EAGLE IRRADIATIONS EXTERNAL Analysis Students Workshop Shift Plans
GAMMA-ONLY NEEDLE NEEDI COULEX PLUNGER GENERAL
HIL102-128Cs HIL087-176Pt Nd148_2 176Pt HIL109-172Os HIL124-128Cs HIL061 Nd148 HIL106-119Cs HIL097-118Xe HIL099-134Sm April16 xdaq
  HIL099-134Sm, Page 13 of 15  ELOG logo
Entry  Fri Mar 10 08:02:39 2023, AM, Problems, , Beam, bigger data rate  
rate of ch4 above 2kHz, too big beam intesivity, highier data rate from: 07:51
 
Entry  Fri Mar 10 19:30:48 2023, IP, Runs, , Beam, stop beam  
the beam was stopped at 19:27


 
Entry  Fri Mar 10 19:32:01 2023, IP, Runs, , Beam, start beam 
the beam start: 19:31
Entry  Fri Mar 10 20:54:20 2023, IP, Problems, , Beam, lost the beam 
the beam was lost at 20:46. The operator is working to solve the problem.
Entry  Fri Mar 10 21:00:15 2023, IP, Problem Fixed, , Beam, the beam comes back 
the beam comes back at 20:54
Entry  Fri Mar 10 21:24:29 2023, IP, Runs, , Beam, the beam stopped 
the beam is stopped at 21:23.
Entry  Fri Mar 10 21:26:55 2023, IP, Problems, , Beam, problem with focus the beam 
the beam is not the best focused. The operator works on this problem.
Entry  Fri Mar 10 21:29:28 2023, IP, Runs, , Beam, beam start 
the beam starts at 21:27.

But the operators are still working on focusing the beam.
Entry  Fri Mar 10 21:30:42 2023, IP, Problem Fixed, , Beam, the beam is focused 
the beam is now good focused
Entry  Sat Mar 11 17:58:35 2023, OST, Runs, , Beam,  
beam stopped 17:54.
Entry  Sat Mar 11 18:06:36 2023, OST, Runs, , Beam,  
beam started 18:04.
Entry  Thu Apr 9 15:07:01 2026, OST, Runs, , Beam,  
beam started 18:04.
    Reply  Wed Apr 15 13:32:24 2026, JD, DW, Problem Fixed, , Beam,  
 




Quote:



Beam back on 05:15
Entry  Mon Feb 27 12:13:03 2023, MB, Other, , , Plunger Informations 
Off set of the plunger ~60 um

Distcal file   distcal01_vac

 
Entry  Tue Feb 28 23:08:35 2023, BS, Other, , , SHIFT LIST 
https://docs.google.com/spreadsheets/d/1e2homI9RCYrg369z8aaY3VMIPgapUPOv0zKISsl58vQ/edit?usp=sharing


The data from google sheet obtained 14:17 07/03/23
Entry  Tue Feb 28 23:10:36 2023, BS, Other, , , What we need to include for Plunger 
Plunger Run :

Micrometer :

Supposed Distance:
Entry  Wed Mar 1 11:52:48 2023, MP, Runs, , , first beam 
Operators tune beam on the target, collecting run 0023, trigger gg.
Entry  Wed Mar 1 16:06:50 2023, BS, Runs, , , Run 23 Stopped 
Run 23 Stopped due to some unexpected spikes in the

voltage of collimator.

The plunger did not responde to change distance.
Entry  Wed Mar 1 16:07:49 2023, BS, Runs, , , Run 24 Started 
Run 24 has been started but no beams at the moment.

EAGLE is opened.

Just colecting background.
Entry  Thu Mar 2 09:05:43 2023, DOD, Problems, , , Sulphur on aluminium fusion-evaporation reactions 
Using  the data which we've sorted to date, I looked into the gamma-gamma coincidences and have identified a number of nuclei e.g. 50Cr, 52Mn,
55Fe which would be consistent with fusion-evaporation reactions involving the sulphur-32 projectiles and aluminium-27. Such reactions would yield a 59Cu
comound system and these channels would be populated as a result of the evaporation of a combination of alphas, protons and neutrons.
ELOG V3.1.5-fc6679b