EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 11 of 14  ELOG logo
ID Date Author Type test Categorydown Subject
  248   Sun Mar 12 07:01:31 2023 OSTRuns General 

run control = 58

run data =xdaq 2254808224 Mar 12 06:59 needleRU_i58_0058_0017.caendat

RU = 8.10 MB/s

LF =   3.79 MB/s

plunger:

plunger run = 1520

actual distance =  262.7 um

 

micrometer =   266.7 um

position = 30 um

voltage =  3.306 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

  249   Sun Mar 12 08:03:08 2023 OSTRuns General 

run control = 58

run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat

RU = 7.88 MB/s

LF =   3.70 MB/s

plunger:

plunger run = 1530

actual distance =  262.6 um

 

micrometer =   266.8 um

position = 29.9 um

voltage =  3.308 V

 

Beam dump: 1 nA 

Colimator :  0.5 nA

  252   Sun Mar 12 17:03:12 2023 OSTRuns General 

run control = 58

run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat

RU = 7.14 MB/s

LF =   3.46 MB/s

plunger:

plunger run = 1620

actual distance =  262.5 um

 

micrometer =   266.7 um

position = 29.8 um

voltage =  3.31 V

 

Beam dump: 0.7 nA 

Colimator :  0.5 nA

  253   Sun Mar 12 18:50:37 2023 OSTRuns General 

run control = 58

run data =xdaq  471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat

RU = 7.35 MB/s

LF =   3.50 MB/s

plunger:

plunger run = 1638

actual distance =  262.6 um

 

micrometer =   266.9 um

position = 29.8 um

voltage =  3.308 V

 

Beam dump: 0.7 nA 

Colimator :  0.5 nA

  254   Sun Mar 12 19:00:59 2023 OSTRuns GeneralRun 58 stopped and Run 59 started.

18:54 Run 58 stopped and 18:55 Run 59 started.

BEAM STOPPED.

END of EXPERIMENT.

Run 59 collects radioactivity.

 

-rw-rw-r-- 1 xdaq xdaq 295178920 Mar 12 18:59 needleLF_i58_0059_0000.adf
-rw-rw-r-- 1 xdaq xdaq 802293316 Mar 12 18:59 needleRU_i59_0059_0000.caendat

  255   Sun Mar 12 19:20:37 2023 MPRuns Generalrun 60, radioactivity,

Run 59 collected data using gg trigger radioactivty

Run 60 trigger changed fropm gg to single g.

Just in the beginning a few minutes gg data could have been collected.

  256   Sun Mar 12 20:31:45 2023 GJRuns Generalrun_61 - target and stopper and beam dump dismounted.
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained. 

pure background, g trigger only.

Michal says the"bg" spectrum did not change...
  258   Sun Mar 12 21:33:54 2023 GJRuns Generalrun 63 - 152 Eu during LN2 filling
  259   Sun Mar 12 22:52:36 2023 Bahadir SaygiOther GeneralPlunger Run Files

Plunger run files for later to calculate error in the distance

  63   Fri Mar 3 20:50:31 2023 IK, MP, GJOther Data analysisGe spectra

Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.

Attached Ge spectra before decreasing.
 

Before decreas beam current was 1.75enA, afterwards 1.1enA.

  9   Wed Mar 1 00:14:28 2023 MPOther Beambeam energy
Beam energy measured:  148.2 MeV
Mind that this may be an overestimate (by ~1-2 MeV)
  11   Wed Mar 1 12:51:33 2023 MPRuns Beambeam on the target
Beam on the target:

target+stopper+beam dump: 25 enA   (1.7 pnA)    not stable
5 mm collimator:  0.8 enA 

data taking continued with run 0023
  100   Mon Mar 6 05:15:43 2023 JD, DWProblems BeamNo beam 05:10:00

No beam 05:10:00

  101   Mon Mar 6 05:16:46 2023 JD, DWProblem Fixed Beam 

Beam back on 05:15

  107   Mon Mar 6 09:53:06 2023 OSTProblems BeamBeam dump decreased 2.5 nA to 1.5 nA- stopped run 41

9:20 to 9:50 am beam current stayed 2.5 nA . After 9:50 am decrease 1.5 nA

  113   Mon Mar 6 17:19:24 2023 OSTProblems Beambeam unstable and a little high

16:30 beam increased 5 mb/s to 9 mb/s and stayed 1 hour 9 mb/s

17:10 beam fixed. stable

  127   Tue Mar 7 09:18:01 2023 OSTProblems Beamrun number 44 crashed and local filter turned red-but data saved

9:08 local filter turned red. Both .caendat and   LF .adf files still incrementing. Stopped run 44, started run 45, looks OK.

 

 

  128   Tue Mar 7 09:20:53 2023 OSTProblem Fixed Beamrun 45 start-local filter turn green

I started run 45, and local filter turn green everything is ok.

  144   Tue Mar 7 20:42:03 2023 IPProblems Beambeam unstable

There was a problem with the beam from 20:19 to 20:30.

Now it is fine.

  153   Wed Mar 8 02:45:53 2023 KS, KSzOther Beamincrease in Counting Rates

Since 2:32 increased counting rate observed:

Sinde 3:45 decrease to 1.5 kHz ch4.

run control = 48

/onlineNEDA_00/xData/hil099/run_0048_08-03-2023_01h08m57s/needleRU_i48_0048_0007.caendat
run data =

RU =  8.69 MB/s

LF =   3.79 MB/s

Eagle Rated ch4: around 2.3 kHz

plunger: (2:48)

plunger run = 514

actual distance =  382.7 um

supposed distance = 382.7 um

micrometer =   383.5 um

position =  149.8 um

voltage =  2.144 V

 

Beam dump =  1.5 nA

Collimater=  0.5 nA

ELOG V3.1.5-fc6679b