annihilation and 279 Au lines in Ge rings
The counting rate in 511 keV line for sum
of the Ge detectors placed at 101, 117 and
143 degrees (with approved ACS). The largest
55
Fri Mar 3 12:11:24 2023
IP
Runs
General
the beam comes back.
54
Fri Mar 3 11:48:29 2023
IP
Runs
General
beam stopped
The beam is gone.
53
Fri Mar 3 11:37:25 2023
IP
Runs
General
plunger run # 230
Beam dump 1.2 enA (given
by operators) * 7 (following entry ID#39)
52
Fri Mar 3 10:21:18 2023
IP. KWL
Runs
General
beam intensity back to 1.25 enA at the beam dump
we increased beam intensity to 1.25 enA
(readout at the beam dump)
51
Fri Mar 3 10:09:20 2023
IP. KWL
Runs
General
beam intensity decreased to 0.3 enA (at beam dump) on our request
// we noticed yesterday that GE at 143
degrees counts more than those placed at
117 and 101. The 511 keV line (+ background)
50
Fri Mar 3 09:30:15 2023
IP. KWL
Runs
General
plunger run # 208
Beam dump 0.75 enA (given by operators)
* 7 (following entry ID#39) = 5.25 enA
49
Fri Mar 3 08:20:13 2023
KWL
Runs
General
plunger run # 196
Beam dump 1 enA (given by operators)
* 7 (following entry ID#39) = 7 enA
48
Fri Mar 3 07:32:28 2023
OST
Runs
General
plunger run # 188
Beam dump 2.5 enA
Collimator 0.8 enA
47
Fri Mar 3 06:24:03 2023
OST
Runs
General
plunger run # 178
Beam dump 2.5 enA
Collimator 0.9 enA
46
Fri Mar 3 05:18:35 2023
OST
Runs
General
plunger run # 167
Beam dump 2.5 enA
45
Fri Mar 3 04:15:32 2023
mgb
Runs
General
plunger run # 157
Beam dump 2.5 enA
Goto page
Previous
1
,
2
,
3
...
10
, 11,
12
,
13
,
14
Next
All
ELOG V3.1.5-fc6679b