EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 11 of 14  ELOG logo
IDdown Date Author Type test Category Subject
  64   Fri Mar 3 23:38:28 2023 SPRuns GeneralHow different Ge count

All germanium detecors look reasonable, as attached.

  63   Fri Mar 3 20:50:31 2023 IK, MP, GJOther Data analysisGe spectra

Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.

Attached Ge spectra before decreasing.
 

Before decreas beam current was 1.75enA, afterwards 1.1enA.

  62   Fri Mar 3 19:41:27 2023 IKProblems HardwareBeamdump readout issue Vol.2.

Issue described in #61 continues to persist.

Beam stopped from 19:20 to 19:32, run 36 ongoing; MP, GJ, BS entering the experimental hall. 

They changed the position of the grounding point on the chamber, moving it downstream after a fitting/joining part (A to B on the attached picture [artist: GJ]).

 

  61   Fri Mar 3 17:52:41 2023 IKProblem Fixed HardwareBeamdump readout issue - solved

Current readout issues from beamdump. Beam stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding and connection the beamdump readout. No visible issue found in the exp hall, but copper grounding wire was tightened, which seemingly resolved the issue (stability of beamdump readout).   

  60   Fri Mar 3 16:47:29 2023 IKRuns GeneralRun 36 started

Run 36 Started

New Beam energy is 150 MeV

The beam dumb currennt is 2.5 enA.

Plunger run = 282

 

  59   Fri Mar 3 15:04:33 2023 KWLOther Generalrun 35 stopped

Run 35 stopped. An attempt to check if we can get 5 MeV  higher beam energy.

  58   Fri Mar 3 14:22:12 2023 IPRuns General 

the beam comes back. The run 35 is still going.

 

plunger run # 257

Beam dump .... enA (given by operators) * 7 (following entry ID#39) = ... enA

Collimator  ....   enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0059.caendat

RU : 6.18 MB/s

LF : 8.44 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

 

  57   Fri Mar 3 13:54:41 2023 IP. KWLRuns Generalbeam energy measurement

beam stop due to the beam energy measurement

The beam energy: ~145 MeV

  56   Fri Mar 3 13:43:56 2023 IP. KWLRuns  511 annihilation and 279 Au lines in Ge rings

The counting rate in 511 keV line for sum of the Ge detectors placed at 101, 117 and 143 degrees (with approved ACS). The largest intensity is visible for Ge at 143 degrees, lowest for 101 deg.

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 3895

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 9392

=============================== RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 15767

 

The Coulex of 197Au (279.5 keV ) line is visible in all rings with a comparable intensity:

=============================== RING 101

Integration in spectrum user_ge_ring101_acceptedACS_clone.spc

RESULT : 12491

=============================== RING 117

Integration in spectrum user_ge_ring117_acceptedACS.spc

RESULT : 11443

===============================RING 143

Integration in spectrum user_ge_ring143_acceptedACS.spc

RESULT : 10460

 

 

 

  55   Fri Mar 3 12:11:24 2023 IPRuns General 

the beam comes back.

  54   Fri Mar 3 11:48:29 2023 IPRuns Generalbeam stopped

The beam is gone.

  53   Fri Mar 3 11:37:25 2023 IPRuns General 

plunger run # 230

Beam dump 1.2  enA (given by operators) * 7 (following entry ID#39) = 8.4 enA

Collimator   0.6  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0047.caendat

RU : 5.88 MB/s

LF : 8.35 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.94 V

  52   Fri Mar 3 10:21:18 2023 IP. KWLRuns Generalbeam intensity back to 1.25 enA at the beam dump

we increased beam intensity to 1.25 enA (readout at the beam dump)

  51   Fri Mar 3 10:09:20 2023 IP. KWLRuns Generalbeam intensity decreased to 0.3 enA (at beam dump) on our request

// we noticed yesterday that GE at 143 degrees counts more than those placed at 117 and 101. The 511 keV line (+ background) is much more pronounced for Ge at 143 degrees. To investigate this issue we decreased the beam intensity to 0.3 enA ( value given by operators at the beam dump ). 

Conclusion - decrease of the beam intensity does not explain above observations (se attached figs)

 

plunger run # 216

Beam dump 0.3 enA (given by operators) * 7 (following entry ID#39) = 2.1 enA

Collimator     enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0040.caendat

RU : 2.15 MB/s

LF : 5.60 MB/s

Supposed Distance = 10 um

position of the target = 10.6 um

micrometer = 8.8 um

Voltage = 7.8 V

  50   Fri Mar 3 09:30:15 2023 IP. KWLRuns General 

plunger run # 208

Beam dump 0.75 enA (given by operators) * 7 (following entry ID#39) = 5.25 enA

Collimator   0.75  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0037.caendat

RU : 3.85 MB/s

LF : 7,29 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9.3 um

Voltage = 7.93 V

  49   Fri Mar 3 08:20:13 2023 KWLRuns General 

plunger run # 196

Beam dump 1 enA (given by operators) * 7 (following entry ID#39) = 7 enA

Collimator   0.75  enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0033.caendat

RU : 4.10 MB/s

LF : 7.48 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9 um

Voltage = 7.94 V

  48   Fri Mar 3 07:32:28 2023 OSTRuns General 

plunger run # 188

Beam dump 2.5 enA

Collimator  0.8 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0030.caendat

RU : 4.15 MB/s

LF : 7.69 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 9 um

Voltage = 8.964 V

Readout data decreased 5 mb/s to 4 mb/s during 6:30 to 7:30 am. slowly returning to normal value

 

  47   Fri Mar 3 06:24:03 2023 OSTRuns General 

plunger run # 178

Beam dump 2.5 enA

Collimator  0.9 enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0027.caendat

RU : 4.65 MB/s

LF : 7.52 MB/s

Supposed Distance = 10 um

position of the target = 10.1 um

micrometer = 8.7 um

Voltage = 7.97 V

nothing has changed. the situation is stable.

  46   Fri Mar 3 05:18:35 2023 OSTRuns General 

plunger run # 167

 

Beam dump 2.5 enA

Collimator  1.0 enA

Run Data =/onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0022.caendat

RU : 4.90 MB/s

LF : 8.01 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.8 um

Voltage = 7.941 V

nothing has changed. the situation is stable.

  45   Fri Mar 3 04:15:32 2023 mgbRuns General 

plunger run # 157

 

Beam dump 2.5 enA

Collimator  1.0 enA

Run Data = /onlineNEDA_00/xData/hil099/run_0035_03-03-2023_00h04m26s/needleRU_i35_0035_0018.caendat

RU : 4.79 MB/s

LF : 7.69 MB/s

Supposed Distance = 10 um

position of the target = 10.2 um

micrometer = 8.9 um

Voltage = 7.94 V

Plunger off set 60 um

Which means we are running 60 um + 10 um (read from position window of plunger) = 70 um.

ELOG V3.1.5-fc6679b