EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 12 of 14  ELOG logo
Entry  Wed Mar 8 07:30:15 2023, KS, KSz, Problems, , Beam, beam unstable 
The beam was unstable from 7:18 to 7:25.
Entry  Wed Mar 8 07:57:05 2023, IK, Problems, , Beam, beam unstable Screenshot_2023-03-08_08-17-41.png
The beam was unstable from 7:55. Stabilized around 8:03.

Counting rates are higher, EAGLE det4 went to ~2.5kHZ from ~2kHz (attached).

According to the operator, a bit of a tuning was done, current is 1nA.
Entry  Wed Mar 8 14:47:34 2023, AM, Runs, , Beam, beam unstable 
two drops in beam intesitivity at 14:33, 14:37 and 14:51
Entry  Thu Mar 9 13:22:37 2023, OST, Other, , Beam, beam stopped 13:21-13:24 for control 
 
Entry  Thu Mar 9 13:37:33 2023, OST, Other, , Beam, Beam stopped 13:37-13:49 for control again. 
 
Entry  Fri Mar 10 08:02:39 2023, AM, Problems, , Beam, bigger data rate  
rate of ch4 above 2kHz, too big beam intesivity, highier data rate from: 07:51
 
Entry  Fri Mar 10 19:30:48 2023, IP, Runs, , Beam, stop beam  
the beam was stopped at 19:27


 
Entry  Fri Mar 10 19:32:01 2023, IP, Runs, , Beam, start beam 
the beam start: 19:31
Entry  Fri Mar 10 20:54:20 2023, IP, Problems, , Beam, lost the beam 
the beam was lost at 20:46. The operator is working to solve the problem.
Entry  Fri Mar 10 21:00:15 2023, IP, Problem Fixed, , Beam, the beam comes back 
the beam comes back at 20:54
Entry  Fri Mar 10 21:24:29 2023, IP, Runs, , Beam, the beam stopped 
the beam is stopped at 21:23.
Entry  Fri Mar 10 21:26:55 2023, IP, Problems, , Beam, problem with focus the beam 
the beam is not the best focused. The operator works on this problem.
Entry  Fri Mar 10 21:29:28 2023, IP, Runs, , Beam, beam start 
the beam starts at 21:27.

But the operators are still working on focusing the beam.
Entry  Fri Mar 10 21:30:42 2023, IP, Problem Fixed, , Beam, the beam is focused 
the beam is now good focused
Entry  Sat Mar 11 17:58:35 2023, OST, Runs, , Beam,  
beam stopped 17:54.
Entry  Sat Mar 11 18:06:36 2023, OST, Runs, , Beam,  
beam started 18:04.
Entry  Mon Feb 27 12:13:03 2023, MB, Other, , , Plunger Informations 
Off set of the plunger ~60 um

Distcal file   distcal01_vac

 
Entry  Tue Feb 28 23:08:35 2023, BS, Other, , , SHIFT LIST 
https://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing


The data from google sheet obtained 14:17 07/03/23
Entry  Tue Feb 28 23:10:36 2023, BS, Other, , , What we need to include for Plunger 
Plunger Run :

Micrometer :

Supposed Distance:
Entry  Wed Mar 1 11:52:48 2023, MP, Runs, , , first beam 
Operators tune beam on the target, collecting run 0023, trigger gg.
ELOG V3.1.5-fc6679b