EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 1 of 14  ELOG logo
Entry  Tue Mar 7 09:56:07 2023, OST, Problems, , mechanics, Beam stopped and operators controlling number 15_Ge dedector. 
 
Entry  Mon Feb 27 12:10:24 2023, BS, Other, , Target, target 
Support of Target = 1.5 mg/cm2 Ta
Target            = 1.0 mg/cm2 Cd-106
Stopper           = 10 mg/cm2 Au
Entry  Mon Mar 6 00:30:32 2023, MP, ANJ, Other, , Target, new target mounted 
New target mounted.

106Cd 1 mg/cm2

181Ta  1.2 mg/cm2
Entry  Fri Mar 3 02:23:45 2023, GJ, Problems, , Software, builder gate, TS offsets run_0035_BU_lenghts.png
Data from current run - 35, with limited beam current and rates - see a recent post by Güray.
BU level, so what we see in Greware (both online & nearline).
Attached is the fold of Germaniums.
Entry  Tue Mar 7 09:41:44 2023, OST, Problems, , Software, number_Ge_15 dedector not taking data 
after run 45 I reset all spectrums and number_Ge_15 dedector not taking data.

i check the fans_monitor_scaler (EAGLE_array_monitor) monitor and number 15 Ge, number ACS 5 never change the color just staying
white there is a problem.
Entry  Tue Mar 7 15:12:06 2023, OST, Problems, , Software, run 45 stopped 
14:30 pm to 15:00 run 45 crashed and stopped
Entry  Tue Mar 7 15:14:29 2023, OST, Problem Fixed, , Software, Run 46 started-15_Ge and number 5 anticompton working now. 
VME crate with CAEN digitizers was rebooted.

Run 46 started, number 15_Ge and number 5 anticompton dedector working now.

 
Entry  Fri Mar 10 23:27:51 2023, IP, Problems, , Software, run 53 - stopped 
the daq crashed at 22:43 -- problem with Local Filter

the run 53 - stopped
Entry  Fri Mar 10 23:29:43 2023, IP, Problem Fixed, , Software, new run 54 
the daq resolved at 23:15

start new run: run 54
Entry  Sun Mar 12 00:09:35 2023, AF, Problem Fixed, , Software, caen_shifted correction in spy & greware 
neda_psdcaen_positions.txt had weird values for three first detectors, especially neda_02.

It was:
Entry  Sun Mar 5 16:58:45 2023, MP, Problems, , Other, run 37 crashed, run 38 junk 
Run 37 stopped by itslelf at 15:43. This was noticed at about 16:10 by observing that grafana data rates do not change.

Stop at Run COntrol.  LF looks  disabled.

Attempt to restart normal way --> run 38  --> failed
Entry  Fri Mar 10 01:28:48 2023, AM, Problems, , Other, Plunger distance 
longer break during chane of plunger distance due to technical problem, you can not move plunger to larger distances, so now we are choosing smaller
distance in the morning we ask the specialists
 
Entry  Sun Mar 12 03:05:45 2023, GJ, AF, Problems, , Network, no data flux visible in grafena, LF prints "write: Broken pipe" 
As in the title, see below.
The data are still being constantly written on the disks with usual rate (also visible on grafena).
Greware is also seeing data.
Entry  Thu Mar 2 23:04:01 2023, GJ, Problem Fixed, , Hardware, Connection of the plunger cables, grounding, beam read-out for the operators Slp823030222550.pdf
Notes of the measurements with different conditions are attached.

Conclusion:
Entry  Fri Mar 3 17:52:41 2023, IK, Problem Fixed, , Hardware, Beamdump readout issue - solved 
Current readout issues from beamdump. Beam stopped from 17:46-17:52, run 36 ongoing.

MP & GJ checking the grounding and connection the beamdump readout. No visible issue found in the exp hall, but copper grounding wire
was tightened, which seemingly resolved the issue (stability of beamdump readout).   
Entry  Fri Mar 3 19:41:27 2023, IK, Problems, , Hardware, Beamdump readout issue Vol.2. 333626140_152534624340296_7230383118242592907_n.jpg
Issue described in #61 continues to persist.

Beam stopped from 19:20 to 19:32, run 36 ongoing; MP, GJ, BS entering the experimental hall. 

They changed the position of the grounding point on the chamber, moving it downstream after a fitting/joining part (A to B on the attached
Entry  Thu Mar 9 01:41:50 2023, GJ, Problem Fixed, , Hardware, TS zeroing - cables to S-IN from VME controller - between runs 49 and 50 
Since we were observing jumps of 16 ns in timings of all channels of whole boards, the assumption was that the 
signals from logical FIFO arrive at different times to S-IN inputs to zero the TS counters.
6 originally placed cables of quite the same length were replaced with 6 cables of declared 3-ns length, same 
Entry  Sun Feb 26 16:50:56 2023, GJ, Other, , General, proposal HIL-Proposal-134Sm-Bahadir-Saygi-very-last.pdf
 
Entry  Sun Feb 26 17:26:45 2023, GJ, Other, , General, List of participants 
To be filled in, with affiliation and email.

Presumably, for later publication purposes.
 
Entry  Mon Feb 27 02:49:10 2023, GJ, Runs, , General, calibs - 2x 152Eu - run 0 
Run number: 0
Trigger: g
Start time: Mon Feb 27 02:43:50 2023
ELOG V3.1.5-fc6679b