Sun Mar 12 07:01:31 2023, OST, Runs, , General,
|
run control = 58
run data =xdaq 2254808224 Mar 12 06:59 needleRU_i58_0058_0017.caendat
RU = 8.10 MB/s |
Sun Mar 12 08:03:08 2023, OST, Runs, , General,
|
run control = 58
run data = xdaq 3303602776 Mar 12 08:01 needleRU_i58_0058_0024.caendat
RU = 7.88 MB/s |
Sun Mar 12 17:03:12 2023, OST, Runs, , General,
|
run control = 58
run data =xdaq 1111949504 Mar 12 17:01 needleRU_i58_0058_0083.caendat
RU = 7.14 MB/s |
Sun Mar 12 18:50:37 2023, OST, Runs, , General,
|
run control = 58
run data =xdaq 471656980 Mar 12 18:47 needleRU_i58_0058_0095.caendat
RU = 7.35 MB/s |
Sun Mar 12 19:00:59 2023, OST, Runs, , General, Run 58 stopped and Run 59 started.
|
18:54 Run 58 stopped and 18:55 Run 59 started.
BEAM STOPPED.
END of EXPERIMENT. |
Sun Mar 12 19:20:37 2023, MP, Runs, , General, run 60, radioactivity,
|
Run 59 collected data using gg trigger radioactivty
Run 60 trigger changed fropm gg to single g.
Just in the beginning a few minutes gg data could have been collected. |
Sun Mar 12 20:31:45 2023, GJ, Runs, , General, run_61 - target and stopper and beam dump dismounted.
|
target and stopper and beam dump dismounted.
only the constructional elements of the plunger remained.
|
Sun Mar 12 21:33:54 2023, GJ, Runs, , General, run 63 - 152 Eu during LN2 filling
|
| |
Sun Mar 12 22:52:36 2023, Bahadir Saygi, Other, , General, Plunger Run Files 
|
| Plunger run files for later to calculate error in the distance |
Fri Mar 3 20:50:31 2023, IK, MP, GJ, Other, , Data analysis, Ge spectra 
|
Ge rates increasing, similar to what it was 24h before. Asking to decrease beam intensity by a factor of 2.
Attached Ge spectra before decreasing.
|
Wed Mar 1 00:14:28 2023, MP, Other, , Beam, beam energy
|
Beam energy measured: 148.2 MeV
Mind that this may be an overestimate (by ~1-2 MeV) |
Wed Mar 1 12:51:33 2023, MP, Runs, , Beam, beam on the target
|
Beam on the target:
target+stopper+beam dump: 25 enA (1.7 pnA) not stable
|
Mon Mar 6 05:15:43 2023, JD, DW, Problems, , Beam, No beam 05:10:00
|
| No beam 05:10:00 |
Mon Mar 6 05:16:46 2023, JD, DW, Problem Fixed, , Beam,
|
| Beam back on 05:15 |
Mon Mar 6 09:53:06 2023, OST, Problems, , Beam, Beam dump decreased 2.5 nA to 1.5 nA- stopped run 41
|
| 9:20 to 9:50 am beam current stayed 2.5 nA . After 9:50 am decrease 1.5 nA |
Mon Mar 6 17:19:24 2023, OST, Problems, , Beam, beam unstable and a little high
|
16:30 beam increased 5 mb/s to 9 mb/s and stayed 1 hour 9 mb/s
17:10 beam fixed. stable |
Tue Mar 7 09:18:01 2023, OST, Problems, , Beam, run number 44 crashed and local filter turned red-but data saved
|
9:08 local filter turned red. Both .caendat and LF .adf files still incrementing. Stopped run 44, started run 45, looks OK.
|
Tue Mar 7 09:20:53 2023, OST, Problem Fixed, , Beam, run 45 start-local filter turn green
|
| I started run 45, and local filter turn green everything is ok. |
Tue Mar 7 20:42:03 2023, IP, Problems, , Beam, beam unstable
|
There was a problem with the beam from 20:19 to 20:30.
Now it is fine. |
Wed Mar 8 02:45:53 2023, KS, KSz, Other, , Beam, increase in Counting Rates
|
Since 2:32 increased counting rate observed:
Sinde 3:45 decrease to 1.5 kHz ch4.
run control = 48 |
|