EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 14 of 15  ELOG logo
Entry  Thu Mar 2 11:17:54 2023, BS, Runs, , , Run 29 stopped 
We will change the trigger and we stopped the run number 29
Entry  Thu Mar 2 17:28:21 2023, BS, Runs, , , Run 33 Started 
Run 33 Started

Plunger Run : 48

Supposed Distance = 10 um
Entry  Fri Mar 3 00:09:19 2023, MP, AT, Runs, , , run 35 
Started after beam current was reduced by a factor of 2

plunger run # 116

Earlier:   CUP#6  100 enA
Entry  Fri Mar 3 13:43:56 2023, IP. KWL, Runs, , , 511 annihilation and 279 Au lines in Ge rings ge_rings101_117_143_acceptedACS_gold_line_279keV.pngge_rings101_117_143_acceptedACS.png
The counting rate in 511 keV line for sum of the Ge detectors placed at 101, 117 and 143 degrees (with approved ACS). The largest intensity is visible
for Ge at 143 degrees, lowest for 101 deg.

=============================== RING 101
Entry  Sun Mar 5 22:32:56 2023, MP, Other, , , change of the target 6x
See pictures in the attachment:

1) stopper seen from the back (upstream view)

2) stopper  seen from the front (downstream view)
Entry  Sat Mar 11 09:29:48 2023, EG, Other, , , current exeriment parameters as requested in the manual for shifters 
41_ge_single_theta 101,117,143 looks ok. No peakdeformation of 511, other gammas FWHM around half of that of511 - ok

ch4 in total rate EAGLE_0 arouns 2.1 kHz - ok

planger tollerace limits (green and blue horizontal markers) set far of the current distance, intantionally?
Entry  Sat Mar 11 10:46:37 2023, EG, Other, Beam intensity, ,  
ch4 in total rate EGALE_) reached 2.4 kHz, beam intensity has been reduced to fit the required 2kHz.

 
Entry  Sat Mar 11 11:39:55 2023, EG, Problems, , , Buffers clearing 
at 11:34:50 sek on 11 march a spike in counting rate of some Ge detectors is observed. Buffers not cleared properly?


 
Entry  Sat Mar 11 12:42:42 2023, EG, Other, , , Beam intensity reduction 
Again beam intensity gradually increased reaching 2.4 kHz ontotal rate EAGLE_0 ch4.  Beam intensity reduction requested. 1.8 kHz on ch4 after reduction.
Entry  Sat Mar 11 14:15:55 2023, EG, Runs, , , Beam intensity rapid increase  
14:12 beam intensity instability. Rapid increase of beam intensity - twice the previous value. Returned to normal after 4 minutes.
Entry  Sat Mar 11 14:42:28 2023, EG, Runs, , , Beam instabilities 
Large beam intensity instabilities from 14:10 till 14:40.  Beam intensity reduction requested. CH4 on Total rate EAGLE_0 returned to 1.9kHz. Intensity
became stable.

 
Entry  Sat Mar 11 15:16:31 2023, EG, Other, , , Beam intensity reduced again 
Again beam intensity to high. Reduced to 2 kHz on ch4 GE
Entry  Sun Mar 12 09:15:00 2023, EG, Other, , , Array_monitors mat refresh synchronization 
Beam stable, counting rate within limits, plunger distance within the given tollerance, gamma spectra ok, everything looks good but....

(yes there must be some "but"), refreshing of EAGLE_array_monitor.mat and NEDA_array_monitor.mat are out of sync. Mostly pure red colour
is dysplayed. Not very usefull and (I suppose) missleading information.
Entry  Sun Mar 12 13:20:00 2023, EG, Problems, , , No Data 
For a split second a red "NO DATA" notification appeared in the top right corner of Counting rates dashboard.

It looks like it did not change anything in data collection.

Entry  Sun Mar 12 20:55:08 2023, MP, Runs, , , runc62 152 for efficiency calibration 
started

source in the target position, as precisely as possible

 
Entry  Mon Mar 13 12:15:35 2023, MP, Other, , , measurement of radioactivity along the beam line 
At about 12:00, 13/03/2023 (about  17 hours after the beam was stopped), a measurement of activity of the beam line was performed using  FH
40G-L10 meter.

Radioctivity run 65 stopped before the measurement, radioactivity run  66 started after the measurement
Entry  Mon Mar 13 12:16:31 2023, MP, Other, , , run 66 
run 66 started, radiocativity (background)

 
Entry  Mon Mar 13 15:16:21 2023, MP, Other, , , list of files copied to Bahadir's disks disk1.list_of_filesdisk2.list_of_files
Attached are the lists of files copied to the two 4 TB Bahadir's disks.

 

 
Entry  Thu Mar 16 12:13:11 2023, MP, Other, , , test of radioactivity rings_16mar2023_0905.pngrings143_16mar2023_0908.pngrings143_16mar2023_0920.png
16/03/2023

Plunger chamber closed, some dummy target and stopper probably inside

run 72    eagle closed
Entry  Mon Mar 20 04:55:24 2023, MP, Other, , , missing caendat.bz2 on Bahadir's disk 
The following  caendat.bz2 files were not copied to Bahadir's disks 
(because they were not bzipped at the time of the copying):
ELOG V3.1.5-fc6679b