Mon Feb 27 12:21:29 2023, MP, BS, Runs, , General, List of runs
|
A list of runs, to be filled during the experiment is available here:
https://docs.google.com/spreadsheets/d/11tyI5pqYKJ-rMaYLuBIPZCClWz9Vu87W0R5AZc2srd8/edit?usp=sharing |
Wed Mar 1 19:04:37 2023, BS, Runs, Run, General, Run 26 Started
|
Run 26 Started
Beam 9 enA on the collimator |
Wed Mar 1 20:10:38 2023, BS, DOD, Other, , General,
|
Run 26 is going on but not much for the moment in terms of any useful data.
And half of the EAGLE is opened.
20:50 EAGLE closed. |
Wed Mar 1 21:59:45 2023, MB BS, Other, , General,
|
Offset of the plunger is 60 um.
new distcal01_vac_after_opening |
Thu Mar 2 00:30:29 2023, BS, DOD, Runs, , General,
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
Thu Mar 2 04:17:40 2023, DOD, Runs, , General,
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
Thu Mar 2 05:33:34 2023, ost-dod, Runs, , General,
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
Thu Mar 2 07:40:55 2023, ost-dod, Runs, , General,
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
Thu Mar 2 09:20:17 2023, ost-mgb, Runs, , General, Rates
|
Run 27 with single gamma trigger
Plunger feedback system is not conected.
Data |
Thu Mar 2 09:24:47 2023, ost-mgb, Runs, Run 27 stopped, General,
|
| Run 27 stopped |
Thu Mar 2 09:49:13 2023, BS, Runs, , General, run 28 started
|
| run 28 started |
Thu Mar 2 10:18:14 2023, ost-mgb, Runs, , General, run 29 started
|
Run 29 with single gamma trigger
Plunger feedback system is not connected.
Data |
Thu Mar 2 11:14:44 2023, ost-mgb, Runs, , General,
|
un 29 with single gamma trigger
Plunger feedback system is not connected.
Data |
Thu Mar 2 11:19:06 2023, BS, Runs, , General, Run 30 Starts
|
We hane now g-g trigger started.
Run 30 started |
Thu Mar 2 12:09:44 2023, ost-mgb, Runs, , General,
|
| beam stop, |
Thu Mar 2 13:50:50 2023, BS, Runs, , General, Run 30 Continueed
|
EAGLE is closed now
We gave a break to test the cable connection of target, degrader, beam dump and collimator.
Run 30 continues to collect data, we did not stop it. |
Thu Mar 2 14:59:32 2023, mgb, Runs, , General,
|
Data |
Thu Mar 2 15:15:40 2023, mgb, Runs, , General, beam stopped. eagle is opened and run 30 continues
|
Data
Position = 522.6
Supposed = 520 |
Thu Mar 2 16:06:17 2023, A.T., Runs, , General,
|
Data
Position = 522.6
Supposed = 520 |
Thu Mar 2 16:40:45 2023, MP, Runs, , General, changing the plunger distance to minimum.
|
Run 31 was stopped, because plunger distance is reduced to the mininimal one.
It takes time, in the meantime, after some break, run 32 was started, with no beam. |
|